COMPANY RECORD · BOULDER, CO

Greiner Electric LLC — permit history in Boulder, CO

Greiner Electric LLC appears on 29 Boulder permit records from 2015 through 2026, most often electrical (75.9% of the record).

Permit categories

CategoryPermitsShare
Electrical2275.9%
Fire protection517.2%
Mechanical / HVAC26.9%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20151
20184
20195
20203
20221
20239
20244
20262

Busiest year on record: 2023, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2930 PEARL ST2026-02-20
1880 55TH ST2026-01-07
1600 COMMERCE ST2024-10-11
1727 6TH ST2024-07-01
1729 ATHENS ST2024-06-04
1380 55TH ST2023-12-22
5525 CENTRAL AVE2023-10-13
3200 E EUCLID AVE2023-10-05
785 35TH ST2023-08-21
2291 31ST ST2023-07-25
2273 31ST ST2023-05-22
180 S 31ST ST2023-03-29
2300 CENTRAL AVE2023-03-16
1688 CONESTOGA ST2022-07-26

21 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $224,805, median $12,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

29 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-000772026-02-20Electrical2930 PEARL STInstall 22 New Dual Head Car Chargers in the Google Parking Garage$185,000
ELE2025-013622026-01-07Electrical1880 55TH ST**REVISION-Revised Electrical plans per inspectors' notes. Install new 400-amp electrical panel, Meter and Disconnect, Install branch circuits$47,000
ELE2024-009482024-11-06Electrical1880 55TH STInstall power for MAU and exhaust fan from existing panel P5. Associated with MEC2024-01578.$7,200
FIR2024-004132024-10-11Fire protection1600 COMMERCE STProvide for the addition of existing FCI Fire Alarm system in 1st floor areas for new AV Devices and provide accomodations for a NAC power supply for new horn and strobe circuits a$33,276
MEC2024-008922024-07-01Mechanical / HVAC1727 6TH ST*Voided for inactivity - no inspections within 180 days.* Remove and replace like for like tankless water heater.$6,289
ELE2024-004392024-06-04Electrical1729 ATHENS ST*Voided for inactivity - no inspections for 180 days* Temporary electrical service for construction trailers and construction power. A Temporary generator will be provided until X$35,000
ELE2023-012042023-12-22Electrical1380 55TH ST***VOIDED DUE TO INACTIVITY OVER 180 DAYS*** Hook up power for chemical station. Fire Station #7.$2,450
FIR2023-004422023-11-21Fire protection1600 COMMERCE STAdd one smoke detector above the existing FACP. Add new graphic map. Add one new strobe. Remove and replace one smoke detector and one horn/strobe. See BLD-NRE2023-00079 for genera$6,500
FIR2023-003892023-10-13Fire protection5525 CENTRAL AVENew Fire Alarm System to include elevator recall, sprinkler monitoring, FSD control, spot smoke detection, full area notification, and rescue assistance. See BLD-NRE2023-00013 for $42,000
ELE2023-010142023-10-05Electrical3200 E EUCLID AVEreplace panel$7,000
ELE2023-008492023-08-21Electrical785 35TH ST*Voided for inactivity - no inspections within 180 days* Install 240 volt 50 amp circuit for mini-split system and install 240 volt 50 amp circuit for range$2,500
ELE2023-004882023-07-25Electrical2291 31ST ST66.93kW rooftop PV array$214,000
ELE2023-004912023-05-22Electrical2273 31ST ST59.17kW rooftop solar pv array$182,000
ELE2023-002962023-03-29Electrical180 S 31ST STReplacement of existing meter box with new combination 200A/250V meter/main disconnect/main panel unit$2,500
ELE2023-001782023-03-16Electrical2300 CENTRAL AVE33.95kW ballasted rooftop PV array. Hanwha modules, Tigo optimizers and Solectria inverters.$85,000
ELE2022-007062022-07-26Electrical1688 CONESTOGA STScope of work includes adjustments to interior office space layout requiring some structural improvements to support racks mounted to deck above; modification of mechanical exhaust$165,000
FIR2020-002362020-07-07Fire protection2930 PEARL STNetwork the fire alarm systems for buildings A, B and C. GOOGLE$3,000
ELE2020-002152020-03-05Electrical2821 20TH ST**Voided for inactivity due to no inspections performed within 180 days of issuance***Electrical for AC. MEC2020-00152$500
MEC2020-001522020-02-20Mechanical / HVAC2821 20TH ST*Voided for inactivity - requirements not received within 180 days* *Remove existing gas furnace. Install new air handler with electric resistance heat. Modify and improve duct$28,430
ELE2019-015842019-12-16Electrical2930 PEARL STElectrical permit for a non-life safety emergency back-up generator for Google. Generator to be located in existing mechanical room. Associated with MEC2019-01727.$150,779
ELE2019-012052019-10-09Electrical2930 PEARL ST*60.13kW Roof mounted PV array on the Google Phase 2 new build project. Ballasted racking on flat roof. SunPower 370 modules, SMA inverters, and SMA module level shutdown.$148,000
ELE2019-013002019-09-27Electrical1881 9TH STInstallation of four electric car charging stations in parking garage$12,000
ELE2019-006982019-08-05Electrical2545 CENTRAL AVEAddition of a 200 AMP electrical panel to an existing service. Adding a new circuit for future split system (to be covered under separate permit).$9,582
FIR2019-000112019-05-31Fire protection2930 PEARL STFire alarm system for core & shell plus tenant. See PMT2017-05600 for general building permit. GOOGLE Phase II$224,805
ELE2018-008522018-09-14Electrical4755 WALNUT STInstallation of eight (8) replacement RUTs, natural gas, 80% efficiency. No structural modifications under this scope of work. Associated electrical work under ELE2018-00852.$4,200
ELE2018-005382018-07-12Electrical954 PEARL STTemporary generator on Pearl St for Pasta Jay's 30th block party anniversary event.$0
ELE2018-002452018-06-13Electrical2601 CANYON BLVD8 Tesla electric car charging stations in parking garage. .$17,000
PMT2018-00328-ELE2018-01-30Electrical2930 PEARL ST*Voided for inactivity - no inspections within 180 days* Temporary construction power for 2930 Pearl St., over 400 Amp service.$0
PMT2015-04575-ELE2015-10-14Electrical1473 PATTON DRInstallation of electric vehicle outlet, wire and outlet only.$792

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →