COMPANY RECORD · CHICAGO, IL

Jimmy'z Masonry Corp — permit history in Chicago, IL

Jimmy'z Masonry Corp appears on 74 Chicago permit records from 2008 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction74100%

Activity by year

YearPermits issued
20081
20121
20148
20154
20162
20176
20188
20198
202010
20215
20226
20231
20245
20255
20264

Busiest year on record: 2020, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
F.E. Moran Inc132026-07-06
Titan Electric LLC92025-03-21
Ewing-Doherty Mechanical, Inc82026-01-27
Hill Mechanical Corp.82026-05-28
Great Lakes Plumbing & Heating62025-03-21
Gurtz Electric Company62023-06-07
Heatmasters Inc52022-10-07
Norman Mechanical52022-10-07
Kelso-Burnett Co.52021-08-24
Advance Mechanical Systems, In42025-03-21
Jamerson & Bauwens Elec. Contr42026-07-06
Merit Electric LLC42020-09-04

73 companies are named alongside Jimmy'z Masonry Corp on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
710 N FAIRBANKS CT2026-07-06
10000 W OHARE AIRPORT2026-05-28
2211 N OAK PARK AVE2026-01-27
10000 W OHARE ST2025-08-14
201 N SANGAMON ST2025-06-05
1706 N KEDZIE AVE2025-04-04
194 N CLARK ST2025-03-21
2929 W 19TH ST2025-02-20
4450 N CLARK ST2024-12-05
171 N LA SALLE ST2024-10-29
920 E 58TH ST2024-10-09
150 E ONTARIO ST2023-06-07
1600 N MILWAUKEE AVE2022-07-27
633 S LA SALLE ST2022-05-10

51 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $321,000,000, median $1,500,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

74 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
1010826602026-07-06General construction710 N FAIRBANKS CTDDS 2019 CBRC: RENOVATION TO EXISTING LAB/OFFICE BUILDING ON FLOORS 2, 4, 6, 7 AND PENTHOUSE 1 FOR EXPANSION OF LABS TO INCLUDE MECHANICAL PENTHOUSE ADDITION ON LEVEL 4. CONSTRUCTI$81,315,000
1010836482026-05-28General construction10000 W OHARE AIRPORTDS 2019 CBRC: REVISION TO FULL BUILDING PERMIT 101056000 FOR THE RENOVATION OF EXISTING SPACE AND ADDITION OF APPROXIMATELY 35,960 SF AT TERMINAL 3 OF O'HARE INTERNATIONAL AIRPORT.$250,000,000
1010791332026-02-03General construction10000 W OHARE AIRPORTTERMINAL 3 - RELOCATION/REVISION TO FOUR CAISSONS$500,000
1010752322026-01-27General construction2211 N OAK PARK AVESPR 2019 CBRC: INTERIOR RENOVATION OF AN EXISTING SHRINERS CHILDREN'S HOSPITAL TO ACCOMMODATE A NEW IMAGING SUITE WITH CT AND MRI.(OCCUPANCY GROUP I-2; TYPE II-B CONSTRUCTION) PER $500,000
1010730432025-08-14General construction10000 W OHARE STDS 2019 CBRC: ERS/EX ONLY USING STABILIZATION PILES FOR THE RENOVATION OF EXISTING 2-STORY WITH 1 LEVEL BELOW GRADE AT TERMINAL 3 OF O'HARE INTERNATIONAL AIRPORT. CAISSONS ONLY PER$1,100,000
1010648542025-06-05General construction201 N SANGAMON STDDS 2019 CBC: INITIAL TENANT BUILDOUT OF 31,000 SF COMMERCIAL GYM WITH ACCESSORY CAFE, RETAIL, AND SPA WITH MASSAGE SERVICES ON LEVELS 1 AND 2 OF 11 STORY BUILDING. INCLUDES ELECTR$1,550,000
1010599192025-04-04General construction1706 N KEDZIE AVE(SELF-CERT 2019 CBRC) INTERIOR & EXTERIOR ALTERATIONS TO EXISTING 4-STORY TRANSITIONAL SHELTER TO INCLUDE INSTALLATION OF NEW ELEVATOR AND ASSOCIATED SITE WORK AS PER PLANS. (OCCUP$2,030,000
1010572812025-03-21General construction194 N CLARK STDDS 2019 CBC: INTERIOR ALTERATIONS TO EXISTING CTA STATION ON CONCOURSE, GROUND & LEVEL 2 IN AN EXISTING 17-STORY OFFICE BUILDING AS PER PLANS. (OCCUPANCY GROUP: A-3 / TYPE 1A CONS$35,000,000
B2004142142025-02-20General construction2929 W 19TH STFOR PERMIT 101061007: REPLACEMENT MASON CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
1010550452024-12-05General construction4450 N CLARK STSPR 2019 CBRC: INTERIOR BUILD OUT OF THE SECOND-FLOOR BLACK BOX STUDIO THEATER AND REHEARSAL ROOM FOR THE BLACK ENSEMBLE THEATER AND CULTURAL CENTER. THE NEW STUDIO WILL HAVE APPRO$3,250,000
1010397842024-10-29General construction171 N LA SALLE ST(DIRECT DEVELOPER SERVICES / 2019 CBRC) PHASE 3 OF 3 INTERIOR & EXTERIOR ALTERATIONS TO EXISTING 17-STORY OFFICE BUILDING TO INCLUDE INSTALLATION OF NEW EXTERIOR WINDOW WALL SYSTEM$292,000,000
1010604732024-10-09General construction920 E 58TH STSELF-CERT 2019 CBRC: ALTERATIONS OF RESEARCH LABS ON FLOORS 6 AND 7 AND PARTIAL ALTERATION FOR NEW AHU IN BASEMENT IN AN 11 STORY UNIVERSITY BUILDING (OCCUPANCY GROUP B; TYPE I-A C$13,000,000
1010560002024-07-30General construction10000 W OHARE AIRPORTFULL BUILDING PERMIT FOR THE RENOVATION OF EXISTING SPACE AND ADDITION OF APPROXIMATELY 35,960SF AT TERMINAL 3 OF O'HARE INTERNATIONAL AIRPORT. CAISSON ONLY AND ERS UNDER SEPARATE $250,000,000
1010528032024-06-07General construction10000 W OHARE AIRPORTTERMINAL 3 - CAISSON VERTICAL PENETRATIONS ONLY$1,300,000
1010154852023-06-07General construction150 E ONTARIO ST2019 CBC: DIRECT DEVELOPER SERVICE REVISION TO PERMIT 100977163 TO ADD GLASS BALCONY TO THE 26TH FLOOR AS PER PLANS.CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING$472,000
1009771632022-10-07General construction150 E ONTARIO ST2019 CBC: DIRECT DEVELOPER SERVICES-NEW CONSTRUCTION-FULL BUILDING OF A 28-STORY, 390 ROOM HOTEL BUILT OUT OF PRE-CAST AND CAST-IN-PLACE CONCRETE W/ BASEMENT AS PER PLANS. FOUNDATI$67,496,365
1009701792022-07-27General construction1600 N MILWAUKEE AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO GROUND FLOOR OF AN EXISTING BUILDING TO ADD ADDITIONAL INTERIOR PARKING SPACES AS PER PLANS. (STRUCTURAL PEER REVIEW) (OCCUPANCY GROUP$50,000
1009599272022-07-19General construction150 E ONTARIO ST2019 CBC: DIRECT DEVELOPER SERVICES CAISSON AND FOUNDATION (TO INCLUDE CONCRETE ARCHITECTURAL COMPONENTS UP TO LEVEL O1 SLAB) ONLY NEW CONSTRUCTION OF A 28-STORY, 390 ROOM HOTEL BU$70,000,000
1009352222022-05-10General construction633 S LA SALLE STDDS 2019 CBC: FULL BUILDING PERMIT INCLUDING ERS AND OPEN EXCAVATION FOR 18-STORY RESIDENTIAL BUILDING WITH 117 DWELLING UNITS AND NO BASEMENT. CAISSONS ONLY PERMIT 100934004 (CONS$45,000,000
1009447812022-04-14General construction1111 N CLARK STDDS 2019 CBRC: ALTERATION AND ADDITION TO EXISTING 4-STORY VEHICLE SALES AND SERVICE BUILDING INCLUDING ADDITION OF FIFTH FLOOR VEHICLE DISPLAY ROOM AND OUTDOOR PATIO. ALTERED LAYO$3,000,000
1009365392022-01-13General construction81 E VAN BUREN STSPR 2019 CBRC: INTERIOR ALTERATIONS IN EXISTING 11-STORY BUILDING ON THE 1ST FLOOR MAIN LOBBY, 1ST FLOOR MEZZANINE, 9TH FLOOR DINING, KITCHEN AND EXTERIOR TERRACE AS PER PLANS. (OC$6,541,426
1009366462021-11-08General construction81 E VAN BUREN STSPR 2019 CBRC: MODIFICATION TO EXISTING NORTH & SOUTH CHIMNEY¿S AT THE ROOF TO MAKE THEM FUNCTIONAL AS PER PLANS. (OCCUPANCY GROUP R-1, A-2; 1A CONSTRUCTION TYPE)$200,000
1009199792021-09-27General construction2900 N LAKE SHORE DRSPR 2019 CBRC: BUILD OUT OF NEW ELECTRICAL ROOM AT THE 2ND FLOOR AND ASSOCAITED ELECTRICAL WORK ON AT THE BASEMENT, GROUND FLOOR 2ND FLOOR AND PENT HOUSE IN EXISTING PARKGING GARAG$484,000
1009174852021-08-24General construction1365 N CHERRY AVESPR 2019 CBC - ALTERATIONS AND CHANGE OF OCCUPANCY OF AN EXISTING VACANT GROUND LEVEL FOR AN ELECTRICAL VEHICLE SERVICE GARAGE, INCLUDING INSTALLATION OF NEW ENTRY VESTIBULE, CHARG$800,000
1009110702021-07-21General construction1340 N CHERRY AVESPR 2019 CBC PHASE 2 OF TENANT FIT OUT OF AN EXISTING BUILDING FOR AN ELECTRIC VEHICLE SERVICE GARAGE, INCLUDING INSTALLATION OF NEW ENTRY VESTIBULE, CHARGING STATIONS, FENCING, DO$800,000
1008961032021-02-02General construction320 S CANAL ST(DIRECT DEVELOPER SERVICES - 2018 CHICAGO BUILDING CODE) REVISION TO PERMIT# 100846353 FOR MEP MODIFICATIONS ONLY ON THE 3RD FLOOR & LOWER LEVEL 1 AS PER PLANS. (OCCUPANCY TYPE: E$1,500,000
1008846452020-12-08General construction436 N CLARK STRENOVATION TO AN EXISTING ADULT USE CANNABIS DISPENSARY RETAIL TENANT SPACE TO CREATE A NEW ELEVATOR SHAFT FOR THE TENANT SPACE TO CONNECT THE BASEMENT AND THE FIRST LEVEL AS PER P$1
1008820022020-10-08General construction436 N CLARK STRENOVATION TO AN EXISTING ADULT USE CANNABIS DISPENSARY RETAIL STORE TO EXPAND SALES AREA ON THE FIRST FLOOR AND PROVIDE EMPLOYEE BREAKROOM IN THE BASEMENT. WORK TO INCLUDE STRUCTU$1
1008783212020-09-29General construction320 S CANAL ST(DIRECT DEVELOPER SERVICES) REVISION TO PERMIT# 100846353 TO ADD FOUR (4) FLOORS TO EXISTING FORTY-SIX (46) STORY OFFICE BUILDING, TO INCLUDE MODIFICATIONS TO THE GROUND FLOOR, 2ND$19,296,000
1008865512020-09-04General construction1648 W DIVISION ST***DIRECT DEVELOPER SERVICES*** REVISION TO PERMIT NUMBER 100766080; REMOVAL OF RESTROOM AT ROOFTOP AS PER PLANS *CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING$25,000
1008700922020-06-22General construction1648 W DIVISION ST***DIRECT DEVELOPER SERVICES*** REVISION TO PERMIT NUMBER 100766080; STRUCTURAL CHANGES TO THE GROUND LEVEL SLAB/FOUNDATIONS TO ACCOMMODATE VIBRATION ISOLATION AND THE ADDITION OF $500,000
1008774952020-06-15General construction2400 N LAKEVIEW AVETUCKPOINT EXISTING MASONRY WALL AT EXTERIOR FIRST FLR$8,800
1008463532020-04-24General construction320 S CANAL ST(DIRECT DEVELOPER SERVICES) NEW CONSTRUCTION OF A FORTY-SIX (46) STORY OFFICE BUILDING TO INCLUDE TWO (2) LEVELS OF BELOW GRADE PARKING AND GROUND FLOOR AS PER PLANS. (FOUNDATION $321,000,000
1007768302020-04-22General construction1650 W DIVISION ST***DIRECT DEVELOPER SERVICES*** NEW CONSTRUCTION OF TWELVE (12) FOUR (4) STORY TOWNHOMES AS PER PLANS$15,000,000
1008546832020-03-03General construction8110 S COTTAGE GROVE AVETUCKPOINTING - NO STRUCTURAL WORK - 400 SQFT$1,500
1008201702020-02-13General construction2155 N ELSTON AVE**DIRECT DEV SERVICES** FULL BUILDING PERMIT FOR THE NEW CONSTRUCTION OF A 7-STORY APARTMENT BUILDING WITH RETAIL AND PARKING AT GRADE. BASEMENT REMOVED FROM SCOPE. FOUNDATIONS ONL$12,000,000
1008177192019-12-24General construction320 S CANAL ST(DIRECT DEVELOPER SERVICES) FOUNDATION ONLY, TO INCLUDE GROUND FLOOR SLAB & ELEVATOR CORE TO THE 5TH FLOOR, FOR A FORTY-SIX (46) STORY OFFICE BUILDING TO INCLUDE TWO (2) LEVELS OF $17,347,933
1007737352019-10-04General construction916 W FULTON MARKETREVISION TO PERMIT #100714212. UPDATES TO INCLUDE ROOFTOP TERRACE ENCLOSURE AND MECHANICAL EQUIPMENT DETAILS AS PER PLANS. RESTAURANT AND RETAIL BUILDING. 0 DWELLING UNITS. 0 PARKI$50,000
1007592692019-07-18General construction10510 W ZEMKE RD**CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS ** ARCHITECTURAL CONSTRUCTION INCLUDES A PROPOSED TRITURATOR BUILDING ($2,000,000),PROPOSED BUILDING $97,000,000
1008027072019-04-22General construction110 N WACKER DR(DIRECT DEVELOPER SERVICES) REVISION TO PERMIT# 100761387 TO ADD TWO (2) MID-RISE OFFICE FLOORS (33 & 34) TO AN EXISTING (54) STORY OFFICE BUILDING TO INCLUDE MODIFICATIONS TO LOW$12,000,000
1008061772019-03-28General construction938 W NORTH AVE4,533 SF TENANT BUILD-OUT OF OFFICE SPACE ON THIRD FLOOR OF EXISTING 3-STORY 1-C SHOPPING CENTER BUILDING WITH BASEMENT PARKING. WORK INCLUDES MINOR FACADE CHANGES AT FIRST FLOOR, $800,000
1007988802019-02-22General construction938 W NORTH AVEREVISION TO PERMIT #100757379. TENANT BUILD-OUT OF RETAIL SPACE IN EXISTING 3-STORY I-C SHOPPING CENTER BUILDING WITH BASEMENT PARKING. WORK INCLUDES MINOR FACADE/STOREFRONT CHANGE$4,000,000
1007593742019-01-12General construction916 W FULTON MARKETFIRST TIME BUILD-OUT OF EXISTING 2-STORY BUILDING FOR NEW FOOD HALL WITH ROOF TOP DECK.$7,500,000
1007902342019-01-03General construction2002 N MOZART STREVISION TO EXISTING PERMIT 100747819 - INCREASING STRUCTURAL CAPACITY OF SUPPORT FOR ROOF, DOOR AND WINDOW OPENINGS PER LANDLORD REQUIREMENTS, REDUCING EXISTING PARKING, NOT REQUI$10,000
1007706392018-11-21General construction221 W HARRISON ST**DIRECT DEVELOPER SERVCES.** NEW CONSTRUCTION. FULL BUILDING PERMIT PHASE FOR 14 STORY RESIDENTIAL HIGH RISE BUILDING. DX-7, 173 TOTAL DWELLING UNITS, 104 DU PLUS 69 EFFICIENCY, W$42,906,936
1007706452018-10-16General construction207 W HARRISON STDIRECT DEVELOPER SERVCES. NEW CONSTRUCTION. 14 STORY RESIDENTIAL HIGH RISE BUILDING. DX-7, 173 TOTAL DWELLING UNITS, 104 DU PLUS 69 EFFICIENCY, WITH 61 RESIDENTIAL PARKING SPACES. $43,006,936
1007613872018-09-21General construction110 N WACKER DR(DIRECT DEVELOPER SERVICES) NEW CONSTRUCTION OF A FIFTY-FOUR (54) STORY OFFICE BUILDING TO INCLUDE PARKING ON LOWER LEVEL 1 AND LOWER LEVEL 2 (99 PARKING SPACES) AND GROUND FLOOR $300,000,000
1007142122018-06-11General construction916 W FULTON MARKETNEW CONSTRUCTION OF A CORE AND SHELL ONLY FOR A 2 STORY RESTAURANT AND RETAIL BUILDING AS PER PLANS.TENANT BUILD-OUT UNDER SEPARATE PERMIT, 0-DWELLING UNITS, 0 PARKING SPACES.$1
1007573412018-06-07General construction110 N WACKER DR(DIRECT DEVELOPER SERVICES) REVISION TO PERMIT# 100725551 FOR MODIFICATIONS TO THE FOUNDATION TO INCLUDE REPLACEMENT OF GRADE BEAMS / STRUCTURAL SLAB WITH 33" DEEP MAT SLAB, ADDITI$500,000
1007552812018-04-20General construction12600 S TORRENCE AVE***STRUCTURAL PEER REVIEW*** INTERIOR ALTERATIONS TO EXISTING FORD PLANT ADMINISTRATION OFFICES, CONFERENCE ROOMS, AND RESTROOMS. INCLUDES NEW PARTITIONS, DEMOLITION, NEW MECHANIC$1,100,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →