COMPANY RECORD · TACOMA, WA

Smith Fire Systems — permit history in Tacoma, WA

Smith Fire Systems appears on 39 Tacoma permit records from 2021 through 2026, all of them fire protection.

Permit categories

CategoryPermitsShare
Fire protection39100%

Activity by year

YearPermits issued
20219
20226
20233
20247
20257
20267

Busiest year on record: 2021, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
3806 E PORTLAND AVE2026-08-06
3140 S CEDAR ST2026-06-22
1712 S 17TH ST2026-05-06
245 TACOMA AVE S # 1002026-03-27
3102 S PINE ST2026-03-03
3130 S 38TH ST2026-03-02
2315 YAKIMA AVE # 4A2026-01-16
1701 E ALEXANDER AVE2025-11-26
3112 S 38TH ST2025-11-07
1811 S 76TH ST2025-09-05
2101 SOUTH TACOMA WAY2025-05-27
744 MARKET ST # 101A2025-04-02
8025 S HOSMER ST2025-01-29
1501 PACIFIC AVE2024-10-29

34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,350 to $35,297, median $5,183. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

39 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
FIREC26-01402026-08-06Fire protection3806 E PORTLAND AVESFS will be replacing the existing fire signal expander at BPS Fellowship Bible Church, all other devices will remain unaltered$3,270
FIREC26-00992026-06-22Fire protection3140 S CEDAR STReplace existing fire alarm control panel, initiating devices, exterior notification devices, and cell communicator$7,386
FIREC26-00792026-05-06Fire protection1712 S 17TH STReplacing an existing booster power supply onsite. No altering of FA devices or FA itself.$2,953
FIREC26-00462026-03-27Fire protection245 TACOMA AVE S # 100Power supply is located in parking garage P2 - scope of work is to replace the fire signal expander, we are not altering the existing fire alarm devices or the FA itself.$3,918
FIREC26-00222026-03-03Fire protection3102 S PINE STScope of this project is to replace the existing FACP, remote annunciator and initiating devices. The existing initiating devices will be replaced are compatible with the new FACP$8,445
FIREC26-00192026-03-02Fire protection3130 S 38TH STReplace the existing Fire ALARM Signal expander; all other devices and the FACP itself will remain unaltered. at Commercial$2,529
FIREC25-03162026-01-16Fire protection2315 YAKIMA AVE # 4AProject scope is to replace the booster power supply within Building 4 all other devices and circuits will remain unaltered- Mercy Housing SUBSIDIZED UNITS 5 OR MORE$2,923
FIREC25-02662025-11-26Fire protection1701 E ALEXANDER AVEInstall FIRE ALARM Full Alarm System at PETRO INDUSTRIES$4,925
FIREC25-02272025-11-07Fire protection3112 S 38TH STReplace the existing FACP quantity 28, remote annunciator, initiating devices and the communicator. All other devices will remain unaltered$12,576
FIREC25-02192025-10-24Fire protection3130 S 38TH STReplace the existing FACP, Fire signal expander, remote annunciator, radio communicator, and initiating devices. All existing notification and circuits are to remain unaltered at P$27,590
FIREC25-01182025-09-05Fire protection1811 S 76TH STREPLACE/ INSTALL Full Alarm System$6,625
FIREC25-01082025-05-27Fire protection2101 SOUTH TACOMA WAYScope of this project is to demo the existing FACP, notification and initiating devices.: GEN WAREHOUSING STORAGE$2,101
FIREC25-00372025-04-02Fire protection744 MARKET ST # 101AScope of this project is to replace the existing fire signal expander$2,812
FIREC24-02822025-01-29Fire protection8025 S HOSMER STInstall a new FACP, notification and initiating devices in commercial building.$5,874
FIREC24-02262024-10-29Fire protection1501 PACIFIC AVE**Replace the existing conventional fire alarm control panel at commercial building, to replace the existing notification devices and the AES radio transmitter, smoke and heat dete$9,733
FIREC24-01312024-08-02Fire protection2001 THORNE RDThis scope of this project is to install a new FACP, fire signal expander, AES radio, notification and initiating devices.$5,183
FIREC24-01102024-06-26Fire protection712 MARTIN LUTHER KING JR WAYReplace existing Fire Alarm Control Panel and add ASE Radio at Pheobe House.$5,824
FIREC24-01042024-06-05Fire protection5950 N 9TH STReplace the existing FACP, notification, and initiating devices shell protection only$5,157
FIREC24-00672024-03-22Fire protection436 BROADWAY # 300Replace the existing fire signal expander on the 3rd level.$4,012
FIREC24-00552024-03-19Fire protection6612 SOUTH TACOMA WAYInstall an AES radio transmitter$5,724
FIREC24-00392024-03-14Fire protection1701 E ALEXANDER AVEReplace the existing fire alarm control panel$4,562
FIREC23-01582023-05-24Fire protection2315 YAKIMA AVEReplace the existing fire signal expander in Building 1 - all other devices are existing and will remain unaltered.$2,409
FIREC23-00592023-03-15Fire protection2502 S 78TH STScope of this project is to install the existing fire alarm control panel, notification and initiating devices for the purpose of system upgrade$18,263
FIREC23-00542023-03-02Fire protection3806 E PORTLAND AVESCOPE OF WORK IS TO INSTALL AND AES RADIO$2,949
FIREC22-02002022-10-06Fire protection1649 E 72ND STCONNECT THE EXISTING KITCHEN HOOD SWITCH TO THE EXISTING CONVENTIONAL FIRE ALARM CONTROL PANEL$3,570
FIREC22-01762022-08-17Fire protection1 BROADWAYREPLACE THE EXISTING FIRE SIGNAL EXPANDER AT THE OVERLOOK ON BROADWAY II.$1,947
FIREC22-01582022-07-29Fire protection3102 S 23RD STTHE SCOPE OF THIS PROJECT IS TO REPLACE THE EXISTING FIRE SIGNAL EXPANDER$1,350
FIREC22-00892022-06-08Fire protection5401 6TH AVETHE SCOPE OF THIS PROJECT IS TO REPLACE THE EXISTING FIRE ALARM CONTROL PANEL WITH A NEW FIRE ALARM CONTROL PANEL$4,215
FIREC22-00882022-05-04Fire protection714 S 27TH STTHE SCOPE OF THIS PROJECT IS TO INSTALL A NEW FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES FOR THE PURPOSE OF TENANT IMPROVEMENT$9,761
FIREC21-02672022-01-05Fire protection926 N PEARL ST BLDG D3THE SCOPE OF THIS PROJECT IS TO REPLACE THE EXISTING CONVENTIONAL FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES.$7,275
FIREC21-02662021-12-14Fire protection930 N PEARL ST BLDG F2REPLACE THE EXISTING CONVENTIONAL FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES AT WESTSIDE ESTATES BLDG 33.$7,186
FIREC21-01502021-07-27Fire protection4015 SR 509 N FRONTAGE RDThe scope of this project is to replace the existing fire alarm control panel for the purpose of panel upgrade. FRC21-0183 APPROVED WITH UPDATED SPEC SHEETS$5,529
FIREC21-01432021-07-16Fire protection1649 E 72ND STTHE SOPE OF THIS PROJECT IS TO INSTALL A NEW AES RADIO.$1,902
FIREC21-01072021-05-26Fire protection401 E ALEXANDER AVE BLDG #9532INSTALL NEW FIRE ALARM CONTROL PANEL AND INITIATING DEVICES FOR THE PURPOSES OF FACP REPLACEMENT$6,638
FIREC21-01082021-05-26Fire protection401 E ALEXANDER AVE 424INSTALL NEW FIRE ALARM CONTROL PANEL & INITIATING DEVICES FOR THE PURPOSES OF A FACP REPLACEMENT$7,335
FIREC21-00762021-05-06Fire protection1001 PORT OF TACOMA RDREPLACE EXISTING FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES FOR TENANT IMPROVEMENT$3,285
FIREC21-00282021-03-16Fire protection715 S I STINSTALL NEW FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES FOR NEW CONSTRUCTION$12,696
FIREC21-00112021-03-02Fire protection715 S I STSmith Fire Systems (SFS) will install a wet pipe sprinkler system to protect the heated interiors of the building. SFS will start work at the 4 supply flange located in the riser b$35,297
FIREC20-02902021-01-04Fire protection1916 MARC AVEINSTALL NEW FIRE ALARM CONTROL PANEL, NOTIFICATION, AND INITIATING DEVICES FOR TENANT IMPROVEMENT$7,851

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Tacoma permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →