Exceed Electrical Contracting — permit history in Boulder, CO

Exceed Electrical Contracting appears on 67 Boulder permit records from 2017 through 2026, most often electrical (95.5% of the record).

Permit categories

CategoryPermitsShare
Electrical6495.5%
Mechanical / HVAC34.5%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20173
20181
20191
202349
20244
20256
20263

Busiest year on record: 2023, with 49 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2435 4TH ST2026-08-21
5505 AIRPORT BLVD2026-07-31
1031 PORTLAND PL2026-03-16
2300 CENTRAL AVE2025-10-13
1347 28TH ST2025-03-12
1349 28TH ST2025-03-12
1345 28TH ST2025-03-12
2425 55TH ST2025-03-10
4775 WALNUT ST2025-02-24
1047 13TH ST 42024-09-26
2601 CANYON BLVD2024-09-25
914 13TH ST2024-05-30
6930 WINCHESTER CIR2024-04-02
2227 CANYON BLVD 208A2023-10-06

67 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $520,811, median $2,116. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

67 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-008812026-08-21Electrical2435 4TH STAdding new EM panel with circuits for Dakota building$58,100
MEC2026-012122026-07-31Mechanical / HVAC5505 AIRPORT BLVDRemove and replace RTU (like for like replacement) **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning appliances $51,694
ELE2026-002722026-03-16Electrical1031 PORTLAND PLService inspection - Service Mast knocked over by tree, Xcel shut off power. Mast was stood back up but Xcel won't turn power on without inspection.$100
ELE2025-010022025-10-13Electrical2300 CENTRAL AVERunning power to owner provided equipment. Equipment will have a 50amp 3 phase 208 volt circuit ran to a safety disconnect. The disconnect will run load to owner provided equiment.$1,890
ELE2025-001892025-03-12Electrical1347 28TH ST***VOID 180 Days No Activity*** Temporary electrical permit for an 800-amp service to feed the future elevator panels, a 200-amp panel, and a 75kVA transformer for 1347 28th Street$0
ELE2025-001872025-03-12Electrical1349 28TH STTemporary Electrical Power Permit for Building #3 located at 1349 28th St. 600A 3 phase service for future building elevators and a 200A panel. Associated with Main Permit BLD-MFD$0
ELE2025-001882025-03-12Electrical1345 28TH ST***VOID 180 Days No Activity*** Temporary electrical permit for a 600-amp service to feed the future elevator panels and a 200-amp panel for 1345 28th Street. Main building permit$0
MEC2025-003402025-03-10Mechanical / HVAC2425 55TH STRemove and replace (1) Aquasnap Carrier Chiller with a like for like replacement for Integrated DNA Technologies located at 2425 Bldg. A. 55th Street, Boulder, CO 80301$116,922
ELE2025-001262025-02-24Electrical4775 WALNUT STProvide 50amp single phase power connection and disconnect to the roof mounted VRF outdoor unit. Referencing permit: MEC2024-01001.$300
ELE2024-008112024-09-26Electrical1047 13TH ST 4**VOID-Inspections not completed within 180 days** New 200amp service to structure.$6,200
MEC2024-012642024-09-25Mechanical / HVAC2601 CANYON BLVDDemo and replace (3) boilers$520,811
ELE2024-004292024-05-30Electrical914 13TH STUpgrading the electrical line and meter packs to this property so we can install car chargers.** This is for the Electrical upgrade only. The installation of a charging station wil$5,000
ELE2024-002362024-04-02Electrical6930 WINCHESTER CIRSCOPE OF WORK IS LIMITED TO INSTALLATION OF NEW ELECTRICAL SERVICE, SWITCHGEAR, DOWNSTREAM BUSWAYS, GROUNDING CONNECTIONS, AND ASSOCIATED CONDUIT PATHWAYS AS INDICATED ON PLAN.$430,000
ELE2023-010292023-10-06Electrical2227 CANYON BLVD 208AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010202023-10-06Electrical2227 CANYON BLVD 152BVOID-180 Days no activity Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and componen$2,116
ELE2023-010452023-10-06Electrical2227 CANYON BLVD 308AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010272023-10-06Electrical2227 CANYON BLVD 206AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010632023-10-06Electrical2227 CANYON BLVD 458BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010402023-10-06Electrical2227 CANYON BLVD 260B*Voided for inactivity - no inspections within 180 days* Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating th$2,116
ELE2023-010532023-10-06Electrical2227 CANYON BLVD 359B*Voided for inactivity - no inspections within 180 days* Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating th$2,116
ELE2023-010522023-10-06Electrical2227 CANYON BLVD 357BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010412023-10-06Electrical2227 CANYON BLVD 261BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010642023-10-06Electrical2227 CANYON BLVD 461BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010512023-10-06Electrical2227 CANYON BLVD 355BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010462023-10-06Electrical2227 CANYON BLVD 309AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010502023-10-06Electrical2227 CANYON BLVD 354BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010482023-10-06Electrical2227 CANYON BLVD 312AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010552023-10-06Electrical2227 CANYON BLVD 363BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010472023-10-06Electrical2227 CANYON BLVD 311AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010542023-10-06Electrical2227 CANYON BLVD 361BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010182023-10-06Electrical2227 CANYON BLVD 111AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010262023-10-06Electrical2227 CANYON BLVD 203AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010622023-10-06Electrical2227 CANYON BLVD 457BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010562023-10-06Electrical2227 CANYON BLVD 406AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010572023-10-06Electrical2227 CANYON BLVD 408A*Voided for inactivity - no inspections within 180 days* Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating th$2,116
ELE2023-010682023-10-06Electrical2227 CANYON BLVD 403AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010212023-10-06Electrical2227 CANYON BLVD 156BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010172023-10-06Electrical2227 CANYON BLVD 108AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010382023-10-06Electrical2227 CANYON BLVD 257BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010592023-10-06Electrical2227 CANYON BLVD 451B*Voided for inactivity - no inspections within 180 days* Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating th$2,116
ELE2023-010332023-10-06Electrical2227 CANYON BLVD 252BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010252023-10-06Electrical2227 CANYON BLVD 201AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010322023-10-06Electrical2227 CANYON BLVD 214AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010442023-10-06Electrical2227 CANYON BLVD 306AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010612023-10-06Electrical2227 CANYON BLVD 455BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010312023-10-06Electrical2227 CANYON BLVD 210AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010342023-10-06Electrical2227 CANYON BLVD 253BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010302023-10-06Electrical2227 CANYON BLVD 209A*Voided for inactivity - no inspections within 180 days* Electrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating th$2,116
ELE2023-010222023-10-06Electrical2227 CANYON BLVD 157BElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116
ELE2023-010192023-10-06Electrical2227 CANYON BLVD 112AElectrical scope includes installing a retrofit load center kit which will utilize the existing enclosure while updating the internal bussing and components. Breakers will be a 1 $2,116

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →