COMPANY RECORD · CHICAGO, IL
Corporate Plumbing Inc — permit history in Chicago, IL
Corporate Plumbing Inc appears on 103 Chicago permit records from 2009 through 2026, all of them plumbing.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 103 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2009 | 1 |
| 2010 | 1 |
| 2011 | 2 |
| 2013 | 7 |
| 2014 | 10 |
| 2015 | 18 |
| 2016 | 2 |
| 2017 | 3 |
| 2018 | 19 |
| 2019 | 1 |
| 2020 | 5 |
| 2021 | 4 |
| 2022 | 14 |
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 11 |
| 2026 | 1 |
Busiest year on record: 2018, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Skender Construction, LLC. | 20 | 2018-12-20 |
| James Mchugh Construction Co | 6 | 2016-04-01 |
| Midwest Masonry, Inc. | 5 | 2015-10-09 |
| Madison Construction Company | 5 | 2017-07-05 |
| Summit Design & Build, LLC. | 5 | 2019-10-15 |
| Pepper Construction Company | 5 | 2025-07-31 |
| 41 North Contractors, LLC | 4 | 2015-01-30 |
| Englewood Construction, Inc. | 4 | 2015-10-09 |
| Alpha Construction Services, LLC | 4 | 2020-05-26 |
| Walsh Construction Company II, LLC | 4 | 2014-04-17 |
| Walsh Construction Company | 4 | 2016-02-05 |
| Mastership Construction Co. In | 3 | 2020-05-19 |
59 companies are named alongside Corporate Plumbing Inc on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 751 W BRIAR PL | 2026-04-01 |
| 310 W HURON ST | 2025-12-16 |
| 1539 N PULASKI RD | 2025-12-10 |
| 227 W CHICAGO AVE | 2025-09-30 |
| 705 W CHICAGO AVE | 2025-08-19 |
| 920 E 58TH ST | 2025-07-31 |
| 5224 W CHICAGO AVE | 2025-07-17 |
| 111 W ILLINOIS ST | 2025-07-11 |
| 750 N STATE ST | 2025-04-16 |
| 3026 N ASHLAND AVE | 2023-08-09 |
| 1134 S WOOD ST | 2022-11-16 |
| 5433 N WINTHROP AVE | 2022-09-29 |
| 5101 N KENMORE AVE | 2022-09-29 |
| 5230 N WINTHROP AVE | 2022-09-29 |
81 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $396,200,000, median $570,492. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
103 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101077534 | 2026-04-01 | Plumbing | 751 W BRIAR PL | DDS 2019 CBC ADAPTIVE REUSE OF EXISTING 2 STORY THEATRE INTO RESIDENTIAL APARTMENTS, THREE STORY ADDITION ON TOP OF EXISTING THEATRE BUILDING AND NEW 5 STORY ADDITION TO THE SOUTH | $3,000,000 |
| 101075524 | 2025-12-16 | Plumbing | 310 W HURON ST | DIRECT DEVELOPER SERVICES 2019 CBC COMPLETE 8TH AND 9TH FLOORS AND BUILDOUT OF ALL FLOORS FOR NEW 9 STORY RESIDENTIAL BUILDING WITH 101 STANDARD DWELLING UNITS 48 EFFICIENCY UNITS | $24,000,000 |
| 101064943 | 2025-12-10 | Plumbing | 1539 N PULASKI RD | DDS 2019: FULL BUILDING PERMIT FOR 6 STORY 61 DWELLLING UNIT APARTMENT BUILDING CONNECTED TO EXISTING 2 STORY BUILDING WITH 26 PARKING SPACES. (OCCUPANCY GROUP B, R2; TYPE IIA CONS | $26,500,000 |
| 101071274 | 2025-11-21 | Plumbing | 310 W HURON ST | DIRECT DEVELOPER SERVICES 2019 CBC ERECT FOUNDATION AND CORE ONLY UP TO 7TH FLOOR CEILING UPON PREVIOUSLY APPROVED CAISSONS (PERMIT 101070670) FOR 9 STORY RESIDENTIAL BUILDING WITH | $7,000,000 |
| 101068348 | 2025-09-30 | Plumbing | 227 W CHICAGO AVE | DIRECT DEVELOPER SERVICES 2019 CBC ERECT 10 STORY NO BASEMENT, 56 DU RESIDENTIAL BUILDING WITH 1 GROUND FLOOR RETAIL SPACE AND 22 SPACE PARKING GARAGE AND OCCUPIABLE ROOF DECK UPON | $19,235,000 |
| 101068175 | 2025-08-19 | Plumbing | 705 W CHICAGO AVE | DDS 2019 CBC: CORE AND SHELL PERMIT FOR THE NEW CONSTRUCTION OF A 7-STORY CASINO, PARKING, AND EVENT CENTER BUILDING AND 34-STORY HOTEL TOWER. CAISSONS AND PILES ONLY PERMITTED UND | $396,200,000 |
| 101071912 | 2025-07-31 | Plumbing | 920 E 58TH ST | SELF-CERT 2019 CBRC: REVISION TO PERMIT 101060473 TO RECONFIGURE OFFICE SPACES, LAB SUPPORT SPACES AND ASSOCIATED MEP WORK (OCCUPANCY GROUP B; TYPE I-A CONSTRUCTION). | $70,000 |
| 101067483 | 2025-07-17 | Plumbing | 5224 W CHICAGO AVE | *DIRECT DEVELOPER SERVICES* REVISION TO PERMIT 100986472 TO SHIFT BUILDING LOCATION 2 FEET SOUTH AND OTHER ASSOCIATED REVISIONS, AS PER PLANS.CONSULTANT REVIEWER: V3 COMPANIES OF I | $1 |
| 101068638 | 2025-07-11 | Plumbing | 111 W ILLINOIS ST | DIRECT DEVELOPER SERVICES 2019 CBRC INTERIOR AND EXTERIOR ALTERATIONS TO CONVERT FLOORS 5- 10 OF EXISTING 10 STORY OFFICE BUILDING TO RESIDENTIAL USE WITH 103 DWELLING UNITS AND 50 | $25,000,000 |
| 101069596 | 2025-06-10 | Plumbing | 920 E 58TH ST | SELF-CERT 2019 CBRC: REVISION TO PERMIT 101060473 TO RECONFIGURE LAB SPACES AND ASSOCIATED MEP WORK (OCCUPANCY GROUP B; TYPE I-A CONSTRUCTION). | $600,000 |
| 101064733 | 2025-05-30 | Plumbing | 705 W CHICAGO AVE | DDS 2019 CBC: EX/ERS, GRADE BEAMS, SLAB ON GRADE, TOWER CORE SUBSTRUCTURE AND DEEP ELEVATOR PIT WITH STRIP FOOTINGS FOR THE NEW CONSTRUCTION OF A PROPOSED MIXED USE BUILDING INCLUD | $13,796,000 |
| 101064622 | 2025-04-16 | Plumbing | 750 N STATE ST | DDS 2019 CBC: REVISION TO PERMIT 101048752 TO INCLUDE BATHROOM LAYOUT ADJUSTMENTS AND FLIPPING THE LAYOUT OF THE LAUNDRY ROOM AND STORAGE ROOM. (OCCUPANCY GROUP R-1, TYPE IA CONSTR | $2,500,000 |
| B200405501 | 2024-11-22 | Plumbing | 5224 W CHICAGO AVE | FOR PERMIT 100986472: REPLACEMENT ELECTRICAL CONTRACTOR. REPLACEMENT PLUMBING CONTRACTOR. REPLACEMENT OTHER CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONT | |
| 101060473 | 2024-10-09 | Plumbing | 920 E 58TH ST | SELF-CERT 2019 CBRC: ALTERATIONS OF RESEARCH LABS ON FLOORS 6 AND 7 AND PARTIAL ALTERATION FOR NEW AHU IN BASEMENT IN AN 11 STORY UNIVERSITY BUILDING (OCCUPANCY GROUP B; TYPE I-A C | $13,000,000 |
| 101048752 | 2024-09-19 | Plumbing | 750 N STATE ST | DDS 2019 CBC: INITIAL TENANT BUILDOUT OF 10,009 SQ FT UNFINISHED CORE AND SHELL OFFICE TENANT SPACE ON EXISTING 5TH FLOOR WITH A CHANGE OF USE TO R-1 HOTEL. THE PROJECT WILL INCLUD | $2,500,000 |
| 101010520 | 2023-08-09 | Plumbing | 3026 N ASHLAND AVE | SELF CERT. COMM. - 2019 CBRC - ALTERATIONS TO EXISTING INDOOR SWIMMING POOL FACILITY PER ATTACHED PLANS. OCCUPANCY TYPE EXISTING AND PROPOSED - A3 INDOOR SWIMMING POOL; CONSTRUCTI | $270,000 |
| 100996702 | 2022-11-16 | Plumbing | 1134 S WOOD ST | REVISION TO PERMITS # 100928385 (MAIN) AND 100924570 (CAISSONS) TO CHANGE GC TO MCSHANE ASHLAUR JOINT VENTURE AND PLUMBER TO CORPORATE PLUMBING, FOR CAISSONS ONLY GC IS NECESSARY | $1 |
| 100990542 | 2022-09-29 | Plumbing | 5433 N WINTHROP AVE | REPAIR/REPLACE 5' OF CAST IRON PIPING AT BASEMENT AT POINT IDENTIFIED IN THE FIELD AND REPAIR UNDERGROUND PIPING AT BASE OF 3 SANITARY STACKS. | $59,702 |
| 100990559 | 2022-09-29 | Plumbing | 5101 N KENMORE AVE | 1020-1022 W. WINONA/5101 N. KENMORE:REPLACE 5' OF CAST IRON UNDERGROUND PIPE - NO OTHER WORK | $6,000 |
| 100990543 | 2022-09-29 | Plumbing | 5230 N WINTHROP AVE | REPAIR CAST IRON PIPING AT BASE OF SANITARY STACKS AS IDENTIFIED. | $45,113 |
| 100990550 | 2022-09-29 | Plumbing | 5440 N KENMORE AVE | REPAIR/REPLACE 15' OF BROKEN UNDERGROUND SANITARY CAST IRON SOIL PIPES INDENTIFIED IN THE FIELD AND REPAIR CAST IRON PIPING AT BASE OF SANITARY AS INDENTIFIED, REMOVE OLD SEWER ROD | $88,881 |
| 100990556 | 2022-09-29 | Plumbing | 1044 W WINONA ST | REPAIR /REPLACE 25' APPROX. OF UNDERGROUND CAST IRON SOIL PIPE AT SAME LOCATION. SUBJECT TO FIELD INSPECTION. NO OTHER WORK UNDER THIS PERMIT. | $99,673 |
| 100990555 | 2022-09-29 | Plumbing | 5110 N KENMORE AVE | REPAIR/REPLACE APPROXIMATELY 35' OF UNDERGROUND SANITARY CAST IRON SOIL PIPE AT LOCATIONS IDENTIFIED IN THE FIELD,FROM UNDERGROUND INSIDE START OF MAIN BUILDING DRAIN UP TO 5FT OUT | $117,753 |
| 100990551 | 2022-09-29 | Plumbing | 5439 N KENMORE AVE | REPAIR/REPLACE BROKEN UNDERGROUND SANIARY CAST IRON SOIL PIPE AT BASE OF SANITARY STACK. | $7,847 |
| 100990552 | 2022-09-29 | Plumbing | 5340 N KENMORE AVE | 5340-48 N KENMORE:REPAIR BROKEN UNDERGROUND SANITARY SEWER IN BASEMENT AS NEEDED. | $39,234 |
| 100990553 | 2022-09-29 | Plumbing | 5220 N KENMORE AVE | REPAIR/REPLACE UNDERGROUND SANITARY CAST IRON SOIL PIPE AT ELEVATOR LOBBY.REPAIR OR REPLACE UNDERGROUND PIPE IN LOBBY ONLY. | $15,695 |
| 100968797 | 2022-09-27 | Plumbing | 4121 S PACKERS AVE | SPR 2019 CBC: REVISION TO PERMIT #100908647. ELECTRICAL, PLUMBING, AND VENTILATION FOR PROCESS EQUIPMENT - NO SUSPENDED EQUIPMENT, NO NEW FOUNDATIONS. NEW PARTITION WALL. VALUE ENG | $2,000,000 |
| 100977792 | 2022-06-30 | Plumbing | 400 E RANDOLPH ST | SELF-CERT - BUILD-OUT OF AN EXISTING OFFICE SPACE, APPROXIMATELY 3,800 S.F. ON THE 7TH FLOOR OF AN EXISTING HIGH-RISE AT 400 EAST RANDOLPH STREET. NO CHANGE IN OCCUPANCY TYPE. | $600,000 |
| 100908647 | 2022-04-01 | Plumbing | 4121 S PACKERS AVE | CURRENT/PROPOSED USE = RECYCLING FACILITY. CURRENT/PROPOSED OCCUPANCY = BUSINESS/INDUS. MOD. HAZARD. CONTINUATION OF PERMIT APPLICATION #100578720. PMD-8 - ERECT ONE STORY, TYPE II | $2,000,000 |
| 100955173 | 2022-01-13 | Plumbing | 170 W OAK ST | REPAIR AND REPLACE UNDERGROUND PIPING FROM GREASE TRAP IN MAIN LOBBY | $26,800 |
| 100923216 | 2021-09-14 | Plumbing | 1800 W FULTON ST | 2019 CBCR STANDARD PLAN: INTERIOR ALTERATIONS TO EXISTING BUILDING FOR BREWERY PH NEUTRALIZATION PROJECT. NO CHANGE IN USE. BUSINESS | $500,000 |
| 100935811 | 2021-08-17 | Plumbing | 5225 N KENMORE AVE | PLUMBING REPAIR OF 5' OF 6'' CAST IRON SOIL PIPE KITCHEN GREASE LINE WITH A FULL SIZE CLEAN OUT INSTALLED. SUBJECT TO FIELD INSPECTION. | $25,610 |
| 100918361 | 2021-04-19 | Plumbing | 5423 N KENMORE AVE | EMERGENCY REPAIR OF COLLAPSED UNDERGROUND GREASE WASTE LINE IN INTERIOR BUILDING. | $14,700 |
| 100874603 | 2021-01-25 | Plumbing | 400 E RANDOLPH ST | THIS RENOVATION PROJECT PERTAINS TO THE EAST AND WEST WINGS OF THE 7TH FLOOR OF A 40 STORY HIGH-RISE RESIDENTIAL BUILDING. THE CURRENT USE AND PROPOSED USE OF THE SPACES IMPACTED A | $5,500,000 |
| 100835909 | 2020-07-20 | Plumbing | 949 W DAKIN ST | (DIRECT DEVELOPER SERVICES) NEW CONSTRUCTION OF A 7-STORY RESIDENTIAL BUILDING (120 UNITS) WITH BASEMENT, TO INCLUDE GROUND FLOOR PARKING (14 SPACES), RETAIL AND ASSOCIATED SITE WO | $26,000,000 |
| 100875399 | 2020-05-26 | Plumbing | 146 W ERIE ST | REVISION TO PERMIT# 100688266 CHANGE CONCRETE MASON TO PEPPER CONSTRUCTION COMPANY | $4,000,000 |
| 100874744 | 2020-05-19 | Plumbing | 146 W ERIE ST | REVISION TO PERMIT# 100836431 CHANGE MASON CONTRACTOR TO PEPPER CONSTRUCTION | $18,000,000 |
| 100836431 | 2020-05-01 | Plumbing | 146 W ERIE ST | DIR. DEV. SERV. - NEW CONSTRUCTION : PERMIT APPLICATION FOR FOURTH FLOOR THROUGH FOURTEENTH LEVEL (PHASE II). A FOURTEEN STORY RESIDENTIAL BUILDING WITH 31 RESI. UNITS (4TH - 14TH | $18,000,000 |
| 100868839 | 2020-04-02 | Plumbing | 146 W ERIE ST | REVISION TO PERMIT NO. 100865922; CHANGING PLUMBING CONTRACTOR TO CORPORATE PLUMBING; CHANGING MASON CONTRACTOR TO MASTERSHIP CONSTRUCTION COMPANY INC., CHANGING REFRIG/VENT CONTRA | $4,000,000 |
| 100826145 | 2019-10-15 | Plumbing | 6149 N BROADWAY | ***DIRECT DEVELOPER SERVICES*** REVISION TO PERMIT NUMBER 100749180; REVISIONS TO MECHANICAL, ELECTRICAL AND PLUMBING THROUGHOUT BUILDING; ALL AS PER PLANS | $250,000 |
| 100787762 | 2018-12-20 | Plumbing | 4710 S GREENWOOD AVE | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $540,984 |
| 100787763 | 2018-12-20 | Plumbing | 1101 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $540,984 |
| 100787768 | 2018-12-20 | Plumbing | 1151 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHE | $540,984 |
| 100787761 | 2018-12-20 | Plumbing | 4700 S GREENWOOD AVE | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $540,984 |
| 100787766 | 2018-12-20 | Plumbing | 1125 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHE | $1,081,197 |
| 100787767 | 2018-12-20 | Plumbing | 1135 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $721,311 |
| 100787765 | 2018-12-20 | Plumbing | 1111 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $721,311 |
| 100787760 | 2018-12-20 | Plumbing | 1053 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHE | $360,656 |
| 100787759 | 2018-12-20 | Plumbing | 1037 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $1,442,623 |
| 100787758 | 2018-12-20 | Plumbing | 1027 E 47TH ST | ISSUED VIA PROTOTYPE - 100787754 - 4701 S ELLIS ISSUED 12/19/2018 RENOVATION OF 15 ( 2 AND 3 STORY) RESIDENTIAL BRICK BUILDINGS. SCOPE OF WORK IS LIMITED TO COSMETIC WORK, KITCHEN | $1,081,197 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
