COMPANY RECORD · CHICAGO, IL
Pepper Construction Company — permit history in Chicago, IL
Pepper Construction Company appears on 1,165 Chicago permit records from 2006 through 2026, most often general construction (99.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 1164 | 99.9% |
| Demolition | 1 | 0.09% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 69 |
| 2007 | 68 |
| 2008 | 60 |
| 2009 | 45 |
| 2010 | 66 |
| 2011 | 53 |
| 2012 | 32 |
| 2013 | 40 |
| 2014 | 77 |
| 2015 | 78 |
| 2016 | 64 |
| 2017 | 67 |
| 2018 | 74 |
| 2019 | 56 |
| 2020 | 51 |
| 2021 | 61 |
| 2022 | 43 |
| 2023 | 44 |
| 2024 | 55 |
| 2025 | 39 |
| 2026 | 23 |
Busiest year on record: 2015, with 78 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Kelso-Burnett Co. | 161 | 2025-12-22 |
| Ewing-Doherty Mechanical, Inc | 112 | 2025-09-23 |
| F.E. Moran Inc | 108 | 2026-01-02 |
| State Mechanical Services | 102 | 2025-04-04 |
| Admiral Heating Vent | 98 | 2025-05-12 |
| Block Electric Company | 88 | 2026-05-18 |
| Terrance Electric & Technology | 74 | 2026-06-15 |
| Maron Electric Company | 69 | 2025-06-04 |
| Great Lakes Plumbing | 67 | 2022-11-23 |
| Hill Mechanical Group | 66 | 2025-03-31 |
| Hill Mechanical Corp. | 64 | 2025-12-30 |
| James P. O'sullivan | 57 | 2024-04-16 |
254 companies are named alongside Pepper Construction Company on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 104 S MICHIGAN AVE | 2026-08-26 |
| 1331 S WELLS ST | 2026-08-04 |
| 33 E IDA B WELLS DR | 2026-07-10 |
| 646 N MICHIGAN AVE | 2026-05-18 |
| 1200 S LAKE SHORE DR | 2026-05-14 |
| 2934 W LAKE ST | 2026-04-30 |
| 5140 N CALIFORNIA AVE | 2026-02-25 |
| 55 E ONTARIO ST | 2026-02-04 |
| 222 W MERCHANDISE MART PLZ | 2026-01-20 |
| 1 N LA SALLE ST | 2025-12-30 |
| 353 N CLARK ST | 2025-12-22 |
| 1060 W ADDISON ST | 2025-12-18 |
| 103 W CHESTNUT ST | 2025-12-02 |
| 111 W WACKER DR | 2025-10-02 |
305 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $323,650,000, median $375,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
1,165 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200481955 | 2026-08-26 | General construction | 104 S MICHIGAN AVE | SCOPE: ROOF REPLACEMENT. AREA: 1800 SQ. FT. ROOF COVERING: BUILT-UP ROOF. LOCATION: THE ROOF - SCOPE -NO TILE. JUST THE FLAT PORTIONS.. IL ROOFING CONTRACTOR LICENSE: 104013488. | $100 |
| 101081961 | 2026-08-04 | General construction | 1331 S WELLS ST | DDS 2019 CBC: REVISION TO 101075594. REVISIONS INCLUDE ADDITIONAL PILES, PILE TYPE CHANGES, AND LOWERING OF PILE CAPS FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC GROUPS A-5, | $3 |
| 101084868 | 2026-07-10 | General construction | 33 E IDA B WELLS DR | INSTALLATION OF VINYL SIGN ON EAST FACADE APPLIED TO INTERIOR OF GLASS - SIGN READS CENTER FOR STUDENT SUCCESS | $2,500 |
| 101084867 | 2026-07-10 | General construction | 33 E IDA B WELLS DR | INSTALLATION OF VINYL SIGN ON EAST FACADE APPLIED TO INTERIOR OF GLASS - SIGN READS COLUMBIA COLLEGE CHICAGO | $2,500 |
| 101083402 | 2026-06-15 | General construction | 104 S MICHIGAN AVE | **SELF CERT 2019 CBRC: REVISION TO PERMIT 101074245 FOR TAWANI ON THE 16TH FLOOR AS PER PLANS. PRIMARILY FLOOR PLAN CHANGES..NO CHANGE IN USE. (USE B-BUSINESS CONSTRUCTION TYPE 1A | $312,000 |
| 101082050 | 2026-06-05 | General construction | 1331 S WELLS ST | EAST TOWER CRANE PERMIT APPLICATION FOR THE INSTALLATION AND OPERATION OF A LIEBHERR 316 EC-H12 LITRONIC CRANE, AS PER PLANS. | $60,000 |
| 101080382 | 2026-06-03 | General construction | 1331 S WELLS ST | DDS 2019 CBC: SUPERSTRUCTURE ONLY PERMIT FOR A PROPOSED 4-STORY STADIUM WITH NO BASEMENT ON PILES. PILES ONLY PERMIT UNDER 101075594, SHALLOW FOUNDATIONS PERMIT UNDER 101079463. (O | $102,000,000 |
| 101082047 | 2026-05-21 | General construction | 1331 S WELLS ST | WEST TOWER CRANE PERMIT FOR THE INSTALLATION AND OPERATION OF A PEINER SK-415 FREESTANDING CRANE, AS PER PLANS. | $60,000 |
| 101081096 | 2026-05-18 | General construction | 646 N MICHIGAN AVE | SELF-CERT 2019 CBRC: STRUCTURAL PEER REVIEW INCLUDED. ALTERATION TO EXISTING 5TH FLOOR OCCUPIABLE ROOF GUARDRAIL. SCOPE TO INCLUDE REMOVAL OF EXISTING GUARDRAIL TO INSTALL NEW GUAR | $487,240 |
| 101082186 | 2026-05-14 | General construction | 1200 S LAKE SHORE DR | DDS 2019 CBRC & CBC: REVISION TO PERMIT #100994422 FOR LANDSCAPE UPDATES ONLY. NORTH SIDE OF EXISTING STAIRCASE, PROPOSED PLANNING REMOVED AS AREA TO REMAIN AS-IS. REVISE STRUCTURE | $100 |
| 101081461 | 2026-04-30 | General construction | 2934 W LAKE ST | (SELF-CERT 2019 CBRC) INTERIOR ALTERATION TO EXISTING THIRD FLOOR TO INCLUDE ONE NEW SLEEPING ROOM AND RENOVATION TO EXISTING BATHROOM. REPAIR FLOORS IN EXISTING THIRD FLOOR BATHRO | $875,000 |
| 101079463 | 2026-04-24 | General construction | 1331 S WELLS ST | DDS 2019 CBC: SHALLOW FOUNDATIONS ONLY FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC GROUPS A-5, B, S, M; CONST TYPE IA)CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING | $15,424,000 |
| 101081549 | 2026-04-09 | General construction | 33 E IDA B WELLS DR | SELF-CERT: REVISION TO PERMIT 101078579 TO INCLUDE EXTERIOR STOREFRONT REVISIONS ONLY. ORIGINAL PERMIT INCLUDED THE STOREFRONT REPLACEMENT IN ONE BAY AND REPLACEMENT OF METAL PANE | $100,000 |
| B200462916 | 2026-03-20 | General construction | 1331 S WELLS ST | INSTALL 2 TEMP SERVICES. 1-3000A AND 1-2000A. EACH SERVICE IS 480/277V.. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, SITE PARKING. | $1,000,000 |
| 101075594 | 2026-03-20 | General construction | 1331 S WELLS ST | DDS 2019 CBC: PILES ONLY PERMIT (VERTICAL PENETRATION ONLY) FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC GROUPS A-2, A-3, A-5, B, S-1, S-2, F-1, M; CONST TYPE IB) CONSULTANT | $5,000,000 |
| B200461112 | 2026-03-09 | General construction | 1331 S WELLS ST | 16 TEMPORARY TRAILER(S) IN CONNECTION WITH WORK UNDER PERMIT 101075594. 2 PORTABLE NON-SEWER TOILETS PROVIDED ON SITE. PERMIT START DATE: 3/25/2026. PERMIT DURATION: 2 YEARS. | |
| 101079754 | 2026-02-25 | General construction | 5140 N CALIFORNIA AVE | SELF CERT 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 5TH FLOOR PULMONOLGY EXAM ROOMS, TOILET ROOMS, WAITING AREAS AND OFFICE TO INCLUDE PARTITIONS AND MEP WORK AS PER PLANS (OCCUPA | $807,816 |
| B200453241 | 2026-02-04 | General construction | 55 E ONTARIO ST | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION AT LEVEL 1 LUGGAGE AND GIFT SHOP FOR INSTALLATION OF NEW DOOR AND PARTITION. AT LEVEL 2 MEETING ROOM, REMOVE AND REPLACE PARTITION. NO FLOO | $999 |
| 101078579 | 2026-02-02 | General construction | 33 E IDA B WELLS DR | SELF-CERT: PHASE 2 OF 2. INTERIOR BUILD-OUT OF 1ST FLOOR OF EXISTING BUSINESS USE - ADULT EDUCATION. WORK TO INCLUDE CONSTRUCTION OF NON-LOAD BEARING PARTITIONS AND ASSOCIATED MEP | $4,650,000 |
| B200455021 | 2026-01-20 | General construction | 222 W MERCHANDISE MART PLZ | SCOPE: NONSTRUCTURAL INTERIOR REPLACEMENT OF ENTRANCE SLIDING DOOR, NEW ELECTRICAL FOR ALTERATION OF EXISTING EXIT SIGNAGETO SUITE EXIT. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RES | $41,000 |
| 101078542 | 2026-01-15 | General construction | 5140 N CALIFORNIA AVE | SELF CERT 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 4TH FLOOR WOMEN'S HEALTH CENTER EXAM ROOMS, STAFF LOUNGE, CORRIDORS & WAITING AREAS TO INCLUDE NEW PARTITIONS AND MEP WORK AS P | $5,718,499 |
| 101077676 | 2026-01-12 | General construction | 33 E IDA B WELLS DR | SELF-CERT: PHASE 1 OF 2. INTERIOR DEMOLITION ONLY OF NON-LOAD BEARING PARTITIONS ON THE 1ST FLOOR OF EXISTING BUSINESS USE - ADULT EDUCATION. IA CONSTRUCTION; B- BUSINESS | $250,000 |
| 101077650 | 2026-01-02 | General construction | 1200 S LAKE SHORE DR | SELF-CERT 2019 CBRC: RENOVATION OF THE EXISTING 4D THEATER, LOCATED AT THE OCEANARIUM. IMPROVEMENTS INCLUDE NEW THEATER SEATS, INTERIOR FINISHES, AND THEMATIC LIGHTING. THE FOOTPRI | $1,420,000 |
| 101074245 | 2025-12-31 | General construction | 104 S MICHIGAN AVE | SELF CERT 2019 CBRC:STRUCTURAL PEER REVIEW INCLUDED. INTERIOR RENOVATION TO THE 16TH FLOOR FOR TAWANI. WORK INCLUDES: DEMOLITION, INTERIOR PARTITIONS, FINISHES, PLUMBING. ELECTRICA | $250,000 |
| B200454856 | 2025-12-30 | General construction | 1 N LA SALLE ST | FOR PERMIT 101073885: REPLACEMENT ELECTRICAL CONTRACTOR. REPLACEMENT GENERAL CONTRACTOR. REPLACEMENT PLUMBING CONTRACTOR. REPLACEMENT OTHER CONTRACTOR. NEW CONTRACTOR(S) LISTED | |
| 101075868 | 2025-12-22 | General construction | 353 N CLARK ST | DDS 2019 CBRC: RENOVATION OF EXISTING GROUND FLOOR AMENITY SPACE TO INCLUDE RENOVATED DINING SPACE, PREP AREAS AND TOILET ROOMS. NEW COMMUNICATING STAIR BETWEEN LEVELS 1 AND 2 FOR | $12,300,000 |
| 101076254 | 2025-12-18 | General construction | 1060 W ADDISON ST | DDS 2019 CBC TO REPLACE A RAMP FROM THE TERRACE TO UPPER DECK. (OCCUPANCY GROUPS: A-5; TYPE 2 CONSTRUCTION. ALL AS PER PLANS CONSULTANT REVIEWER: V3 COMPANIES OF IL | $750,000 |
| B200447830 | 2025-12-02 | General construction | 103 W CHESTNUT ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 16 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 400 SQ. FT. LOCATION: LIMITED LIMESTONE/MASONRY REPAIRS. | $200,000 |
| 101073842 | 2025-10-15 | General construction | 5140 N CALIFORNIA AVE | SELF CERT 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 5TH FLOOR BREAST SURGERY SUITE OFFICES, EXAM ROOMS, RECEPTION, WAITING AREAS AND TOILET ROOM TO INCLUDE NEW PARTITIONS AND MEP | $621,729 |
| 101074918 | 2025-10-06 | General construction | 33 E IDA B WELLS DR | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO TWO EXISTING SUITES ON THE 6TH FLOOR FOR USE BY STUDENTS AT COLUMBIA COLLEGE. WORK TO INCLUDE DEMOLITION AND CONSTRUCTION ON NON-LOAD | $1,000,000 |
| B200435825 | 2025-10-02 | General construction | 111 W WACKER DR | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISITNG BAR (NO FLOOR PLAN ALTERATIONS). RECONFIGURATION OF BAR, NEW BAR FACE, NEW FLOOR FINISH, NEW MILLWORK AT BACK BAR AND ELECTRICA | $100,000 |
| 101074280 | 2025-09-25 | General construction | 353 N CLARK ST | SELF CERT 2019 CBRC: INTERIOR BUILD-OUT OF 5TH FLOOR OFFICE SPACE FOR NEW TENANT CONFERENCE AND LOUNGE AREAS AND BUILDING MANAGEMENT OFFICES. WORK TO INCLUDE CONSTRUCTION OF NON-L | $5,500,000 |
| 101055932 | 2025-09-23 | General construction | 1500 N HOOKER ST | DDS 2019 CBRC: REVISION TO PERMIT 101029201 TO RELOCATE 2ND FLOOR TOILET ROOMS AS PER PLANS (B- BUSINESS, III B CONSTRUCTION) CONSULTANT REVIEWER: PRIMERA ENGINEERING | $5,000,000 |
| 101074276 | 2025-09-23 | General construction | 353 N CLARK ST | SELF-CERT: INTERIOR ALTERATIONS TO EXISTING 1ST FLOOR FITNESS CENTER TO INCLUDE RENOVATIONS OF EXERCISE ROOMS, LOCKER ROOMS, AND STORAGE ROOMS. NO CHANGE IN USE. (A-3 ASSEMBLY; IA | $1,290,000 |
| 101072482 | 2025-09-10 | General construction | 111 S MICHIGAN AVE | DDS 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR AND FIRST FLOOR SPACE AT EXISTING GALLERY AT THE ART INSTITUTE OF CHICAGO. WORK TO INCLUDE DEMO, NEW PARTITIONS, NEW CE | $1,884,972 |
| 101072824 | 2025-08-25 | General construction | 5700 S MARYLAND AVE | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO 6TH FLOOR OPERATING ROOM TO REPLACE (2) ELECTROPHYSIOLOGY LABS WITH (2 ) NEW OPERATING ROOMS IN EXISTING HOSPITAL. AS PER PLANS. (OCCU | $2,100,000 |
| 101071912 | 2025-07-31 | General construction | 920 E 58TH ST | SELF-CERT 2019 CBRC: REVISION TO PERMIT 101060473 TO RECONFIGURE OFFICE SPACES, LAB SUPPORT SPACES AND ASSOCIATED MEP WORK (OCCUPANCY GROUP B; TYPE I-A CONSTRUCTION). | $70,000 |
| 101070148 | 2025-07-21 | General construction | 120 E DELAWARE PL | ALTERATION TO EXERCISE ROOM AND ADJOINING STAIR ON THE 8TH FLOOR IN EXISTING 66 STORY MIXED-USE BUILDING. NO CHANGE TO OCCUPANCY OR STRUCTURE. NO CHANGE TO DWELLING UNITS | $325,000 |
| B200429415 | 2025-07-15 | General construction | 835 W ADDISON ST | FOR PERMIT 100978743: REPLACEMENT MASON CONTRACTOR. ADDITIONAL MASON CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. | |
| 101068309 | 2025-06-30 | General construction | 233 S WACKER DR | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING PARTIAL 18TH FLOOR OFFICE SPACE, TO INCLUDE NON STRUCTURAL DEMO OF CONFERENCE ROOMS TO CONVERT INTO LARGER CONFERENCE ROOM, RE | $300,000 |
| 101067264 | 2025-06-24 | General construction | 172 W ADAMS ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS AT TWO (2) EXISTING GUESTROOMS AND PARTIAL PUBLIC CORRIDOR AT THE 14TH FLOOR OF AN EXISTING 22-FLOOR HOTEL BUILDING (OCCUPANCY GROUP R-1; | $265,000 |
| 101069596 | 2025-06-10 | General construction | 920 E 58TH ST | SELF-CERT 2019 CBRC: REVISION TO PERMIT 101060473 TO RECONFIGURE LAB SPACES AND ASSOCIATED MEP WORK (OCCUPANCY GROUP B; TYPE I-A CONSTRUCTION). | $600,000 |
| 101067158 | 2025-06-04 | General construction | 233 S WACKER DR | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 23RD FLOOR OFFICE SPACE. NO CHANGE TO EXISTING USE. (OCCUPANCY B / CONSTRUCTION TYPE 1A) | $5,900,000 |
| 101068389 | 2025-06-03 | General construction | 172 W ADAMS ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS AT ONE (1) EXISTING GUESTROOM AND PARTIAL PUBLIC CORRIDOR AT THE 7TH FLOOR OF AN EXISTING 22-FLOOR HOTEL BUILDING (OCCUPANCY GROUP R-1; TY | $134,000 |
| 101067651 | 2025-05-20 | General construction | 5140 N CALIFORNIA AVE | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING MEDICAL ONCOLOGY AND RETAIL PHARMACY SPACES ON THE 1ST FLOOR OF THE GALTER MEDICAL PAVILION BUILDING ON THE SWEDISH HOSPITAL | $3,329,575 |
| 101067157 | 2025-05-12 | General construction | 233 S WACKER DR | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 8TH FLOOR OFFICE SPACE. NO CHANGE TO EXISTING USE. (OCCUPANCY B / CONSTRUCTION TYPE 1A) | $700,000 |
| B200425094 | 2025-05-09 | General construction | 71 S WACKER DR | FOR PERMIT 101066314: REPLACEMENT GENERAL CONTRACTOR. REPLACEMENT ELECTRICAL CONTRACTOR. REPLACEMENT PLUMBING CONTRACTOR. REPLACEMENT OTHER CONTRACTOR. NEW CONTRACTOR(S) LISTED | |
| 101068750 | 2025-05-06 | General construction | 180 N STETSON AVE | SELF-CERT 2019 CBRC: INTERIOR RENOVATION OF EXISTING TENANT OFFICE SUITE ON FLOOR 14. RENOVATION INCLUDES NEW INTERIOR PARTITIONS, CEILING, LIGHTING, AND FINISHES AS WELL AS THEREW | $156,990 |
| 101064272 | 2025-05-05 | General construction | 1532 W 14TH ST | DDS 2019 CBC: ADD AN OCCUPIABLE ROOF DECK TO EXISTING 2-STORY PERFORMANCE CENTER TRAINING FACILITY FOR THE CHICAGO FIRE FOOTBALL CLUB. TYPE II-B CONSTRUCTION, NON-SEPARATED MIXED U | $1,500,000 |
| B200417594 | 2025-04-30 | General construction | 900 N MICHIGAN AVE | SCOPE: NONSTRUCTURAL INTERIOR REMODEL OF EXISTING RESTROOMS, REPLACE PLUMBING AND ELCTRICAL FIXTURES AND FINISHES. LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 1 IN | $400,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
