COMPANY RECORD · BOULDER, CO
Mac Electric Company — permit history in Boulder, CO
Mac Electric Company appears on 52 Boulder permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 52 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 1 |
| 2016 | 3 |
| 2017 | 3 |
| 2019 | 1 |
| 2020 | 11 |
| 2021 | 17 |
| 2022 | 2 |
| 2023 | 8 |
| 2024 | 2 |
| 2025 | 3 |
| 2026 | 1 |
Busiest year on record: 2021, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 943 10TH ST | 2026-07-14 |
| 2685 WINDING TRAIL DR | 2025-11-12 |
| 861 CYPRESS DR | 2025-08-25 |
| 525 ITHACA DR | 2025-02-19 |
| 698 WALDEN CIR | 2024-10-18 |
| 5550 AIRPORT BLVD | 2024-09-13 |
| 2890 JUILLIARD ST | 2023-12-05 |
| 940 SYCAMORE AVE | 2023-07-25 |
| 3681 PAONIA ST | 2023-06-22 |
| 872 TIMBER LN | 2023-05-10 |
| 4580 BROADWAY 229 | 2023-05-01 |
| 4375 LUDLOW ST | 2023-02-16 |
| 204 28TH ST | 2023-02-10 |
| 708 ITHACA DR | 2023-01-20 |
50 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $580 to $199,294, median $6,861. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
52 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| ELE2026-00656 | 2026-07-14 | Electrical | 943 10TH ST | Install 60a 240v circuit for EV wall charger in garage fed from panel in garage to include: - 3/4 EMT surface mount conduit - #6 THHN copper conductors - 60a 2 pole breaker - tande | $1,027 |
| ELE2025-01178 | 2025-11-12 | Electrical | 2685 WINDING TRAIL DR | Install 60a 240v circuit for EV car charging in garage fed from panel in basement to include: - 3/4 EMT surface mount conduit - #6 THHN copper conductors - 60a 2 pole breaker - EV | $12,350 |
| ELE2025-00761 | 2025-08-25 | Electrical | 861 CYPRESS DR | Install 60a 240v circuit for EV car charging in garage fed from subpanel in garage to include: - 3/4 EMT surface mount conduit - #6 THHN copper conductors - 60a 2 pole breaker - re | $915 |
| ELE2025-00066 | 2025-02-19 | Electrical | 525 ITHACA DR | Install 60a 240v circuit for EV car charging in garage fed from panel in garage to include: - 3/4 EMT surface mount conduit - #6 THHN copper conductors - 60a 2 pole breaker - EV wa | $865 |
| ELE2024-00749 | 2024-10-18 | Electrical | 698 WALDEN CIR | Replace site lighting one for one with new LED energy efficient technology per the attached plans. | $36,044 |
| ELE2024-00711 | 2024-09-13 | Electrical | 5550 AIRPORT BLVD | Lighting control installation throughout the site to comply with the BPO standards and the 2017 City of Boulder Energy Conservation Code (COBECC). | $199,294 |
| ELE2023-01236 | 2023-12-05 | Electrical | 2890 JUILLIARD ST | Install 50a 240v circuit and receptacle for EV car charging on right wall of garage fed from main panel in rear of home to include: - 3/4 EMT surface mount conduit around home then | $2,227 |
| ELE2023-00639 | 2023-07-25 | Electrical | 940 SYCAMORE AVE | Install electrical circuit for EV charger | $1,751 |
| ELE2023-00619 | 2023-06-22 | Electrical | 3681 PAONIA ST | Install electrical circuit for EV charger | $2,540 |
| ELE2023-00482 | 2023-05-10 | Electrical | 872 TIMBER LN | Install electrical circuit for EV charger. Permit voided because the property is outside of the city. | $961 |
| ELE2023-00439 | 2023-05-01 | Electrical | 4580 BROADWAY 229 | *Voided for inactivity - no inspections within 180 days* Install 50a 240v circuit and receptacle for EV car charging cord on wall of garage fed from exterior panel | $1,461 |
| ELE2023-00134 | 2023-02-16 | Electrical | 4375 LUDLOW ST | Install 50a 240v circuit and receptacle for EV car charging cord on exterior wall of garage fed from panel in rear of home to include: - 3/4 EMT surface mount conduit - #6 THHN cop | $1,745 |
| ELE2023-00120 | 2023-02-10 | Electrical | 204 28TH ST | Install 50a 240v circuit and receptacle for EV car charging cords on _left wall of garage fed from panel in _ to include: - 3/4 EMT surface mount conduit - #6 THHN copper conductor | $1,535 |
| ELE2023-00050 | 2023-01-20 | Electrical | 708 ITHACA DR | Install 50a 240v circuit for hardwired Charge Point EV charger on back wall (left of center) of garage fed from exterior panel to include: - 3/4 EMT surface mount conduit - #6 THHN | $1,249 |
| ELE2022-00478 | 2022-03-30 | Electrical | 3395 30TH ST | Install (2) 50 amp Blink EV chargers per the attached stamped drawings | $19,709 |
| ELE2022-00085 | 2022-02-03 | Electrical | 1909 26TH ST | Install exterior lighting per attached lighting plan and specification sheets | $10,362 |
| ELE2021-01891 | 2021-12-09 | Electrical | 2800 WILDERNESS PL | Exterior lighting upgrade to conform with Boulder Dark Sky and Performance Ordinances | $13,609 |
| ELE2021-01881 | 2021-12-09 | Electrical | 6560 ODELL PL | Exterior lighting upgrade to conform with Boulder Dark Sky Ordinance and BPO Ordinance | $7,399 |
| ELE2021-01880 | 2021-12-08 | Electrical | 2840 WILDERNESS PL | *Voided for inactivity - no inspections within 180 days* Exterior lighting upgrade to conform with Boulder Dark Sky Ordinance and BPO Ordinance. | $7,710 |
| ELE2021-01784 | 2021-11-10 | Electrical | 2890 ARAPAHOE AVE | Update exterior lighting per the attached to meet Boulder ordnances. | $2,322 |
| ELE2021-01785 | 2021-11-10 | Electrical | 2830 ARAPAHOE AVE | Update exterior lighting per the attached to meet Boulder ordinances. | $2,881 |
| ELE2021-01786 | 2021-11-10 | Electrical | 2860 ARAPAHOE AVE | Update exterior lighting per the attached to meet Boulder ordinances. | $9,682 |
| ELE2021-01664 | 2021-11-08 | Electrical | 1799 EXPOSITION DR | Upgrade exterior lighting to meet Boulder dark sky code per the attached proposal and lighting plan | $16,406 |
| ELE2021-01722 | 2021-11-08 | Electrical | 2323 55TH ST | *VOIDED DUE TO INACTIVITY - NO INSPECTIONS IN OVER 180 DAYS* Update exterior lighting per the attached photometric design to conform with Boulder Outdoor ordinance and performance | $24,268 |
| ELE2021-01341 | 2021-09-07 | Electrical | 5405 SPINE RD | Upgrade exterior lighting to comply with Boulder exterior and BPO ordinances | $2,832 |
| ELE2021-00894 | 2021-06-10 | Electrical | 5755 CENTRAL AVE | Exterior lighting upgrade per the attached plans to meet the exterior lighting ordinance requirements | $18,945 |
| ELE2021-00829 | 2021-06-02 | Electrical | 2805 WILDERNESS PL | Upgrade exterior lighting to conform with Boulder Dark Sky Ordinance | $2,953 |
| ELE2021-00828 | 2021-06-02 | Electrical | 2825 WILDERNESS PL | Upgrade exterior lighting to conform with Boulder Dark Sky Ordinance | $7,284 |
| ELE2021-00431 | 2021-04-07 | Electrical | 3395 PENROSE PL | Replace (7) 400w metal halide pole lights with (5) new 78w LED area lights. | $4,441 |
| ELE2021-00065 | 2021-03-18 | Electrical | 4900 NAUTILUS CT N | Exterior lighting retrofit to conform with exterior Boulder Ordinance requirements.*Resubmittal 3/2/2021. | $4,696 |
| ELE2020-01755 | 2021-02-24 | Electrical | 3120 BROADWAY | *Exterior lighting upgrade. *Revision received 01/20/2021: Revised the lighting design to better conform with ordinance standards, changed the (3) wall packs from a 40w version dow | $14,838 |
| ELE2020-01732 | 2021-01-15 | Electrical | 1595 55TH ST | *Exterior lighting retrofit to conform with exterior Boulder Ordinance requirements. *RESUBMITTAL 12/30/2020: Fixture count under soffits of building reduced since a light loss fac | $14,086 |
| ELE2020-01647 | 2021-01-06 | Electrical | 4700 TABLE MESA DR | *New exterior LED lighting at South Creek Village. *Revisions received on 12/23/2020: NOTARIZED PERMISSION LETTERS ATTACHED VIA NEIGHBORING PROPERTIES WHERE F/C MEASUREMENTS EXCEED | $5,931 |
| ELE2020-01649 | 2020-12-17 | Electrical | 4716 TABLE MESA DR | *LED lighting upgrade to include LED luminaries, labor, recycling per EPA standards and disposal of existing lamps/fixtures. *Resubmittal received on 12/7: Original permit request | $5,218 |
| ELE2020-01422 | 2020-12-07 | Electrical | 4869 BROADWAY | *Provide the infrastructure (underground wiring) for the EV charger at Boulder Shelter. Just the power. Boulder Shelter is providing the charger. | $12,525 |
| ELE2020-01648 | 2020-11-24 | Electrical | 4708 TABLE MESA DR | *removing (3) lights on one pole and replacing with only 2 new lights | $1,471 |
| ELE2020-00790 | 2020-08-21 | Electrical | 3101 28TH ST | *Exterior LED lighting retrofit/upgrade to addresses 3101-3141 28th St. Includes lighting compliance for Zoning department. | $17,513 |
| ELE2020-01106 | 2020-08-21 | Electrical | 4869 BROADWAY | Need permit to retrofit (4) Pole lights to LED | $2,870 |
| ELE2020-00105 | 2020-05-28 | Electrical | 2017 13TH ST | *Replacing existing light fixtures with lower wattage compliant LED fixtures. Site Lighting Plan included for approval. | $2,515 |
| ELE2020-00118 | 2020-05-15 | Electrical | 2299 PEARL ST | *Replacing existing light fixtures with lower wattage compliant LED fixtures. Site Lighting Plan included for approval. | $17,000 |
| ELE2020-00339 | 2020-04-29 | Electrical | 1740 30TH ST | *Replacing existing light fixtures with lower wattage compliant LED fixtures. Site Lighting Plan included for approval. Note that MAC Best Buy file has specs in it. | $18,599 |
| ELE2020-00291 | 2020-04-17 | Electrical | 5480 VALMONT RD | *Replacing (14) existing light fixtures with lower wattage compliant LED fixtures. Site Lighting Plan included for approval. | $8,000 |
| ELE2019-01877 | 2020-02-19 | Electrical | 1800 30TH ST | *Install and replace 2 can lights and 14 LED wall packs on existing building, per attached specifications and photometric.**Resubmittal 1/9/2020 - site lighting plan for Outdoor Li | $7,400 |
| ELE2020-00070 | 2020-02-13 | Electrical | 1685 28TH ST | *Electrical permit for the relamping of existing poles and wall packs for 1685 28th Street to meet outdoor lighting compliance. Electronic files have been uploaded and hard copies | $18,166 |
| ELE2019-01246 | 2019-11-19 | Electrical | 4900 BROADWAY | *Replace (58) existing 70w MH wall packs with (58) new 15w RAB WPLED13Y LED wall packs and add (54) additional RAB WPLED13Y wall packs per the attached photo metric | $36,000 |
| PMT2017-00674-ELE | 2017-02-23 | Electrical | 3065 18TH ST | Electrical permit to install a new NEMA 14-50 receptacle for an EV home charging station, to be located inside the garage. | $580 |
| PMT2016-05716-ELE | 2017-02-09 | Electrical | 5757 ARAPAHOE AV | LED lighting retrofit - upgrading (12) light fixtures. | $6,438 |
| PMT2016-05387-ELE | 2017-01-12 | Electrical | 6525 GUNPARK DR | Permit for replacing pole top lighting for the Gunbarrel Square Shoping Center parking and exterior areas. | $9,793 |
| PMT2016-03495-ELE | 2016-11-18 | Electrical | 2285 28TH ST | One for one lamp retrofit to replace existing interior lighting with replacement LED lamps. No electrical wiring to be done. *** Permit is associated with PMT2016-03497 | $67,876 |
| PMT2016-03497-ELE | 2016-11-18 | Electrical | 2285 28TH ST | Replacement of 27 pole light fixtures and 28 recessed soffit lights (lamps only) to upgrade existing exterior lighting to LED. ***Permit is associated with PMT2016-03495 don't is | $19,190 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
