COMPANY RECORD · MINNEAPOLIS, MN
Mint Roofing — permit history in Minneapolis, MN
Mint Roofing appears on 35 Minneapolis permit records from 2017 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 35 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 8 |
| 2018 | 5 |
| 2019 | 4 |
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 | 1 |
Busiest year on record: 2017, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1815 JEFFERSON ST NE | 2026-05-27 |
| 245 CEDAR AVE S | 2025-07-24 |
| 3530 18TH AVE S | 2025-05-08 |
| 3200 OAKLAND AVE | 2024-12-09 |
| 1115 28TH ST W | 2024-11-18 |
| 701 25TH AVE S | 2024-05-13 |
| 2609 26TH AVE S | 2023-10-05 |
| 3100 MARSHALL ST NE | 2022-09-22 |
| 528 UNIVERSITY AVE SE | 2022-07-08 |
| 4351 FRANCE AVE S | 2021-05-24 |
| 417 2ND AVE N | 2021-05-24 |
| 3450 IRVING AVE S | 2021-04-15 |
| 727 18TH ST E | 2021-03-29 |
| 2522 CENTRAL AVE NE | 2021-03-17 |
33 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
35 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1181108 | 2026-05-27 | General construction | 1815 JEFFERSON ST NE | install new roof membrane and ballast. | |
| BLDG1130923 | 2025-07-24 | General construction | 245 CEDAR AVE S | RE-ROOF ROOF 2020 MSBC | |
| BLDG1116023 | 2025-05-08 | General construction | 3530 18TH AVE S | remove roof membrane, add insulation to R30 and install new fully adhered EPDM. | |
| BLDG1087674 | 2024-12-09 | General construction | 3200 OAKLAND AVE | RE-ROOF FLAT ROOF 2020 MSBC | |
| BLDG1089459 | 2024-11-18 | General construction | 1115 28TH ST W | REROOF. (JJL) | |
| BLDG1059432 | 2024-05-13 | General construction | 701 25TH AVE S | RE-ROOF FLAT ROOF 2020 MSBC | |
| BLDG1017353 | 2023-10-05 | General construction | 2609 26TH AVE S | Flat Roof - PVC General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire clas | |
| BLDG948318 | 2022-09-22 | General construction | 3100 MARSHALL ST NE | tearoff and reroof Unit 7 building. fully adhered EPDM. | |
| BLDG950011 | 2022-07-08 | General construction | 528 UNIVERSITY AVE SE | REPLACE ROOFING WITH 60 ML EPDM AND 5" ISO (MAA) | |
| BLDG885736 | 2021-05-24 | General construction | 4351 FRANCE AVE S | RE-ROOF // INSTALL FULLY-ADHERED AND BALLASTED EPDM PER SOW ATTACHED IN ELMS "SOW France 44 Permitting.pdf" ----- certificate of occupancy required: YES special inspections requ | |
| BLDG884403 | 2021-05-24 | General construction | 417 2ND AVE N | General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Sect | |
| BLDG879521 | 2021-04-15 | General construction | 3450 IRVING AVE S | FLAT ROOF REPLACEMENT. EPDM. REMOVE EXISTING BALLAST. NEW DECKING. SEVERAL DIFFERENT AREAS ON CHURCH. SEE SCOPE ATTACHED. NO STRUCTURAL WORK. (JJL) | |
| BLDG877300 | 2021-03-29 | General construction | 727 18TH ST E | 60-mil fully adhered EPDM over new R-30 polyiso | |
| BLDG876425 | 2021-03-17 | General construction | 2522 CENTRAL AVE NE | INSTALL 60 MIL EPDM ROOF MEMBRANE FULLY ADHERED TO INSULATION, R30 (MAA) | |
| BLDG859495 | 2020-12-17 | General construction | 1849 38TH ST E | RE-ROOF. 16 SQUARES. FULL TEAR OFF DOWN TO WOOD DECKING. ADDING R-31.3 TAPERED INSULATION, 60 MIL FULLY ADHERED MEMBRANCE. NEW SHEET METAL. (JJL) | |
| BLDG848117 | 2020-09-08 | General construction | 3715 CHICAGO AVE | REMOVE AND REPLACE ROOFING WITH 60 MIL FULLY ADHERED ROOF SYSTEM AND R30 (MAA) | |
| BLDG824759 | 2020-04-23 | General construction | 209 19TH ST E | tearoff and reroof. | |
| BLDG818686 | 2020-02-14 | General construction | 3310 2ND ST N | TEAR OFF AND REROOF EXISTING EPDM FLAT ROOF OF A COMMERCIAL BUILDING. AAJ. ***NOTE: NO PLAN SUBMITTED FOR REVIEW. IF REQUIRED BY FIELD INSPECTOR, PLANS MUST BE SUBMITTED FOR REVIE | |
| BLDG798197 | 2019-10-23 | General construction | 620 HENNEPIN AVE E | Tear off all materials to existing insulation . Install new tapered isocyanurate roof insulation (New R-30) New 60 mil adhered EPDM membrane roofing complete with all flashing and | |
| BLDG793415 | 2019-09-20 | General construction | 110 BANK ST | (DMH#2) TEAR OFF EXISTING BALLASTED ROOF TO DECK AND INSTALL NEW TAPERED ISOCYANURATE INSULATION AND FULLY ADHERED EPDM. >>IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT T | |
| BLDG758359 | 2019-05-14 | General construction | 3036 UNIVERSITY AVE SE | TEAROFF REPLACE LOW PITCH ROOFING AND INSULATION TO DECK WITH NEW R-30 ISO AND FULLY ADHERED EPDM 60 MIL (JAG)*** General requirements for low pitch roof replacements. The roof c | |
| BLDG755350 | 2019-03-07 | General construction | 1922 HENNEPIN AVE | Tear off all materials to deck. Install 2 layers of 2.6 isocyanurate roof insulation New 60 mil and ballast complete with new flashing and trim. | |
| BLDG735393 | 2018-10-23 | General construction | 1801 3RD AVE S | REMOVE EXISTING BALLASTED ROOF AND MEMBRANE AND MECHANICALLY FASTEN NEW LAYER 1/2" FIBERBOARD AND NEW ADHERED EPDM MEMRANE (DMH) OVER ENTIRE ROOF AREA OF 3 STORY BLDG. NO PLAN. | |
| BLDG726457 | 2018-09-05 | General construction | 1619 PORTLAND AVE | INSTALL 60 MIL EPDM, 1/4" PER FOOT INSULATION R30. (MAA) | |
| BLDG705559 | 2018-06-14 | General construction | 400 LAKE ST E | Roofing Replacement - 5.2" Polyiso Insulation - Minimum R-Value 30 certificate of occupancy required: no special inspections required: no | |
| BLDG702579 | 2018-04-11 | General construction | 2740 PLEASANT AVE | REMOVE AND REPLACE EXISTING BALLASTED EPDM ROOF WITH SAME OVER ENTIRE ROOF AREA APPROX 96'X 50'. NO PLAN. (DMH) IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT TO CAUSE THE | |
| BLDG702580 | 2018-04-11 | General construction | 600 FRANKLIN AVE W | REMOVE EXISTING B.U.R TO EXISTING INSULATION. INSTALL NEW ADHERED EPDM MEMBRANE AND COUNTER FLASHINGS. NO PLAN. (DMH) IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT TO CAU | |
| BLDG686367 | 2017-11-29 | General construction | 3118 STEVENS AVE | REMOVE AND REPLACE FLAT ROOF. 2 LAYERS OF 2.6" ISO, 60 MOL FULLY ADHERED ROOF AND EPDM FLASHING (MAA ) | |
| BLDG678401 | 2017-10-27 | General construction | 110 BANK ST | LOW PITCH TEAR-OFF REROOF (JAG) BALASTED/ADHERED ROOF SYSTEM. INSTALL 60 MIL EPDM FIRESTONE ROOFING SYSTEM INCLUDING FLASHING EDGES, PENETRATION AND CURBS. DRAINAGE FABRIC OVER M | |
| BLDG673810 | 2017-09-07 | General construction | 3100 MARSHALL ST NE | Remove existing built up roof down to metal deck. Install new lumber at perimeter to accommodate for new roof system. Install 2 layers 2.6" isocyanurate roof insulation mechanica | |
| BLDG661133 | 2017-06-26 | General construction | 5244 LYNDALE AVE S | FLAT ROOF-REMOVE EXISTING SYSTEM DOWN TO ROOF DECK. INSTALL 4 PLIES OF FIBERGLASS FELT IN SOLID MOPPING OF TYPE III ASPHALT. INSTALL TWO PLIES OF FIBERGLASS BACKER FELT FLASHING AN | |
| BLDG658531 | 2017-06-08 | General construction | 1507 LOWRY AVE NE | REPLACE EXISTING ROOF MEMBRANE WITH 60 MIL EPDM. ASSUME THAT EXISTING ROOF INSULATION IS BELOW THE DECK - OTHERWISE RIGID INSULATION REQUIRED ABOVE DECK TO MEET CODE. (WSS) | |
| BLDG648749 | 2017-05-02 | General construction | 3008 BRYANT AVE S | tearoff roof membrane and replace with new. sck | |
| BLDG644298 | 2017-03-17 | General construction | 1100 5TH ST S | REROOF CONCRETE ROOF DECK, INSTALL LUMBER - at the perimeter , tapered iso roof insulation over concrete deck and additional insulation at roof scuppers to achieve drainage . 90 mi | |
| BLDG634914 | 2017-02-10 | General construction | 322 3RD ST S | RE-ROOF FLAT ROOF TO REAIR LEAKS General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Secti |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →