COMPANY RECORD · BOULDER, CO

Saunders Construction Inc — permit history in Boulder, CO

Saunders Construction Inc appears on 47 Boulder permit records from 2015 through 2026, most often general construction (66% of the record).

Permit categories

CategoryPermitsShare
General construction3166%
Electrical510.6%
Plumbing48.5%
Mechanical / HVAC48.5%
Demolition24.3%
Fire protection12.1%

6 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20155
20169
20174
20181
20194
20202
20214
20223
20232
20245
20257
20261

Busiest year on record: 2016, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1155 ALPINE AVE2026-06-09
2655 BROADWAY2025-12-30
1155 ALPINE AVE 2052025-09-22
1048 PEARL ST2025-08-22
1055 ALPINE AVE2025-08-19
6036 LONGBOW CT2024-10-30
6048 LONGBOW CT2024-04-11
2930 PEARL ST2022-10-31
2400 CENTRAL AVE2022-03-29
2300 CENTRAL AVE2022-03-29
2590 PEARL ST2021-09-20
4740 PEARL PKWY2021-04-29
311 MAPLETON AVE2021-03-10
2505 4TH ST2019-10-21

17 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $78,753,472, median $344,006. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

47 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-005102026-06-09Electrical1155 ALPINE AVENew roof-mounted commercial photovoltaic solar installation including modules, racking, inverters, PV production meter, utility AC disconnect, associated wiring, grounding, placard$130,000
BLD-NRE2025-000762025-12-30General construction2655 BROADWAY**3/23/26 Revisions to architectural, civil and structural to address ongoing design and construction coordination. See the Architectural Supplemental Information for all changes.$11,765,366
BLD-NRE2025-000742025-09-26General construction2655 BROADWAYDEMOLITION PORTION ONLY. NO OCCUPANCY ALLOWED AT THE COMPLETION OF THIS SCOPE: THE PROJECT INCLUDES THE DEMOLITION OF THE EXISTING 1ST FLOOR BRICK AND GLASS WRAP ON THE NORTH AND $391,344
CTR2025-000062025-09-22General construction1155 ALPINE AVE 205Bergelectric's Connex$0
BLD-NRE2025-000832025-08-22General construction1048 PEARL STProject consists of the subdivision of an existing second floor unit into two separate units via a new demising wall and formation of shared egress corridor. New demising wall and $150,000
CTR2025-000052025-08-19General construction1055 ALPINE AVEConstruction trailer (12' x 60') in south west corner of property for Boulder Western City Campus Construction Site$0
BLD-NRE2025-000592025-08-13General construction1155 ALPINE AVEThe Pavilion building is made up of the existing Medical Office building and the addition of mass timber for a total area of 117,600sf. The building will house community amenities $78,753,472
CTR2025-000032025-04-18General construction1155 ALPINE AVEConstruction Trailer (35'x60') located in Northwest corner of Project site for Saunders Construction.$0
BLD-ACC2024-000832024-10-30General construction6036 LONGBOW CTNEW ACCESSORY STRUCTURE: NEW CONCRETE PAD AND ENCLOSURE TO HOUSE EMERGENCY GENERATOR$120,000
BLD-NRE2023-001732024-04-18General construction6036 LONGBOW CTINTERIOR RENOVATION OF LEVELS 2 & 3 IN AN EXISTING 3-STORY OFFICE BUILDING; SCOPE INCLUDES: -DEMOLITION OF PARTITION WALLS AND CEILINGS AT TENANT SUITES -AT CORRIDORS: NEW FINISHES$416,965
BLD-ACC2023-000682024-04-11General construction6036 LONGBOW CTTHREE NEW EXTERIOR FREE-STANDING CANOPIES (STEEL STRUCTURE WITH DECORATIVE ROPE INFILL), AT LANDSCAPED AREA ADJACENT TO BUILDING; TOTAL AREA: 239 SF$50,000
BLD-ACC2023-000672024-04-11General construction6048 LONGBOW CTFOUR NEW EXTERIOR FREE-STANDING CANOPIES (STEEL STRUCTURE WITH DECORATIVE ROPE INFILL), AT LANDSCAPED AREA ADJACENT TO BUILDING; TOTAL AREA: 352 SF$65,000
BLD-NRE2023-000642024-01-09General construction6036 LONGBOW CTRenovations to three levels of an office building. AT LEVEL 1: -DEMOLITION OF PARTITION WALLS. -MODIFICATION OF STRUCTURAL DIAGONAL BRACE. -(4) NEW WINDOWS TO REPLACE EXISTING AT F$2,636,340
CTR2023-000102023-12-19General construction6036 LONGBOW CTSales trailer (48' x 10') in the west parking lot of the property in front of Bldgs 1 and 5 for the SteelWave sales team.$0
BLD-NRE2023-000912023-12-13General construction6036 LONGBOW CTInterior renovation of existing 3-story building lobby including the addition of a new elevator. No new square footage is being added to the building.$450,000
BLD-ACC2022-000762022-10-31General construction2930 PEARL STRemove Bocce court and clear, level and grub site. Concrete base and small caissons to support a steel TRX structure and rubberized safety surfacing.$481,920
BLD-NRE2021-002112022-03-29General construction2400 CENTRAL AVENew core and shell for an office building to replace the existing building at 2400 and 2450 Central Ave. Associated with LUR2020-00008, TEC2020-00032, TEC2020-00035, TEC2020-00036,$31,394,344
BLD-NRE2021-002122022-03-29General construction2300 CENTRAL AVETHROUGH AN APPROVED SITE REVIEW AND TEC DOC PROCESS (FOR BOTH 2300 CENTRAL AND 2400 CENTRAL - TEC2020-00032), THE SCOPE OF WORK INCLUDES THE RENOVATION OF EXISTING BUILDING (34,084$10,300,000
BLD-NRE2021-001072021-09-20General construction2590 PEARL STInstallation of new overhead garage doors at the bottom of the existing garage entry ramp for security purposes.$85,000
BLD-NRE2021-000092021-04-29General construction4740 PEARL PKWYINTERIOR TENANT FINISH RENOVATIONS TO PARTIAL SECOND AND THIRD FLOORS OF BOULDER CENTRE FOR ORTHOPEDICS AND SPINE, LOCATED AT 4740 PEARL PARKWAY, BOULDER, CO. RENOVATIONS INCLUDE: $1,222,500
CTR2021-000032021-03-10General construction311 MAPLETON AVE*Voided due to no inspections in 180 days* Construction trailer for 311 Mapleton development.$0
BLD-NRE2019-001982021-02-09General construction1048 PEARL STImprovements to the core and shell conditions of a below grade interior space, originally intended as a theater, to be fitted out under future tenant interior finish as office spac$1,343,900
BLD-NRE2020-000742020-06-10General construction2930 PEARL STFirst time tenant finish for an exhibit gallery in an unfinished core and shell suite. Scope of project includes installation of MEP systems, (2) restrooms, new track lighting, int$400,000
BLD-NRE2019-002912020-02-14General construction2930 PEARL STTenant remodel of gym/recreation space in existing Google office building$162,044
DEM2019-001042019-12-26Demolition2930 PEARL STInterior non-structural demolition of an existing climbing wall associated with the tenant remodel permit (BLD-NRE2019-00291) for the gym/rec space for the Google office building.$0
CTR2019-000062019-10-21General construction2505 4TH STPermit for the installation of a construction trailer for the Academy on Mapleton Hill. Electrical by separate permit ELE2019-01601.$0
BLD-NRE2019-000102019-03-22General construction2755 CANYON BLVDFirst time tenant finish for office space on floors 1, 2, and 3 of an existing building. Includes MEP.$2,811,050
BLD-NRE2018-000912019-03-07General construction2930 PEARL STTenant finish following core and shell (through PMT2017-05600) for new 4-story office building with single tenant. Scope includes finishes, climbing wall, food service areas, and f$16,000,000
PMT2018-009542018-04-11General construction2930 PEARL ST.* Permit for layout of soldier beams only (no tie backs) for the excavation for foundation and parking for Google Phase Two. Associated with PMT2017-05602 for the full shoring sc$0
PMT2016-041842017-02-02General construction2930 PEARL STInterior tenant finish of floors 1, 3, and 4 of buildings A and B (interconnected), with limited scope of work on level 2, as office space and internal work campus that includes gy$22,000,000
PMT2016-04184-ELE2017-02-02Electrical2930 PEARL STInterior tenant finish of floors 1, 3, and 4 of buildings A and B (interconnected), with limited scope of work on level 2, as office space and internal work campus that includes gy$5,600,000
PMT2016-04184-PLB2017-02-02Plumbing2930 PEARL STInterior tenant finish of floors 1, 3, and 4 of buildings A and B (interconnected), with limited scope of work on level 2, as office space and internal work campus that includes gy$1,600,000
PMT2016-04184-MEC2017-02-02Mechanical / HVAC2930 PEARL STInterior tenant finish of floors 1, 3, and 4 of buildings A and B (interconnected), with limited scope of work on level 2, as office space and internal work campus that includes gy$3,200,000
PMT2015-04868-PLB2016-04-04Plumbing4910 NAUTILUS CTCellar Three addition to existing brewing facility, consisting of a one story concrete structure and 10 tanks.$100,000
PMT2015-04868-MEC2016-04-04Mechanical / HVAC4910 NAUTILUS CTCellar Three addition to existing brewing facility, consisting of a one story concrete structure and 10 tanks.$45,000
PMT2015-048682016-04-04General construction4910 NAUTILUS CTCellar Three addition to existing brewing facility, consisting of a one story concrete structure and 10 tanks.$1,500,000
PMT2015-04868-ELE2016-04-04Electrical4910 NAUTILUS CTCellar Three addition to existing brewing facility, consisting of a one story concrete structure and 10 tanks.$35,000
PMT2015-047962016-04-01General construction2930 PEARL STCore and shell permit for Pearl Place office development. Development to include three four story office buildings interconnected on the third and fourth floors, with three levels$48,534,045
PMT2015-04796-ELE2016-04-01Electrical2930 PEARL STCore and shell permit for Pearl Place office development. Development to include three four story office buildings interconnected on the third and fourth floors, with three levels$2,182,628
PMT2015-04796-PLB2016-04-01Plumbing2930 PEARL STCore and shell permit for Pearl Place office development. Development to include three four story office buildings interconnected on the third and fourth floors, with three levels$1,597,386
PMT2015-04796-FIR2016-04-01Fire protection2930 PEARL STCore and shell permit for Pearl Place office development. Development to include three four story office buildings interconnected on the third and fourth floors, with three levels$0
PMT2015-04796-MEC2016-04-01Mechanical / HVAC2930 PEARL STCore and shell permit for Pearl Place office development. Development to include three four story office buildings interconnected on the third and fourth floors, with three levels$4,792,158
PMT2015-01777-MEC2015-06-29Mechanical / HVAC1275 ALPINE AVIDEAL MARKET/WHOLE FOODS-Tenant remodel of existing grocery store. No work to exterior of building. -- Appraised structure value $1,095,000 $14,805
PMT2015-01777-ELE2015-06-29Electrical1275 ALPINE AVIDEAL MARKET/WHOLE FOODS-Tenant remodel of existing grocery store. No work to exterior of building. -- Appraised structure value $1,095,000 $95,630
PMT2015-01777-PLB2015-06-29Plumbing1275 ALPINE AVIDEAL MARKET/WHOLE FOODS-Tenant remodel of existing grocery store. No work to exterior of building. -- Appraised structure value $1,095,000 $9,893
PMT2015-017772015-06-29General construction1275 ALPINE AVIDEAL MARKET/WHOLE FOODS-Tenant remodel of existing grocery store. No work to exterior of building. -- Appraised structure value $1,095,000 $344,006
PMT2015-02287-DEM2015-06-11Demolition1275 ALPINE AVInterior, non-structural demolition associated with work scoped under case number PMT2015-01777$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →