COMPANY RECORD · CHICAGO, IL
Rv Builders, Corp. — permit history in Chicago, IL
Rv Builders, Corp. appears on 106 Chicago permit records from 2012 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 106 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2012 | 3 |
| 2013 | 9 |
| 2014 | 2 |
| 2015 | 2 |
| 2016 | 5 |
| 2017 | 1 |
| 2018 | 6 |
| 2019 | 7 |
| 2020 | 6 |
| 2021 | 10 |
| 2022 | 14 |
| 2023 | 19 |
| 2024 | 8 |
| 2025 | 9 |
| 2026 | 5 |
Busiest year on record: 2023, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| D.A.M. Plumbing Inc. | 9 | 2026-08-04 |
| Superior One Electric, Inc. | 9 | 2025-11-26 |
| Bonus Electric | 8 | 2023-03-02 |
| R. Carrozza Plumbing Co | 8 | 2023-08-21 |
| Terry Plumbing A Matrix Holdin | 7 | 2024-02-27 |
| Edwards Engineering Inc | 7 | 2025-12-23 |
| Air Rite Htg/Cooling | 6 | 2013-11-06 |
| Klass Electric Company, Inc. | 6 | 2013-11-06 |
| Dw Mechanical Group,Inc. | 5 | 2026-03-25 |
| Birk Plumbing, Inc. | 5 | 2024-07-15 |
| Heatmasters Inc | 5 | 2026-03-25 |
| Gms Plumbing, Inc. | 5 | 2013-10-29 |
133 companies are named alongside Rv Builders, Corp. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4006 N SHERIDAN RD | 2026-08-04 |
| 111 S MICHIGAN AVE | 2026-05-20 |
| 566 W VAN BUREN ST | 2026-03-25 |
| 2355 W 63RD ST | 2026-02-13 |
| 8 N MORGAN ST | 2025-12-23 |
| 2305 S STATE ST | 2025-11-26 |
| 2909 W IRVING PARK RD | 2025-05-06 |
| 835 W ADDISON ST | 2025-05-02 |
| 1071 W FRY ST | 2025-03-28 |
| 750 N AVERS AVE | 2025-01-28 |
| 1144 W FULTON MARKET | 2025-01-28 |
| 7905 S EXCHANGE AVE | 2024-11-27 |
| 212 S FRANCISCO AVE | 2024-08-16 |
| 1237 N CALIFORNIA AVE | 2024-07-22 |
89 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $78,500,000, median $2,200,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
106 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101078214 | 2026-08-04 | General construction | 4006 N SHERIDAN RD | DDS 2019 CBC: FULL BUILDING PERMIT FOR NEW CONSTRUCTION OF A 7 STORY 91 DU MIXED USE BUILDING TO INCLUDE 6 FLOORS OF RESIDENTIAL AND 38 PARKING SPACES AT GRADE INDOOR (OCCUPANCY: A | $23,000,000 |
| 101081168 | 2026-05-20 | General construction | 111 S MICHIGAN AVE | DDS 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING RICE BUILDING AT THE ART INSTITUTE OF CHICAGO FOR THE NEW GRAINGER CENTER FOR CONSERVATION & SCIENCE BUILDOUT AS PER PLANS (OCCUPANC | $21,000,000 |
| 101073356 | 2026-03-25 | General construction | 566 W VAN BUREN ST | DDS / 2019 CBC: NEW CONSTRUCTION OF A 12-STORY RESIDENTIAL BUILDING (199 UNITS) W/ NO BASEMENT TO INCLUDE GROUND PARKING (42 AUTO PARKING SPACES + 199 BIKE PARKING SPACES) AND ASS | $44,000,000 |
| 100979631 | 2026-03-23 | General construction | 566 W VAN BUREN ST | (DIRECT DEVELOPER SERVICES / 2019 CBC) FOUNDATION / SUPERSTRUCTURE PERMIT FOR THE NEW CONSTRUCTION OF A 14-STORY RESIDENTIAL BUILDING (199 UNITS) W/ NO BASEMENT TO INCLUDE PARKING | $12,000,000 |
| B200458492 | 2026-02-13 | General construction | 2355 W 63RD ST | FOR PERMIT 101067018: REPLACEMENT PLUMBING CONTRACTOR. REPLACEMENT OTHER CONTRACTOR. REPLACEMENT MASON CONTRACTOR. REPLACEMENT ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED U | |
| 101073309 | 2025-12-23 | General construction | 8 N MORGAN ST | DDS 2019 CBC: FULL BUILDING PERMIT FOR A THREE-STORY BATH HOUSE (OCCUPANCY GROUPS: B, A-2, A-3, S-1, S-2; TYPE IIA CONSTRUCTION). CONSULTANT REVIEWER: V3 COMPANIES OF IL | $16,000,000 |
| 101072150 | 2025-11-26 | General construction | 2305 S STATE ST | DDS / 2019 CBC: FULL BUILDING PERMIT FOR THE NEW CONSTRUCTION OF A 13-STORY RESIDENTIAL BUILDING (80 TOTAL DWELLING UNITS; 60 DWELLING UNITS + 20 EFFICIENCY UNITS) TO INCLUDE GROU | $10,000,000 |
| 101059457 | 2025-08-13 | General construction | 8 N MORGAN ST | DDS 2019 CBC: FOUNDATION ONLY PERMIT FOR A THREE-STORY BATH HOUSE (OCCUPANCY GROUPS: B, A-2, A-3, S1, S-2; TYPE IIA CONSTRUCTION). V3 COMPANIES OF IL. CONSULTANT REVIEWER: V3 COMP | $600,000 |
| 101061450 | 2025-05-06 | General construction | 2909 W IRVING PARK RD | DDS 2019 CBC: FULL BUILDING PERMIT FOR 7-STORY, 45 DWELLING UNIT MIXED USE BUILDING WITH 16 PARTIALLY COVERED AT-GRADE PARKING SPACES AND A ROOFTOP GREEN ROOF AND RESIDENT TERRACE. | $25,944,371 |
| 101063878 | 2025-05-02 | General construction | 835 W ADDISON ST | SPR 2019 CBC: REVISION TO PERMIT 100978743. REVISION TO ADD A NATURAL GAS EMERGENCY GENERATOR. (OCCUPANCIES: R-2, A-3 AND S-2; CONSTRUCTION TYPE: IIA) | $185,000 |
| 101064687 | 2025-03-28 | General construction | 1071 W FRY ST | DDS 2019 CBRC: INTERIOR & EXTERIOR ALTERATIONS TO EXISTING 2 STORY MASONRY OFFICE BUILDING WITH BASEMENT, SECOND FLOOR AND 1-STORY WAREHOUSE. DEMO OF EXISTING WAREHOUSE AND PORTION | $925,000 |
| 101061943 | 2025-01-28 | General construction | 750 N AVERS AVE | DDS 2019 CBC: FULL BUILDING PERMIT FOR FOUR STORY SIXTY UNIT APARTMENT BUILDING WITH GROUND FLOOR RETAIL. (OCC. R-2,TYPE IIA CONST.) CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING | $30,000,000 |
| 101058858 | 2025-01-28 | General construction | 1144 W FULTON MARKET | SELF-CERT 2019 CBRC: INTERIOR AND EXTERIOR LANDLORD IMPROVEMENTS TO AN EXISTING 3-STORY BUILDING W/ BASEMENT AS PER PLANS. WORK TO INCLUDE DEMO, MECHANICAL, ELECTRICAL, PLUMBING, S | $289,500 |
| 101054040 | 2025-01-24 | General construction | 8 N MORGAN ST | DDS 2019 CBC: PILES ONLY PERMIT FOR A THREE-STORY BATH HOUSE (OCCUPANCY GROUPS: B, A-2, A-3, S1, S-2; TYPE IIA CONSTRUCTION). V3 COMPANIES OF IL | $600,000 |
| 101054966 | 2024-11-27 | General construction | 7905 S EXCHANGE AVE | DDS 2019 CBC: FULL BUILDING PERMIT FOR 6 STORY, 43 DWELLING UNIT SPRINKLERED MIXED-OCCUPANCY BUILDING WITH 1ST FLOOR RETAIL AND 0 OFF-SITE PARKING SPACES. (OCCUPANCY GROUP R-2, M; | $25,000,000 |
| 101012784 | 2024-08-16 | General construction | 212 S FRANCISCO AVE | SPR 2019 CBRC: BUILDING SYSTEM REPLACEMENT AND UPGRADES OF AN EXISTING 3-STORY EDUCATION FACILITY. NO ADDITIONAL OCCUPANTS OR BUILDING SQUARE FOOTAGE ARE BEING ADDED. BUILDING IMPR | $5,443,449 |
| 100994216 | 2024-07-22 | General construction | 1237 N CALIFORNIA AVE | FULL BUILDING PERMIT FOR SPRINKLERED 6-STORY, 40 DWELLING UNIT MULTI-FAMILY RESDIENTIAL ONLY BUILDING WITH AN ATTACHED 14-CAR GARAGE ACCESSED BY A PUBLIC ALLEY WITH 2 ACCESSIBLE SP | $13,307,685 |
| 101041431 | 2024-07-19 | General construction | 8915 S LOOMIS ST | ***DIRECT DEVELOPER SERVICES*** RENOVATION OF AN EXISTING 6 STORY, 60 UNIT SENIOR RESIDENTIAL BUILDING. ALL AS PER PLANS. CONSULTANT REVIEWER: V3 COMPANIES OF IL | $4,990,000 |
| 101039368 | 2024-07-15 | General construction | 530 W FULLERTON PKWY | - 2019 CBRC: 2-STORY ADDITION WITH FULL BASEMENT AND ASSOCIATED SITE WORK TO EXISTING CHURCH, AS PER PLANS (OCCUPANCY GROUP A-3; TYPE 3A CONSTRUCTION) (**CONDITIONAL PERMIT SUBJECT | $7,000,000 |
| B200015851 | 2024-05-03 | General construction | 2001 W GRAND AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 300 SQ. FT., LINTEL QTY. 1, MAX. LENGTH 4. PARAPET REBUILDING: 100 SQ. FT. LOCATION: EXTERIOR ELEVATIONS. | $10,000 |
| 101045117 | 2024-02-27 | General construction | 944 E 87TH ST | RENOVATION OF AN EXISTING COMMUTER RAIL STATION THAT IS ELEVATED ON AN EMBANKMENT AND ACCESSED FROM UNDER AN EXISTING BRIDGE STRUCTURE. SCOPE INCLUDES A NEW ELEVATOR, NEW STATION | $13,600,000 |
| 101041082 | 2024-02-13 | General construction | 5446 S MULLIGAN AVE | DDS 2019 CBRC: REVISION TO PERMIT #101003348 TO REVISE INTERIOR KITCHEN LAYOUT. SCOPE OF REVISIONS INCLUDES MECHANICAL, ELECTRICAL AND PLUMBING. NO CHANGE IN USE. CONSTRUCTION TYPE | $1,000,000 |
| 101003348 | 2023-12-11 | General construction | 5446 S MULLIGAN AVE | DDS 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING BANKING FACILITY (FINANCIAL SERVICES) FOR A FROZEN CUSTARD STORE (LIMITED RESTAURANT) TO INCLUDE INTERIOR SEATING AREA, | $1,000,000 |
| 101033391 | 2023-11-15 | General construction | 1435 W WEBSTER AVE | ***DIRECT DEVELOPER SERVICES*** REVISION TO PERMIT 101007958 TO INSTALL TWO SKYLIGHTS ON EXISTING SECOND FLOOR ROOF. ALL AS PER PLANS. CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERI | $175,000 |
| 101037759 | 2023-11-06 | General construction | 10301 S DAUPHIN AVE | RENOVATION OF EXISTING COMMUTER RAIL STATION THAT IS ELEVATED ON AN EMBANKMENT AND ACCESSED FROM UNDER AN EXISTING BRIDGE STRUCTURE WHICH INCLUDES A NEW ELEVATOR, A NEW STATION ENC | $13,600,000 |
| 101004802 | 2023-08-31 | General construction | 1435 W WEBSTER AVE | ***DIRECT DEVELOPER SERVICES***. NEW BASEMENT ELEVATOR IN AN EXISTING COMMERCIAL BUILDING (GROUP B OCCUPANCY; TYPE 1B CONSTRUCTION). AS PER PLANS.CONSULTANT REVIEWER: GLOBETROTTER | $500,000 |
| 101014027 | 2023-08-22 | General construction | 717 S DESPLAINES ST | DDS 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 1-STORY BUILDING FOR AN AUTOMOBILE SALES, DELIVERY AND SERVICE CENTER FACILITY AS PER PLANS. (OCCUPANCY GROUP S1, B; TYPE IIA CONSTR | $4,000,000 |
| 100966336 | 2023-08-21 | General construction | 3558 N SPAULDING AVE | SPR 2019 CBC: ERECT NEW 1 STORY RETAIL STORE WITH DONATION DROP OFF. WORK TO INCLUDE NEW LANDSCAPE, PARKING LOT AND DRIVEWAYS AS PER PLANS. IIB CONSTRUCTION. M- MERCANTILE [CORE / | $2,500,000 |
| 101026717 | 2023-08-04 | General construction | 1113 E 79TH ST | RENOVATION OF AN EXISTING COMMUTER RAIL STATION THAT IS ELEVATED ON AN EMBANKMENT AND ACCESSED FROM UNDER AN EXISTING BRIDGE STRUCTURE. SCOPE INCLUDES A NEW ELEVATOR , A NEW STATI | $12,600,000 |
| 101005886 | 2023-07-18 | General construction | 2600 S DR MARTIN L KING JR DR | DDS 2019 CBRC: RENOVATIONS TO BUILDING'S INTERIORS INCLUDING COMMON AREAS, TENANT UNITS, AND MECHANICAL SPACES -, BUILDING EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK (OCC | $3,894,968 |
| 101005883 | 2023-07-18 | General construction | 2601 S PRAIRIE AVE | DDS 2019 CBRC: RENOVATIONS TO BUILDING'S INTERIORS INCLUDING COMMON AREAS, TENANT UNITS AND MECHANICAL SPACES -, BUILDING EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK. (OCC | $3,894,968 |
| 100983227 | 2023-07-14 | General construction | 808 E 61ST ST | SPR 2019 CBRC: NEW ROOFING, UPGRADES TO PLUMBING AND MECHANICAL EQUIPMENT, REPLACE COMMON AREA FINISHES AND ACCESSIBILITY UPGRADES. NEW UNIT KITCHEN AND BATH CABINETS, COUNTERTOPS, | $7,335,000 |
| 101005878 | 2023-07-13 | General construction | 2610 S CALUMET AVE | DDS 2019 CBRC: LEVEL 2 ALTERATION TO EXISTING 2 STORY TOWNHOME BUILDING, BUILDING INTERIOR, EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK . (OCCUPNACY R-2, CONSTRUCTION TYPE | $796,698 |
| 101005879 | 2023-07-13 | General construction | 2619 S CALUMET AVE | DDS 2019 CBRC: RENOVATIONS TO BUILDING'S INTERIORS INCLUDING COMMON AREAS, TENANT UNITS, AND MECHANICAL SPACES -, BUILDING EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK. (OC | $1,239,308 |
| 101005880 | 2023-07-13 | General construction | 2625 S PRAIRIE AVE | DDS 2019 CBRC: RENOVATIONS TO BUILDING'S INTERIORS INCLUDING COMMON AREAS, TENANT UNITS, AND MECHANICAL SPACES -, BUILDING EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK. (OC | $1,239,308 |
| 101005881 | 2023-07-13 | General construction | 2622 S DR MARTIN L KING JR DR | DDS 2019 CBRC: RENOVATIONS TO BUILDING'S INTERIORS INCLUDING COMMON AREAS, TENANT UNITS, AND MECHANICAL SPACES -, BUILDING EXTERIOR AND FENESTRATION, MEP SYSTEMS, AND SITEWORK. (OC | $796,698 |
| 100983235 | 2023-07-12 | General construction | 6033 S COTTAGE GROVE AVE | SPR 2019 CRBC: NEW ROOFING, UPGRADES TO PLUMBING AND MECHANICAL EQUIPMENT, REPLACE COMMON AREA FINISHES AND ACCESSIBILITY UPGRADES AT EXISTING 7-STORY 60-UNIT APARTMENT BUILDING FO | $7,617,000 |
| 101007958 | 2023-06-27 | General construction | 1435 W WEBSTER AVE | ***DIRECT DEVELOPER SERVICES*** INTERIOR AND EXTERIOR RENOVATIONS TO AN EXISTING TWO-STORY OFFICE BUILDING. BASEMENT ELEVATOR PERMIT UNDER PERMIT #101004802 AS PER PLANS. [CORE / | $2,200,000 |
| 100947976 | 2023-03-03 | General construction | 4501 W NORTH AVE | DDS: 2019 CBC: ERECT NEW ACCESSORY STORAGE BUILDING. WORK TO INCLUDE CIVIL, ARCHITECTURE, STRUCTURAL AND ELECTRICAL AS PER PLANS (CONSTRUCTION TYPE: VB; OCCUPANCY: S-1) CONSULTANT | $590,000 |
| 100980444 | 2023-03-02 | General construction | 218 E GRAND AVE | (DIRECT DEVELOPER SERVICES / 2019 CBC) NEW CONSTRUCTION OF A 21-STORY MIXED USE BUILDING TO INCLUDE RESIDENTIAL (248 UNITS) OFFICE, RETAIL & PARKING (102 AUTOMOBILE PARKING SPACES | $78,500,000 |
| 100972528 | 2023-02-17 | General construction | 4501 W NORTH AVE | 2019 CBRC: ADDITION AND INTERIOR ALTERATIONS TO EXISTING MAIN BUILDING WORK TO INCLUDE ARCHITECTURE, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING AS PER PLANS. CONSULTANT REVIEW | $380,000 |
| 100980285 | 2022-12-21 | General construction | 218 E GRAND AVE | (DIRECT DEVELOPER SERVICES / 2019 CBC) FOUNDATION & SUPERSTRUCTURE (EXCLUDING EXTERIOR FACADE) FOR A 21-STORY MIXED USE BUILDING TO INCLUDE RESIDENTIAL (248 UNITS) OFFICE, RETAIL | $7,850,000 |
| 100969592 | 2022-12-12 | General construction | 4600 N MARINE DR | DDS: NEW CONSTRUCTION 12 STORY RESIDENTIAL. 303 RESIDENTIAL APARTMENTS. 10 STORIES OF RESIDENTIAL AND 2 STORIES OF PARKING.136 PARKING SPACES AND 150 BIKE PARKING. R-2 RESIDENTIAL, | $78,000,000 |
| 100949677 | 2022-11-16 | General construction | 919 S ADA ST | PD 896. DDS 2019 CBRC: PHASE 2 OF 2. ALTERATION AND ADDITIONS TO PORTION OF EXISTING 3 STORY FORMER RESIDENTIAL BUILDING SERVING AS MUSEUM. MUSEUM BUILDOUT IN BUILDING'S SOUTH WING | $7,612,531 |
| 100955487 | 2022-11-16 | General construction | 6450 N CALIFORNIA AVE | 2019 CBC & CBRC: NEW 2-STORY 13,631 SF ADDITION AT AN EXISTING NON-PROFIT SOCIAL SERVICES PROVIDER TO INCLUDE A NEW ROOF DECK AND PARTION INTERIOR RENOVATION TO THE EXISTING BUILDI | $12,015,276 |
| 100917531 | 2022-11-16 | General construction | 919 S ADA ST | PD 896. DDS 2019 CBRC: ALTERATION AND PARTIAL CHANGE OF OCCUPANCY TO EXISTING 37,533 SF, 3 STORY RESIDENTIAL BUILDING, INCLUDING FULL BUILDOUT OF 15 DWELLING UNITS IN NORTH WING A | $8,000,000 |
| 100973402 | 2022-09-09 | General construction | 2236 N ROCKWELL ST | CPS SCHOOL WITH NO CHANGE IN USE: SPR 2019 CBRC NON-OCCUPIABLE ELEVATOR ADDITION AND INTERIOR ALTERATIONS TO EXISTING 4 STORY MASONRY SCHOOL AS PER PLANS. E-1 OCCUPANCY, IIIA CONST | $2,000,000 |
| 100947807 | 2022-08-08 | General construction | 534 E 38TH ST | DDS 2019 CBC: NEW CONSTRUCTION A 3-STORY MUTI-FAMILY RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND 17 OFF-STREET VEHICLE PARKING SPACES. (OCCUPANCIES: R-2; CONSTRUCTION TYPE: VA) | $6,348,000 |
| 100947868 | 2022-08-05 | General construction | 624 E PERSHING RD | DDS 2019 CBC: FOR NEW CONSTRUCTION OF A PROPOSED 3-STORY MUTI-FAMILY RESIDENTIAL BUILDING WITH 30 DWELLING UNITS AND 16 OFF-STREET VEHICLE PARKING SPACES. (OCCUPANCIES: R-2; CONSTR | $9,252,000 |
| 100972959 | 2022-07-27 | General construction | 2236 N ROCKWELL ST | CPS SCHOOL WITH NO CHANGE IN USE: SELF CERTIFICATION 2019 CBRC: ROOF REPLACEMENT, MASONRY REPAIRS AND ALTERATION OF EXTERIOR WALL IN EXISTING 4 STORY MASONRY SCHOOL AS PER PLANS. E | $3,750,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
