COMPANY RECORD · TACOMA, WA
Stephen B Mackey — permit history in Tacoma, WA
Stephen B Mackey appears on 31 Tacoma permit records from 2016 through 2026, most often general construction (32.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 10 | 32.3% |
| Mechanical / HVAC | 9 | 29% |
| Plumbing | 9 | 29% |
| Demolition | 3 | 9.7% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 6 |
| 2017 | 4 |
| 2018 | 2 |
| 2019 | 2 |
| 2022 | 2 |
| 2023 | 3 |
| 2024 | 6 |
| 2025 | 2 |
| 2026 | 4 |
Busiest year on record: 2016, with 6 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1716 S MADISON ST | 2026-06-09 |
| 2615 S 80TH ST # 130 | 2026-04-16 |
| 7904 PACIFIC AVE | 2025-03-07 |
| 1202 E 72ND ST | 2024-09-19 |
| 415 N D ST | 2023-09-14 |
| 2322 S SHERIDAN AVE | 2023-03-27 |
| 1016 S SHIRLEY ST | 2023-01-10 |
| 2301 S STATE ST | 2019-10-31 |
| 1506 S 87TH ST | 2018-07-02 |
| 1082 S 88TH ST | 2017-09-25 |
| 1602 E 60TH ST | 2017-09-21 |
| 1202 N STEVENS ST | 2017-02-07 |
| 432 E 64TH ST | 2016-09-22 |
| 729 N STADIUM WAY | 2016-08-24 |
16 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $300 to $2,757,879, median $24,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
31 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| MECHC26-0103 | 2026-06-09 | Mechanical / HVAC | 1716 S MADISON ST | Mechanical work related to 30 unit apartments building | $50,000 |
| PLMBC26-0111 | 2026-05-22 | Plumbing | 1716 S MADISON ST | Plumbing related to a new 30 unit apartment building FIeld Revision #1 FRC26-0192 - Approved 7.14.26. Drain and install valve backflow - trap primers, Waste and vent sizing, see | $100,000 |
| PLMBC26-0075 | 2026-04-16 | Plumbing | 2615 S 80TH ST # 130 | Adding restroom. Related to BLDCA26-0021 | $3,500 |
| MECHC26-0074 | 2026-04-16 | Mechanical / HVAC | 2615 S 80TH ST # 130 | Adding restroom exhaust fan. Related BLDCA26-0021 | $300 |
| MECHC24-0022 | 2025-03-07 | Mechanical / HVAC | 7904 PACIFIC AVE | Mechanical plan set for Pacific Apartments. **10/31/2025: FIELD REVISION TO UPDATE DUCT WORK PER APPROVED DRAWINGS** | $50,000 |
| PLMBC24-0014 | 2025-03-07 | Plumbing | 7904 PACIFIC AVE | Plumbing plans set for BLDCN22-0065. ***FIELD REVISION APPROVED 10-31-25 | $50,000 |
| BLDCN23-0022 | 2024-09-19 | General construction | 1202 E 72ND ST | Construct Concrete Storm Detention Vault | $118,974 |
| BLDCN22-0088 | 2024-07-18 | General construction | 1202 E 72ND ST | Construct a new 12-unit apartment building ***FRC24-0181 APPROVED: 3rd story to Building B and change from 8 to 12 units.*** | $1,496,753 |
| MECHC22-0347 | 2024-07-18 | Mechanical / HVAC | 1202 E 72ND ST | Mechanical for a new 18-unit apartment building | $54,000 |
| MECHC22-0348 | 2024-07-18 | Mechanical / HVAC | 1202 E 72ND ST | Mechanical for a new 8-unit apartment building | $24,000 |
| PLMBC22-0294 | 2024-07-18 | Plumbing | 1202 E 72ND ST | Plumbing for a new 18-unit Multi Family Apartment Building. Approved under BLDCN22-0086. | $90,000 |
| BLDCN22-0086 | 2024-07-18 | General construction | 1202 E 72ND ST | Construct BUILDING A of a new 18-unit apartment building | $2,757,879 |
| BLDCA23-0250 | 2023-09-14 | General construction | 415 N D ST | Replace dilapidated existing retaining wall at commercial property. | $25,000 |
| BLDRA23-0206 | 2023-03-27 | General construction | 2322 S SHERIDAN AVE | Remodel of kitchen with minor non-bearing wall changes at SFD. Includes plumbing and mechanical per plans. | $25,000 |
| BLDRA22-1242 | 2023-01-10 | General construction | 1016 S SHIRLEY ST | Construct 310SF addition to single-family residence, enlarging bedroom and bathroom. Includes plumbing & mechanical per approved plans. | $51,485 |
| DEMOR22-0109 | 2022-11-16 | Demolition | 1202 E 72ND ST | Demolish Existing SFR. (Garage demo under separate permit). | $15,000 |
| DEMOR22-0083 | 2022-08-25 | Demolition | 415 N D ST | Demolish detached garage | $10,000 |
| PLMBC19-0241 | 2019-10-31 | Plumbing | 2301 S STATE ST | Plumbing and fixtures related to BLDCA18-0081. | $15,000 |
| MECHC19-0333 | 2019-10-31 | Mechanical / HVAC | 2301 S STATE ST | Mechanical units related to BLDCN18-0081. | $10,000 |
| MECHR18-0624 | 2018-07-02 | Mechanical / HVAC | 1506 S 87TH ST | Heating and venting associated with construction of new SFD. | $5,000 |
| PLMBR18-0452 | 2018-07-02 | Plumbing | 1506 S 87TH ST | Plumbing associated with construction of new SFD. | $10,000 |
| DEMOR17-0095 | 2017-09-25 | Demolition | 1082 S 88TH ST | Demo approx 468sf detached garage at SFD | $10,000 |
| BLDRN17-0211 | 2017-09-21 | General construction | 1602 E 60TH ST | Construct new 2-story SFD attached to existing garage | $212,190 |
| PLMBR17-0097 | 2017-02-07 | Plumbing | 1202 N STEVENS ST | Plumbing fixtures associated with remodel of SFD. (BLDRA16-1007) | $3,000 |
| MECHR17-0176 | 2017-02-07 | Mechanical / HVAC | 1202 N STEVENS ST | Furnace and exhaust fans associated with remodel of SFD. (BLDRA16-1007) | $5,000 |
| MECHR16-1249 | 2016-09-22 | Mechanical / HVAC | 432 E 64TH ST | Exhaust fans and furnace associated with addition and remodel at SFD | $80,000 |
| PLMBR16-0804 | 2016-09-22 | Plumbing | 432 E 64TH ST | Plumbing for remodel and addition at SFD | $80,000 |
| PLMBR16-0747 | 2016-08-24 | Plumbing | 729 N STADIUM WAY | Plumbing fixtures associated with additionremodel of SFD. (BLDRA16-0573) | $5,000 |
| BLDRA16-0644 | 2016-08-16 | General construction | 6007 E PORTLAND AVE | Interior Remodel of an existing SFD including window replacement and reconfiguration of one bathroom. | $20,000 |
| BLDRA16-0491 | 2016-06-11 | General construction | 432 E 64TH ST | Exploratory Interior demo at SFD. | $500 |
| BLDRA16-0185 | 2016-03-16 | General construction | 3561 E T ST | This is an existing garage that needs to have extensive repair work. The roof will be rebuild. The double door opening will be changed to a single door. The walls have some areas o | $4,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Tacoma permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
