COMPANY RECORD · TACOMA, WA
R&R Foundation Specialist — permit history in Tacoma, WA
R&R Foundation Specialist appears on 55 Tacoma permit records from 2021 through 2026, most often general construction (98.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 54 | 98.2% |
| Plumbing | 1 | 1.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 16 |
| 2022 | 10 |
| 2023 | 2 |
| 2024 | 7 |
| 2025 | 14 |
| 2026 | 6 |
Busiest year on record: 2021, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1517 S 42ND ST | 2026-05-05 |
| 2222 N 29TH ST | 2026-04-29 |
| 2114 N PROSPECT ST | 2026-04-21 |
| 1524 S WASHINGTON ST | 2026-03-18 |
| 721 S 51ST ST | 2026-01-30 |
| 618 N AURORA AVE | 2026-01-29 |
| 1314 S SUNSET DR | 2025-12-12 |
| 4122 N 25TH ST | 2025-12-10 |
| 3110 N 24TH ST | 2025-07-29 |
| 2327 S SHERIDAN AVE | 2025-07-16 |
| 1427 S 53RD ST | 2025-06-20 |
| 1008 N STEELE ST | 2025-06-06 |
| 516 N D ST | 2025-04-15 |
| 2110 N MADISON ST | 2025-03-10 |
53 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $4,990 to $47,870, median $19,650. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
55 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDRA26-0258 | 2026-05-05 | General construction | 1517 S 42ND ST | Install 12 piles and 2 piers to stabilize SFD after settling has occurred. No mechanical or plumbing | $33,648 |
| PLMBR26-0114 | 2026-04-29 | Plumbing | 2222 N 29TH ST | Install subfloor drainage system attached to sump pump, the drainage will be routed to the street and an existing hole is already bored at SFD. Associated with STORM26-0011 | $20,124 |
| BLDRA26-0211 | 2026-04-21 | General construction | 2114 N PROSPECT ST | Crew will install 2 piles to stabilize retaining wall and prevent further settlement. Crew will install 3 tiebacks to stabilize retaining wall and prevent further lateral movement. | $7,100 |
| BLDRA26-0129 | 2026-03-18 | General construction | 1524 S WASHINGTON ST | Crew will install 3 concentric piles to stabilize the SFD after settling has occurred. | $7,500 |
| BLDRA26-0017 | 2026-01-30 | General construction | 721 S 51ST ST | Crew will install 9 piles to stabilize home after settling has occurred. at SFD *** No Plumbing, and NO Mechanical*** | $19,350 |
| BLDRA25-0971 | 2026-01-29 | General construction | 618 N AURORA AVE | Crew will install 3 piles to stabilize retaining wall and 3 anchors to support retaining wall at detached garage in front of SFD. ** no plumbing or mechanical ** | $11,950 |
| BLDRA25-0894 | 2025-12-12 | General construction | 1314 S SUNSET DR | Crew will install 5 piles to stabilize SFR after settling has occurred. at SFD *** No plumbing and No mechanical*** | $11,025 |
| BLDRA25-0870 | 2025-12-10 | General construction | 4122 N 25TH ST | Crew will install install 2 tie-back anchors to stabilize foundation after settling has occurred. at SFD ** No PLUMBING and NO MECHANICAL included*** | $4,990 |
| BLDRA25-0517 | 2025-07-29 | General construction | 3110 N 24TH ST | Install 6 piles to stabilize SFD after settling has occurred. No mechanical or plumbing scope included | $17,361 |
| BLDRA25-0473 | 2025-07-16 | General construction | 2327 S SHERIDAN AVE | Crew will install 7 piles to stabilize SFD after settling has occurred. | $19,110 |
| BLDRA25-0275 | 2025-06-20 | General construction | 1427 S 53RD ST | Install 12 helical piles to stabilize SFD after settling has occurred. | $32,110 |
| BLDRA25-0373 | 2025-06-06 | General construction | 1008 N STEELE ST | Installation of 9 piles to stabilize foundation at SFD | $23,538 |
| BLDRA25-0213 | 2025-04-15 | General construction | 516 N D ST | Install 6 piles to stabilize home after settling has occurred at SFD | $13,140 |
| BLDRA25-0095 | 2025-03-10 | General construction | 2110 N MADISON ST | Crew will install 21 piles to stabilize SFD after settling. | $46,925 |
| BLDRA25-0136 | 2025-03-10 | General construction | 1111 N E ST | Install 8 piles to stabilize SFD foundation after settling | $19,455 |
| BLDRA25-0109 | 2025-02-27 | General construction | 5805 S PARK AVE | Install 2 piles to stabilize the foundation after settling at SFD **FRR25-0151 (08.12.25): under addition, swapped the helicals out for new post and pads and added an additional be | $7,550 |
| BLDRA24-1005 | 2025-02-06 | General construction | 3317 SHORECLIFF DR NE | Stabilize foundation by installing 3 Helicals at SFD. | $6,400 |
| BLDRA25-0012 | 2025-02-06 | General construction | 3831 S 8TH ST | Install 4 piles to stabilize home after settling. (884 Sq Ft.) | $18,100 |
| BLDRA25-0019 | 2025-01-15 | General construction | 6207 S ORCHARD ST | Installing 13 piles to stabilize home after settling at SFD. No plumbing or mechanical included. | $34,651 |
| BLDRA25-0004 | 2025-01-10 | General construction | 1708 N JACKSON AVE | Install 11 piles to stabilize after settling at SFD | $26,465 |
| BLDRA24-1004 | 2024-12-18 | General construction | 5035 S M ST | Stabilize foundation after settling by installing 8 heilicals at SFD. | $23,340 |
| BLDRA24-0839 | 2024-11-19 | General construction | 502 N E ST | Installing 5 piles to stabilize and lift foundation at SFD | $13,475 |
| BLDRA24-0847 | 2024-11-19 | General construction | 1524 S WASHINGTON ST | Installing 5 helicals to stabilize foundation at SFD | $13,250 |
| BLDRA24-0760 | 2024-11-14 | General construction | 6514 N 53RD ST | Installation of 14 piles to stabilize SFD after settling | $47,870 |
| BLDRA24-0851 | 2024-10-30 | General construction | 924 N TACOMA AVE | install 16 Helicals to stabilize foundation at SFD. | $39,480 |
| BLDRA24-0852 | 2024-10-30 | General construction | 2801 N ALDER ST | install 3 helicals to stabilize SFD. | $19,255 |
| BLDRA24-0761 | 2024-09-18 | General construction | 2817 N WARNER ST | Installation of 19 piles to stabilize SFD after settling | $42,300 |
| BLDRA23-0120 | 2023-03-06 | General construction | 4825 A ST | Foundation repair 10272023 - FRR23-0313 APPROVED - Removes three pilings from plan | $25,400 |
| BLDRA23-0016 | 2023-01-19 | General construction | 850 S MULLEN ST | Foundation repair of SFD. | $13,700 |
| BLDRA22-0848 | 2022-11-23 | General construction | 4048 FAWCETT AVE | Foundation Repair | $19,650 |
| BLDRA22-0286 | 2022-06-08 | General construction | 2211 N CEDAR ST | Installation of 8 piles to stabilize the foundation after settling of SFD. | $14,909 |
| BLDRA22-0297 | 2022-04-21 | General construction | 4005 6TH AVE | Installation of 13 piles to stabilize the foundation after settling of SFD. | $27,770 |
| BLDRA22-0257 | 2022-03-31 | General construction | 318 N I ST | Foundation repair at duplex. Installation of 9 Helical piles, angle iron and post base to stabilize and lift foundation to maximum recovery after experiencing settlement. | $20,620 |
| BLDRA22-0287 | 2022-03-31 | General construction | 4307 S M ST | Foundation Repair Crew will install 10 helical piles and 1 stabilize-loc piles to stabilize foundation. Crew will install 10 new 4x6 posts and pads. | $30,158 |
| BLDRA22-0115 | 2022-02-18 | General construction | 1905 DUMAS CIR NE | Installation of 20 helical piles to lift and stabilize the foundation to maximum recovery at SFD. | $39,000 |
| BLDRA22-0099 | 2022-02-18 | General construction | 106 S 46TH ST | Installation of 14 helical piles and 3 post bases to liftstabilize SFD to maximum practical recovery. | $24,850 |
| BLDRA22-0097 | 2022-02-16 | General construction | 4309 N 34TH ST | Installation of 17 helical piles and 16 pads to liftstabilize foundation of SFD. | $36,400 |
| BLDRA22-0100 | 2022-02-16 | General construction | 1035 S OXFORD ST | Installation of 7 helical piles to stabilizelift the SFD to maximum recovery. | $11,900 |
| BLDRA22-0056 | 2022-02-03 | General construction | 1507 S 11TH ST | Crew will install 7 helical piles and 1 stabil-loc pile and lift to maximum structural recovery at SFD. Crew will install 3 new 6x6 posts and pads. Crew will span steel channel acr | $17,882 |
| BLDRA21-0964 | 2021-12-23 | General construction | 702 N SHERIDAN AVE | The crew will install helical piers at SFD and stabilize the front porch only. | $6,210 |
| BLDRA21-0963 | 2021-12-17 | General construction | 3317 N 8TH ST | The crew will install 12 helical piles to stabilize the foundation at SFD. | $27,113 |
| BLDRA21-0906 | 2021-12-10 | General construction | 3628 S CUSHMAN AVE | Install 11 helical piles and 1 stabil-loc piles to lift to maximum structural recovery at SFD. | $29,054 |
| BLDRA21-0696 | 2021-09-03 | General construction | 820 N JUNETT ST | Foundation repair at SFD. The crew will install 11 helicals and lift the home to maximum practical recovery. | $25,390 |
| BLDRA21-0674 | 2021-08-25 | General construction | 7219 S I ST | Foundation repair | $25,245 |
| BLDRA21-0649 | 2021-08-16 | General construction | 2016 E 63RD ST | The crew will install 3 helical piles with 6 steel channel and lift the home to maximum practical recovery. | $25,833 |
| BLDRA21-0648 | 2021-08-16 | General construction | 1864 58TH ST NE | The crew will install 12 helical piles and lift to maximum practical structural recovery. | $28,295 |
| BLDRA21-0607 | 2021-08-03 | General construction | 3305 N 8TH ST | Install 9 helical piles and 4 stabilize-loc piles to lift SFD home to maximum structural recovery. | $34,710 |
| BLDRA21-0537 | 2021-07-28 | General construction | 6102 S D ST | Install 3 helical piles with 6 steel channel, 6x6 post bases with pads, as well as 4x4 post bases with pads, and lift the home to maximum practical recovery. | $25,691 |
| BLDRA21-0547 | 2021-07-27 | General construction | 6115 E PORTLAND AVE | The crew will install 8 helical piles to stabilize the perimeter or original foundation of SFD. | $16,317 |
| BLDRA21-0541 | 2021-07-15 | General construction | 2117 N ALDER ST | The crew will install 17 helical piles and 2 stabil-locs to lift sfd to maximum structural recovery. | $43,670 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Tacoma permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →