COMPANY RECORD · DETROIT, MI

Atlas Home Improvement — permit history in Detroit, MI

Atlas Home Improvement appears on 166 Detroit permit records from 2021 through 2026, most often plumbing (99.4% of the record).

Permit categories

CategoryPermitsShare
Plumbing16599.4%
Electrical10.6%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20217
202237
202342
202433
202536
202611

Busiest year on record: 2023, with 42 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
8200 E Outer Dr2026-08-27
17595 Sunderland Rd2026-08-24
1251 S Beatrice St2026-05-19
19340 Marlowe St2026-04-27
18240 Santa Barbara Dr2026-04-13
19351 Ryan Rd2026-03-03
66 Winder St, Apt 2192026-03-02
18700 Prairie St2026-02-06
5351 Vancouver St2026-01-26
19151 Waltham St2026-01-09
17009 Chandler Park Dr2026-01-09
15255 Collingham Dr2025-11-25
20521 Gilchrist St2025-11-10
19971 Conley St2025-11-10

152 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

166 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
PLM2026-038552026-08-27Plumbing8200 E Outer DrWe will remove the old bathtub, and replace it with a new shower, the drain will NOT move, the drain will remain in the same position.
PLM2026-037372026-08-24Plumbing17595 Sunderland RdWe will remove the old bathtub, and replace it with a new shower, the drain will NOT move, the drain will remain in the same position.
PLM2026-016802026-05-19Plumbing1251 S Beatrice StWe will be removing the old bathtub, and replacing it with a new shower, the drain will remain in the same position.
PLM2026-013632026-04-27Plumbing19340 Marlowe StWe will be removing the old bathtub and replacing it with a new bathtub. The drain will NOT move; the drain will remain in the same position.
PLM2026-011782026-04-13Plumbing18240 Santa Barbara DrWe will be installing a new shower, where there used to be a shower. The drain will not move; the drain will remain in the same position.
PLM2026-006952026-03-03Plumbing19351 Ryan RdWe will remove the old bathtub and replace it with a new shower; the drain will NOT move; the drain will remain in the same position.
PLM2026-006742026-03-02Plumbing66 Winder St, Apt 219We will remove the old bathtub and replace it with a new bathtub, the drain will remain in the same position.
PLM2026-003622026-02-06Plumbing18700 Prairie StRemoving the old bathtub and replacing it with a new shower, the drain will not move, the drain will remain in the same position.
PLM2026-002122026-01-26Plumbing5351 Vancouver StWe will be removing the old bathtub and replacing it with a new shower, the drain will NOT move, the drain will remain in the same position.
PLM2026-000652026-01-09Plumbing19151 Waltham StWe will be removing the old shower and replacing it with a new shower, the drain will remain in the same position.
PLM2026-000662026-01-09Plumbing17009 Chandler Park DrWe will be removing the old bathtub and replacing it with a new bathtub, the drain will not move the drain will remain in the same position.
PLM2025-102282025-11-25Plumbing15255 Collingham DrRemoving the old bathtub and replacing it with a new shower. The drain will remain in the same position.
PLM2025-100152025-11-10Plumbing20521 Gilchrist StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-100162025-11-10Plumbing19971 Conley StRemoving the old bathtub and replacing it with a new bathtub, the drain will remain in the same position.
PLM2025-097942025-10-28Plumbing12031 Buffalo StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-096482025-10-16Plumbing20071 Keystone StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-096462025-10-16Plumbing18277 Lesure StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-096502025-10-16Plumbing5054 Garland StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-093612025-10-03Plumbing15435 Eastwood StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-091082025-09-18Plumbing23041 Leewin StReference Permit: PLM2025-08770 Adding water distribution and an underground inspection.
PLM2025-089242025-09-09Plumbing18222 Strathmoor StThis is to add additional fees, per the inspector, to the current plumbing permit PLM2025-08774.
PLM2025-087742025-08-27Plumbing18222 Strathmoor StSame for same, shower replacement, we will not be moving the drain, it will remain in the same position. We will not be touching or moving any pipes.
PLM2025-087712025-08-27Plumbing19649 Canterbury RdTub to shower conversion, the drain will remain in the same position. We will NOT be moving or touching any pipes in the home.
PLM2025-087702025-08-27Plumbing23041 Leewin StTub-to-shower conversion, the drain will remain in the same position. We do not need a water distribution permit, because we are not touching or moving any pipes in the home.
PLM2025-085322025-08-15Plumbing5743 Nottingham RdAdding a water distribution fee to the permit per inspector Daniel X Reference: PLM2025-06338
PLM2025-085032025-08-12Plumbing18086 Anglin StTub to shower - the drain will remain in the same position.
PLM2025-083382025-08-06Plumbing18731 Moross RdRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-083082025-08-05Plumbing10321 W Outer DrRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-082432025-08-01Plumbing19434 Gloucester DrRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-081842025-07-29Plumbing9209 Rutherford StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-081582025-07-28Plumbing20150 Carol StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-080822025-07-24Plumbing16550 Rutherford StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-077192025-07-09Plumbing16550 Rutherford StRemoving the old shower and replacing it with a new shower, the drain will remain in the same position.
PLM2025-068542025-06-10Plumbing12055 American StRemoving the old bathtub, and replacing it with a new shower, the drain will remain in the same location.
PLM2025-063382025-05-16Plumbing5743 Nottingham RdRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-063112025-05-15Plumbing16840 Braile StRemoving the old bathtub and replacing it with a new one, the drain will remain in the same position.
PLM2025-062562025-05-14Plumbing19769 Plainview AveTub to shower conversion the drain will remain in the same position
PLM2025-062872025-05-14Plumbing16579 Bentler StTub to Shower Conversion - The drain will remain in the same position.
PLM2025-062862025-05-14Plumbing17162 Monica StTub to shower conversion, the drain will remain in the same position.
PLM2025-062632025-05-14Plumbing20034 Asbury ParkTub to Shower Conversion - The drain will remain in the same position.
PLM2025-046582025-04-09Plumbing17607 Huntington RdRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-043322025-03-28Plumbing20176 Ardmore StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-043312025-03-28Plumbing20522 Westbrook StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same location.
PLM2025-043292025-03-28Plumbing20551 Waltham StRemoving the old bathtub and replacing it with a new bathtub, the drain will remain in the same position.
PLM2025-043302025-03-28Plumbing20531 Picadilly RdRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2025-043252025-03-28Plumbing18019 Greenfield RdTub to shower conversion, the drain will remain in the same position.
ELE2025-008212025-02-27Electrical771 Aberton AveRemoving the old tile shower pan and replacing it with a new walk-in-tub. The drain will remain in the same position.
PLM2024-119732024-12-09Plumbing18428 Cherrylawn StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.
PLM2024-111862024-11-07Plumbing2509 Helen StRemoving the old bathtub and replacing it with a new bathtub, the drain will remain in the same position.
PLM2024-111892024-11-07Plumbing18500 Hubbell StRemoving the old bathtub and replacing it with a new shower, the drain will remain in the same position.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Detroit permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →