COMPANY RECORD · TACOMA, WA

Resicon LLC — permit history in Tacoma, WA

Resicon LLC appears on 377 Tacoma permit records from 2019 through 2026, most often mechanical / hvac (70% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC26470%
Plumbing10427.6%
General construction92.4%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20191
202131
202272
202398
202467
202559
202649

Busiest year on record: 2023, with 98 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
515 E 43RD ST2026-08-17
6052 S ASOTIN CT2026-08-10
1407 S GRANT AVE2026-08-10
3717 E K ST2026-08-07
4015 S GREGORY ST2026-08-04
5905 S CHEYENNE ST2026-08-04
1128 N SKYLINE DR2026-07-30
3321 N ORCHARD ST2026-07-23
2236 E MORTON ST2026-07-01
3317 S MONROE ST2026-07-01
5815 E MCGHEE ST2026-06-30
901 E HARRISON ST2026-06-25
1816 N HIGHLAND ST2026-06-25
4316 S 8TH ST2026-06-25

319 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $350 to $80,000, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

377 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
MECHR26-09642026-08-17Mechanical / HVAC515 E 43RD STInstall heat pump and air handler at SFD$5,000
PLMBR26-04052026-08-10Plumbing6052 S ASOTIN CTInstall Heat pump water heater at AFH- SFD$4,500
MECHR26-09692026-08-10Mechanical / HVAC1407 S GRANT AVEInstall Ductless heat pump at SFD$5,000
MECHR26-09292026-08-07Mechanical / HVAC3717 E K STInstall Ductless Heat Pump at SFD.$5,000
MECHR26-09302026-08-07Mechanical / HVAC6052 S ASOTIN CTInstall Heat Pump and Air Handler at SFD.$5,000
PLMBR26-03952026-08-04Plumbing4015 S GREGORY STInstall heat pump water heater at SFD$4,500
MECHR26-09192026-08-04Mechanical / HVAC4015 S GREGORY STInstall Heat Pump and Air Handler at SFD.$5,000
PLMBR26-03912026-08-04Plumbing5905 S CHEYENNE STInstall heat pump water heater at SFD$4,500
BLDRA26-05282026-07-30General construction1128 N SKYLINE DRInstall electric-to-gas water heater. Repipe from galv to pex, basement, 1st, and 2nd floor- Gas line for hot water tank and range , and installation of (2) heat pump (outdoor u$36,700
PLMBR26-03692026-07-23Plumbing3321 N ORCHARD STInstall Heat pump water heater **Install per manufacturers recommendations and per 2021 UPC.**$4,500
MECHR26-07192026-07-21Mechanical / HVAC1128 N SKYLINE DRGas line for hot water tank and range at SFD$1,600
MECHR26-07462026-07-01Mechanical / HVAC2236 E MORTON STInstall heat pump and Air Handler at SFD$5,000
MECHR26-07872026-07-01Mechanical / HVAC3317 S MONROE STInstall Air Conditioner and Gas Furnace at SFD$8,000
MECHR26-07732026-06-30Mechanical / HVAC5815 E MCGHEE STInstall Heat pump and air handler at SFD$5,000
MECHR26-07332026-06-25Mechanical / HVAC901 E HARRISON STInstall heat pump and air handler with Wireless t stat at SFD$5,000
MECHR26-07342026-06-25Mechanical / HVAC1816 N HIGHLAND STInstall heat pump and air handler with wireless t stat at SFD$5,000
MECHR26-07662026-06-25Mechanical / HVAC4316 S 8TH STInstall Heat pump add on to existing Gas furnace at SFD$5,000
PLMBR26-03132026-06-23Plumbing901 E HARRISON STInstall heat pump water heater at SFD$4,500
PLMBR26-03142026-06-23Plumbing1816 N HIGHLAND STInstall heat pump water heater at SFD$4,500
MECHR26-06822026-06-18Mechanical / HVAC1651 S WOODLAWN STInstall heat pump and air handler at SFD$5,000
MECHR26-06892026-06-16Mechanical / HVAC1022 S STATE STInstall heat pump and Air handler at SFD$5,000
MECHR26-06942026-06-15Mechanical / HVAC7648 S PARK AVEInstall heat pump and air handler at SFD$5,000
PLMBR26-02992026-06-12Plumbing1651 S WOODLAWN STInstall Water Heater at SFD$4,500
PLMBR26-02962026-06-12Plumbing1022 S STATE STInstall standard Electric storage tank, Install hybrid Heat pump water heater at SFD$8,000
MECHR26-06252026-06-03Mechanical / HVAC1719 E 64TH STInstall Heat pump and Air handler, with wireless T stat, at SFD$5,000
PLMBR26-02702026-06-03Plumbing6463 S I STInstall heat pump water heater at SFD **Install per manufacturers recommendations and per 2021 UPC.**$4,500
MECHR26-06262026-06-03Mechanical / HVAC6463 S I STInstall heat pump at SFD$5,000
MECHR26-04932026-04-28Mechanical / HVAC1128 N SKYLINE DRInstallation of heat pump system at SFD, one for basement and main floor, one for top floor. Two outdoor units.$15,100
MECHR26-04752026-04-27Mechanical / HVAC3584 E G STInstall heat pump and air handler at SFD$5,000
PLMBR26-01682026-04-08Plumbing3802 E SPOKANE STInstall heat pump water heater at SFD$4,500
MECHR26-04262026-04-08Mechanical / HVAC1002 S 34TH STInstall heat pump at SFD$5,000
MECHR26-04272026-04-08Mechanical / HVAC3802 E SPOKANE STInstall Heat pump at SFD$5,000
PLMBR26-01672026-04-08Plumbing1002 S 34TH STInstall heat pump water heater at SFD$4,500
MECHR26-02972026-04-01Mechanical / HVAC3406 N BRISTOL STInstall Heat pump at SFD$5,000
PLMBR26-01402026-03-26Plumbing1738 S PROCTOR STInstall heat pump water heater at SFD$4,500
MECHR26-03662026-03-26Mechanical / HVAC1815 S SPRAGUE AVEInstall Heat Pump at SFD.$5,000
MECHR26-03572026-03-25Mechanical / HVAC1738 S PROCTOR STInstall Heat pump$5,000
MECHR26-02752026-03-11Mechanical / HVAC5907 S I STInstall heat Pump at SFD$5,000
MECHR26-02282026-02-26Mechanical / HVAC515 E 56TH STInstall Ductless Heat pump at SFD$5,000
MECHR26-02092026-02-24Mechanical / HVAC6115 N 37TH STInstall Heat pump at SFD$5,000
MECHR26-01562026-02-09Mechanical / HVAC860 S 48TH STInstall Heat Pump at SFD.$10,000
MECHR26-01102026-02-02Mechanical / HVAC3702 N CHEYENNE STReplace like for like 80% gas furnace$2,000
MECHR26-00972026-01-29Mechanical / HVAC819 S 80TH STInstall Heat pump at SFD$6,000
PLMBR26-00252026-01-23Plumbing3915 N 35TH STInstall heat pump water heater$4,500
PLMBR25-05002026-01-21Plumbing6327 S D STReplace water lines to each fixture, install water heater. APPROVAL COMMENTS: - Approved for repipe of water lines and installation of new water heater only. - No other replace$9,500
MECHR26-00332026-01-16Mechanical / HVAC4510 N 27TH STReplace Gas Furnace at SFD$7,000
MECHR26-00202026-01-13Mechanical / HVAC8818 S ALASKA STInstall Heat Pump at SFD$8,000
MECHR25-14832026-01-08Mechanical / HVAC2101 S HOSMER STInstall Ductless Heatpump at SFD$7,000
PLMBR26-00032026-01-06Plumbing1933 65TH AVE NEInstall Hybrid water heater at SFD$4,500
MECHC25-03212025-12-29Mechanical / HVAC705 S 9TH ST # 206Install Heat pump, Outdoor unit on Roof, Indoor unit on 2nd floor$10,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Tacoma permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →