COMPANY RECORD · DETROIT, MI
Hopper Electric LLC — permit history in Detroit, MI
Hopper Electric LLC appears on 117 Detroit permit records from 2019 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 117 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 11 |
| 2022 | 13 |
| 2023 | 19 |
| 2024 | 6 |
| 2025 | 10 |
| 2026 | 53 |
Busiest year on record: 2026, with 53 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1337 Nicolet Pl | 2026-07-17 |
| 1301 Nicolet Pl | 2026-07-06 |
| 1371 Nicolet Pl | 2026-06-29 |
| 1335 Nicolet Pl | 2026-06-29 |
| 1363 Nicolet Pl | 2026-06-29 |
| 1369 Nicolet Pl | 2026-06-29 |
| 1353 Nicolet Pl | 2026-06-29 |
| 1365 Nicolet Pl | 2026-06-29 |
| 1355 Nicolet Pl | 2026-06-29 |
| 1357 Nicolet Pl | 2026-06-29 |
| 1361 Nicolet Pl | 2026-06-29 |
| 1307 Nicolet Pl | 2026-06-26 |
| 1345 Nicolet Pl | 2026-06-26 |
| 1417 Nicolet Pl | 2026-06-26 |
86 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
117 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| ELE2026-02807 | 2026-07-17 | Electrical | 1337 Nicolet Pl | Remove existing 100Amp panel and install new 100Amp electrical panel. | |
| ELE2025-04862 | 2026-07-06 | Electrical | 1301 Nicolet Pl | Replace the existing sub-panel with a new 100Amp sub-panel. | |
| ELE2026-02526 | 2026-06-29 | Electrical | 1371 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02533 | 2026-06-29 | Electrical | 1335 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-02523 | 2026-06-29 | Electrical | 1363 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02525 | 2026-06-29 | Electrical | 1369 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02518 | 2026-06-29 | Electrical | 1353 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02524 | 2026-06-29 | Electrical | 1365 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02519 | 2026-06-29 | Electrical | 1355 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02520 | 2026-06-29 | Electrical | 1357 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02521 | 2026-06-29 | Electrical | 1361 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. Installed 30Amp 4-wire GFCI protected dryer circuit. | |
| ELE2026-02507 | 2026-06-26 | Electrical | 1307 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02498 | 2026-06-26 | Electrical | 1345 Nicolet Pl | Removed existing 100Amp sub-panel and replaced with new 100Amp sub-panel. Installed new 30Amp 4-wire GFCI protected electric dryer circuit. | |
| ELE2026-02501 | 2026-06-26 | Electrical | 1417 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02503 | 2026-06-26 | Electrical | 1413 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-02509 | 2026-06-26 | Electrical | 1315 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02499 | 2026-06-26 | Electrical | 1423 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02511 | 2026-06-26 | Electrical | 1319 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02505 | 2026-06-26 | Electrical | 1301 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-02494 | 2026-06-26 | Electrical | 1349 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02506 | 2026-06-26 | Electrical | 1305 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02502 | 2026-06-26 | Electrical | 1413 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02500 | 2026-06-26 | Electrical | 1419 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02510 | 2026-06-26 | Electrical | 1317 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02508 | 2026-06-26 | Electrical | 1311 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02470 | 2026-06-25 | Electrical | 1327 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02472 | 2026-06-25 | Electrical | 1335 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02474 | 2026-06-25 | Electrical | 1339 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02471 | 2026-06-25 | Electrical | 1333 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02476 | 2026-06-25 | Electrical | 1347 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-02056 | 2026-06-01 | Electrical | 1342 Joliet Pl | Replaced existing 100Amp Pushmatic sub-panel with new 100Amp sub-panel. Underground conduit (feeders) were cut that goes to the sub-panel. Repairs needed - installing (3) new condu | |
| ELE2026-01435 | 2026-04-17 | Electrical | 1355 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-01302 | 2026-04-07 | Electrical | 1329 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-01301 | 2026-04-07 | Electrical | 1325 Nicolet Pl | Removed existing 100Amp sub-panel and installed new 100Amp sub-panel. | |
| ELE2026-01298 | 2026-04-07 | Electrical | 1323 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-01299 | 2026-04-07 | Electrical | 1323 Nicolet Pl | Removed existing 100Amp sub-panel and replaced with new 100Amp sub-panel. Installed new 30Amp 4-wire GFCI protected electric dryer circuit. | |
| ELE2026-01152 | 2026-03-30 | Electrical | 2021 Hyde Park Rd | Install one new 20Amp 120V circuit in the master bathroom and one new 20Amp 120V circuit for garage door opener. | |
| ELE2025-05469 | 2026-03-27 | Electrical | 1407 Nicolet Pl | Installing temporary wiring from the GEO sub-panel to the unit sub-panel. Both sub-panels are located in each unit. Inspector Hart is aware of this project. | |
| ELE2025-05468 | 2026-03-27 | Electrical | 1405 Nicolet Pl | Installing temporary wiring from the GEO sub-panel to the unit sub-panel. Both sub-panels are located in each unit. Inspector Hart is aware of this project. | |
| ELE2025-05467 | 2026-03-27 | Electrical | 1403 Nicolet Pl | Installing temporary wiring from the GEO sub-panel to the unit sub-panel. Both sub-panels are located in each unit. Inspector Hart is aware of this project. | |
| ELE2025-05470 | 2026-03-27 | Electrical | 1409 Nicolet Pl | Installing temporary wiring from the GEO sub-panel to the unit sub-panel. Both sub-panels are located in each unit. Inspector Hart is aware of this project. | |
| ELE2025-05466 | 2026-03-27 | Electrical | 1401 Nicolet Pl | Installing temporary wiring from the GEO sub-panel to the unit sub-panel. Both sub-panels are located in each unit. Inspector Hart is aware of this project. | |
| ELE2026-01101 | 2026-03-25 | Electrical | 1413 Nicolet Pl | New 100Amp panel for geothermal system (B4 tunnel). Installed new 100Amp 120/240V single phase service equipment in B4 tunnel. | |
| ELE2026-00823 | 2026-03-06 | Electrical | 1304 Nicolet Pl | Installed three new circuits in second floor bathroom. | |
| ELE2026-00724 | 2026-02-27 | Electrical | 1335 Nicolet Pl | New 100Amp panel for geothermal system (B2 tunnel). Installed new 100Amp 120/240V single phase service equipment in B2 tunnel. | |
| ELE2026-00528 | 2026-02-11 | Electrical | 1401 Nicolet Pl | Removed original meter bank system that was connected to an existing 400Amp main. Installed new meter banks to the existing 400Amp main. Installed new 100Amp house panel. Extended | |
| ELE2026-00526 | 2026-02-11 | Electrical | 1407 Nicolet Pl | Installed new 30Amp 4-wire GFCI protected electric dryer circuit. | |
| ELE2026-00035 | 2026-01-07 | Electrical | 1407 Nicolet Pl | Replaced existing 100Amp sub-panel with new 100Amp sub-panel. | |
| ELE2026-00030 | 2026-01-07 | Electrical | 1401 Nicolet Pl | Replaced existing 100Amp sub-panel with new 100Amp sub-panel. | |
| ELE2026-00037 | 2026-01-07 | Electrical | 1411 Nicolet Pl | Replaced existing 100Amp sub-panel with new 100Amp sub-panel. |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Detroit permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →