COMPANY RECORD · NEW ORLEANS, LA
Donahuefavret Contractors, Inc. — permit history in New Orleans, LA
Donahuefavret Contractors, Inc. appears on 27 New Orleans permit records from 2015 through 2026, most often general construction (85.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 23 | 85.2% |
| Mechanical / HVAC | 4 | 14.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 1 |
| 2016 | 1 |
| 2019 | 4 |
| 2020 | 4 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 6 |
| 2024 | 6 |
| 2025 | 1 |
| 2026 | 1 |
Busiest year on record: 2023, with 6 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 365 Canal St Ste 3100 | 2026-04-27 |
| 1430 Tulane Ave | 2025-06-03 |
| 1515 Arts St | 2024-12-20 |
| 1430 Tulane Ave, 7th Floor | 2024-06-24 |
| 2832 Burdette St | 2024-02-01 |
| 833 Poydras St, Public areas, guestrooms 1st & 2nd floors | 2023-11-16 |
| 5600 General De Gaulle Dr | 2023-11-16 |
| 101 N Roadway St | 2023-11-10 |
| 1415 Tulane Ave, Reily Pavilion 4th Floor | 2023-10-17 |
| 2801 General De Gaulle Dr | 2023-08-02 |
| 1300 Oretha Castle Haley Blvd Ste B | 2023-03-24 |
| 5100 Tchoupitoulas St | 2022-10-06 |
| 705 Common St | 2021-07-12 |
| 135 St Charles Ave | 2021-03-25 |
22 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,000 to $24,654,876, median $680,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
27 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 26-08257-RNVN | 2026-04-27 | General construction | 365 Canal St Ste 3100 | Interior office renovation to include the construction of partitions, millwork, interior glazing & doors, plumbing, electrical, ceilings, lighting & finishes. Interior demo under | $7,341,076 |
| 24-05935-RNVN | 2025-06-03 | General construction | 1430 Tulane Ave | INTERIOR RENOVATIONS TO PART OF FLOOR 5 OF THE HUTCHINSON BUILDING LOCATED AT 1430 TULANE AVENUE IN NEW ORLEANS, LA FOR THE USE OF LAB SPACES FOR TULANE UNIVERSITY. NEW AND REWORK | $3,850,300 |
| 24-38181-HVAC | 2024-12-20 | Mechanical / HVAC | 1515 Arts St | (12) DX split systems per AHU Schedule on sheet M601. ( 4TH floor Apts 401-412) One (1) ductless mini-split system. Furnish & install radiation dampers. Fabricated & flex duct air | $68,000 |
| 24-38179-HVAC | 2024-12-20 | Mechanical / HVAC | 1515 Arts St | (12) DX split systems per AHU Schedule on sheet M601. (3RD floor Apts 301-312) One (1) ductless mini-split system. Furnish & install radiation dampers. Fabricated & flex duct air | $68,000 |
| 24-38178-HVAC | 2024-12-20 | Mechanical / HVAC | 1515 Arts St | (12) DX split systems per AHU Schedule on sheet M601. ( 2ND floor Apts 201-212) One (1) ductless mini-split system. Furnish & install radiation dampers. Fabricated & flex duct air | $680,000 |
| 24-03422-RNVN | 2024-07-18 | General construction | 1430 Tulane Ave | INTERIOR RENOVATIONS TO FLOOR 7 OF THE HUTCHINSON BUILDING LOCATED AT 1430 TULANE AVENUE IN NEW ORLEANS, LA FOR THE USE OF LAB SPACES, EQUIPMENT ROOMS, OFFICES, MEETING ROOMS, & WR | $24,654,876 |
| 24-17552-DEMI | 2024-06-24 | General construction | 1430 Tulane Ave, 7th Floor | Interior Demolition of 7th floor, no structural demolish. No use & occupancy. Renovation requires a separate permit. | $477,499 |
| 23-32670-RNVN | 2024-02-01 | General construction | 2832 Burdette St | Overlay the existing roof with new TPO roofing. | $937,423 |
| 23-31387-DEMI | 2023-11-16 | General construction | 833 Poydras St, Public areas, guestrooms 1st & 2nd floors | Interior demolition - public area, restrooms, meeting spaces, fitness center and guestrooms on the 2nd floor (NO USE AND OCCUPANCY TO BE GIVEN) | $115,500 |
| 23-30775-RNVN | 2023-11-16 | General construction | 5600 General De Gaulle Dr | DonahueFavret Contractors, in partnership with Premier South Roofing, will be removing the existing roof and flashings to deck. Any compromised decking will be replaced. We | $777,929 |
| 23-19937-NEWC | 2023-11-10 | General construction | 101 N Roadway St | This project consists of a two-story, 5,519 SF non-profit boathouse facility that's purpose is to engage with the public and become a learning center for people of all ages, demogr | $3,410,048 |
| 23-26526-DEMI | 2023-10-17 | General construction | 1415 Tulane Ave, Reily Pavilion 4th Floor | Interior Demolition Permit to include MEP demolition, No structural demolition to take place. No use or occupancy. Renovation requires separate permit. | $182,000 |
| 23-07477-NEWC | 2023-08-02 | General construction | 2801 General De Gaulle Dr | The project consists of a 20,000 square foot single story health clinic. The program consists of a health clinic, urgent care clinic, diagnostic/imaging (future) and retail vision | $7,663,588 |
| 22-23395-RNVS | 2023-03-24 | General construction | 1300 Oretha Castle Haley Blvd Ste B | Interior build-out of 8,900 sq. ft. clinic on ground floor of mixed use development. All work to be done as per plans. *Address corrected from Ste A to Ste B | $2,419,376 |
| 22-05295-NEWC | 2022-10-06 | General construction | 5100 Tchoupitoulas St | New construction of 4 story office building, with bank drive thru. Complete build-outs of 1st and 4th floors, 2nd and 3rd floor public/egress areas. 2nd and 3rd floor lease space b | $7,782,000 |
| 21-04525-RNVN | 2021-07-12 | General construction | 705 Common St | Level one and exterior renovation to be done as per plans. | $1,917,761 |
| 21-04046-DEMI | 2021-03-25 | General construction | 135 St Charles Ave | Interior demolition of elements in guest rooms, floors 2-10. No use & Occupancy. Plans to follow. | $279,451 |
| 20-48960-HVAC | 2020-12-10 | Mechanical / HVAC | 1430 Tulane Ave. | Provide and Install 1 mini split unit. 5th Floor | $485,000 |
| 20-43609-DEMI | 2020-12-04 | General construction | 135 St Charles Ave | Interior demolition of ceilings at the hotel for exploratory purposes | $40,344 |
| 19-37873-RNVN | 2020-09-25 | General construction | 859 Convention Center Blvd | Interior, non-structural renovation to finishes and fixtures of public spaces including ballrooms, pre-function spaces, and meeting rooms on the first and second floors. Interior, | $2,020,329 |
| 19-36721-RNVS | 2020-09-02 | General construction | 1601 Leonidas St | Renovation and 8695 sq ft addition to an existing 3 story and 32168 sq ft high school as per plans. Scope includes interior renovation and reroofing of the existing gymnasium. O | $13,313,000 |
| 19-34989-DEMI | 2019-11-20 | General construction | 7001 Freret St | Partial interior basement demolition | $419,500 |
| 19-34867-DEMI | 2019-11-08 | General construction | 859 Convention Center Blvd, Lobby Demolition | Interior demolition of hotel lobby. Lobby Renovation permit was previously submitted. | $52,754 |
| 19-27544-RNVN | 2019-09-19 | General construction | 859 Convention Center Blvd | Removing 6" CMU wall, shoring and replacing wall with the same material in the exact same location. | $40,000 |
| 18-36323-DEMI | 2019-02-12 | General construction | 229 Royal St | Interior demolition to begin removing interior non-structural walls, open walls, conduct exploratory demolition while waiting for full building permit. | $120,000 |
| 16-04447-DEMI | 2016-02-12 | General construction | 733 Canal St | Interior demolition to vacant commercial space. Plans were submitted under 15-38808-RNVN for white box renovation. | $10,000 |
| 15-18467-CUSE | 2015-07-27 | General construction | 1523 St Charles Ave | Convert restaurant into an outpatient clinic as per plans - interior renovation of an existing building, work to include demolition, new interior partitions, finishes, modification | $1,345,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
