COMPANY RECORD · TACOMA, WA
Pacific Engineering Technologies — permit history in Tacoma, WA
Pacific Engineering Technologies appears on 44 Tacoma permit records from 2016 through 2026, most often general construction (81.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 36 | 81.8% |
| Plumbing | 4 | 9.1% |
| Mechanical / HVAC | 3 | 6.8% |
| Demolition | 1 | 2.3% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 2 |
| 2017 | 12 |
| 2018 | 2 |
| 2020 | 1 |
| 2021 | 5 |
| 2022 | 2 |
| 2023 | 8 |
| 2024 | 5 |
| 2025 | 6 |
| 2026 | 1 |
Busiest year on record: 2017, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Tacoma permit, not only this company's
This page is a snapshot of Pacific Engineering Technologies. The search behind it holds more than 31,246 Tacoma permits naming a contractor, since 2016: 13,998 mechanical (HVAC) permits, 9,682 building permits, 4,777 plumbing permits, 2,165 fire protection permits, 624 demolition permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Pacific Engineering Technologies files, or any new building permit in Tacoma. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3637 MCKINLEY AVE | 2026-09-10 |
| 846 E 50TH ST | 2025-08-04 |
| 4810 S BELL ST | 2025-05-23 |
| 4116 44TH AVE NE | 2025-05-12 |
| 1028 S HUSON ST | 2025-04-18 |
| 8611 S HOSMER ST | 2025-03-10 |
| 7601 PACIFIC AVE # 6 | 2025-02-28 |
| 8212 A ST | 2024-10-10 |
| 8201 6TH AVE # 50 | 2024-06-18 |
| 4028 S LAWRENCE ST # E | 2024-03-01 |
| 2513 S HOSMER ST | 2024-01-22 |
| 2010 S UNION AVE # 100 | 2024-01-08 |
| 8625 PACIFIC AVE | 2023-11-03 |
| 4313 CLIFF SIDE DR NE | 2023-10-26 |
35 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $5,000,000, median $115,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Mountain Heating & Cooling | 1 | 2025–2026 |
| Kliemann Bros Heating | 1 | 2025–2026 |
| George Nganga | 1 | 2024–2025 |
| Fast Water Heater | 1 | 2023–2024 |
| Guardian Security | 1 | 2023 |
| Mercurio's Natural Gas Service Inc | 1 | 2022–2026 |
| All Seasons Inc | 1 | 2021–2026 |
| T & L Home Design | 1 | 2020–2024 |
Companies that also appear in Tacoma permit records at addresses where Pacific Engineering Technologies filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
44 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDRA26-0616 | 2026-09-10 | General construction | 3637 MCKINLEY AVE | Reconfigure the existing garage into a heated living space, including an outdoor heat pump at SFD ** Mechanical included** NO plumbing work per plans | $50,000 |
| BLDRA25-0508 | 2025-08-04 | General construction | 846 E 50TH ST | Fire Damage Repair at SFD ***INCLUDES Plumbing and Mechanical*** | $55,198 |
| BLDRA25-0277 | 2025-05-23 | General construction | 4810 S BELL ST | Remove and replace damaged interior finishes due to water damage, reconfigure space in the existing basement to create 2 bedrooms and (1) full bathroom. New heated space is approx. | $85,000 |
| BLDRA25-0288 | 2025-05-12 | General construction | 4116 44TH AVE NE | Remove and replace the decayed floor framing and sheathing as required, to match existing. Remove and replace wall and floor finishes as required to match existing at SFD. | $15,000 |
| BLDRA25-0122 | 2025-04-18 | General construction | 1028 S HUSON ST | REPAIR THE DAMAGE TO SFD IN-KIND, THERE ARE NO ALTERATIONS OR ADDITIONS. SELECT INTERIOR FINISHES, INSULATION, AND FIXTURES ARE BEING REMOVED AND REPLACED ON THE GROUND FLOOR, UPP | $130,000 |
| BLDCA24-0449 | 2025-03-10 | General construction | 8611 S HOSMER ST | REPAIRS AT TENANT SPACES A, B, AND C FOR THE DAMAGE CAUSED BY RECENT FIRE AT COMMERCIAL BLDG. INCLUDING: 1) REMOVE AND REPLACE FIRE DAMAGED ROOF TRUSSES AND RAFTERS ABOVE UNITS A A | $1,651,000 |
| BLDCA25-0030 | 2025-02-28 | General construction | 7601 PACIFIC AVE # 6 | Repair fire damage at Madrona Apartments - existing Multifamily Building units 5 and 6 per approved drawings. | $100,000 |
| BLDRA24-0721 | 2024-10-10 | General construction | 8212 A ST | REPAIRS TO FIRE DAMAGED SFD MECHANICAL AND PLUMBING INCLUDED IN SCOPE OF WORK · REMOVE AND REPLACE THE FIRE-DAMAGED ROOF FRAMING OVER THE ENTIRE RESIDENCE. · REMOVE AND REPLACE TH | $260,000 |
| BLDCA24-0201 | 2024-06-18 | General construction | 8201 6TH AVE # 50 | EXTERIOR ENVELOPE IMPROVEMENTS AT THE COGIR AT THE NARROWS: REMOVAL AND REPLACEMENT OF THE SIDING, FLASHINGS AND WEATHER-RESISTIVE BARRIER. REMOVAL AND REPLACEMENT OF THE WINDOWS. | $5,000,000 |
| BLDCA24-0060 | 2024-03-01 | General construction | 4028 S LAWRENCE ST # E | THIS PERMIT IS FOR THE REPAIRS FOR THE DAMAGE CAUSED BY THE RECENT FIRE AT THE SUBJECT 4-PLEX IN TACOMA, WASHINGTON. THE SCOPE OF WORK IS TO REPAIR THE FIRE DAMAGE TO THE BUILDI | $298,963 |
| BLDRA24-0022 | 2024-01-22 | General construction | 2513 S HOSMER ST | REPAIR THE FIRE DAMAGE TO THE SFD IN-KIND, THERE ARE NO ALTERATIONS OR ADDITIONS. 1) REMOVE AND REPLACE (3) DAMAGED LOWER ROOF RAFTERS OVER THE LAUNDRY ROOM AT THE WEST END OF TH | $40,000 |
| BLDCA23-0458 | 2024-01-08 | General construction | 2010 S UNION AVE # 100 | REPAIRS FOR THE MOISTURE DAMAGE TO THE COMMON WALL BETWEEN THE KITCHEN AND THE LOUNGE CAUSED BY THE RECENT PLUMBING LEAK AT COMMERCIAL BUILDING. NO MECHANICALPLUMBING REVIEWED UNDE | $175,000 |
| BLDCA23-0373 | 2023-11-03 | General construction | 8625 PACIFIC AVE | PARTIAL CHANGE OF OCCUPANCY AT THE EXTRA SPACE STORAGE BUILDING. RELATED TO BLDCA 23-0302. THE SCOPE OF THE CHANGE OF OCCUPANCY IS AS FOLLOWS: 1) THE EXISTING APARTMENT (OCCUPANC | $385,000 |
| BLDRA23-0951 | 2023-10-26 | General construction | 4313 CLIFF SIDE DR NE | REMODEL SFD TO WIDEN THE OPENING BETWEEN THE KITCHEN AND THE DINING ROOM ON THE MAIN FLOOR. | $57,840 |
| BLDCA23-0302 | 2023-09-01 | General construction | 8625 PACIFIC AVE | REPAIR DAMAGE TO THE ROOF STRUCTURE CAUSED BY THE RECENT FIRE AT THE EXTRA SPACE STORAGE BUILDING. 1) AN AREA OF APPROXIMATELY 75 BY 70 OF ROOFING, ROOF INSULATION, AND METAL ROO | $250,000 |
| BLDRA23-0790 | 2023-08-30 | General construction | 1002 E 71ST STREET CT | THE SCOPE OF WORK IS TO REPAIR THE FIRE DAMAGE TO THE HOUSE IN-KIND, THERE ARE NO ALTERATIONS OR ADDITIONS. THE SCOPE OF WORK CONSISTS OF THE FOLLOWING: 1. REMOVE AND REPLACE T | $158,579 |
| BLDRA23-0702 | 2023-08-21 | General construction | 1618 E WRIGHT AVE | INTERIOR FINISH REPLACEMENT DUE TO A FIRE AND PROVIDE STRENGTHENING TO THE BEARING CONDITIONS FOR THE SECOND FLOOR FRAMING. MECHANICAL, ELECTRICAL AND PLUMBING WORK IS NOT INCLUDE | $126,894 |
| BLDRA23-0531 | 2023-06-29 | General construction | 6246 S MASON AVE | REPAIR THE FIRE DAMAGE TO THE HOUSE IN-KIND, THERE ARE NO ALTERATIONS OR ADDITIONS. THE SCOPE OF WORK GENERALLY CONSISTS OF THE FOLLOWING: 1) REMOVE AND REPLACE (2) CHARRED ROOF R | $70,000 |
| BLDCA22-0472 | 2023-02-07 | General construction | 3906 N 34TH ST | THIS PERMIT IS FOR THE REPAIRS OF THE DAMAGE CAUSED BY THE RECENT FIRE AT THE NORTH TACOMA MONTESSORI SCHOOL IN TACOMA, WASHINGTON. ALL OF THE SECOND-STORY ROOF TRUSSES ARE BEING R | $197,258 |
| BLDCA22-0452 | 2023-01-26 | General construction | 2410 S I ST | THIS PERMIT IS FOR THE REPAIR OF FLOOR FRAMING DECAY DAMAGE AT APARTMENT BUILDING. REPAIR THE DECAYED FIRST FLOOR FRAMING OF UNIT 2. ALL REPAIRS ARE TO MATCH EXISTING CONDITIONS. | $26,000 |
| BLDRA22-1149 | 2022-12-12 | General construction | 858 S 86TH ST | REPAIR FIRE DAMAGE TO THE HOUSE IN-KIND, THERE ARE NO ALTERATIONS OR ADDITIONS. REPAIR (4) CUT ROOF RAFTERS AND (1) FLUSH BEAM, REPAIR CHARRED FLOOR JOISTS AND FLOOR SHEATHING, REM | $192,000 |
| BLDCA22-0104 | 2022-04-20 | General construction | 3410 6TH AVE | REPAIRS FOR FIRE DAMAGE AT ZION EVANGELICAL LUTHERAN CHURCH. REPAIR THE FIRE DAMAGE TO THE CHURCH BUILDING IN-KIND, INCLUDING ONE EXIT DOOR, INTERIOR FINISHES AND INSULATION ARE B | $185,000 |
| BLDRA21-0915 | 2021-12-02 | General construction | 1505 S 54TH ST | REPAIR FIRE DAMAGE TO SFD IN-KIND; THERE ARE NO ALTERATIONS OR ADDITIONS. ALL INTERIOR FINISHES, INSULATION, AND FIXTURES TO BE REMOVED AND REPLACED ON BOTH FLOORS DUE TO THE FIRE | $110,000 |
| BLDCA21-0438 | 2021-11-22 | General construction | 4332 S 41ST ST | SELECTIVE DEMOLITION AT THE 30-UNIT APARTMENT BUILDING (4302-4310) THAT WAS RECENTLY DAMAGED BY FIRE LOCATED AT THE FOREST HILL VILLAGE APARTMENTS. | $100,000 |
| BLDCA21-0329 | 2021-08-17 | General construction | 4527 S PUGET SOUND AVE A | FIRE DAMAGE REPAIR-UNIT A. THE SCOPE OF WORK IS AS FOLLOWS: 1) PROVIDE TEMPORARY SUPPORT OF THE SECOND FLOOR WALLS AND ROOF FRAMING AS REQUIRED TO PERFORM REPAIRS. 2) REMOVE AND R | $100,000 |
| BLDRA21-0623 | 2021-08-11 | General construction | 1216 S FERRY ST | Fire damage repair of SFD. Repairs in kind except stick framed roof will be prefab roof trusses. Removereplace all interior finishes, insulation, fixtures. Reroof, new siding and | $120,000 |
| BLDRA21-0466 | 2021-06-22 | General construction | 6802 PACIFIC AVE | REPAIR THE DAMAGE TO THE HOUSE IN-KIND. NO ALTERATIONS OR ADDITIONS. THE DAMAGE OCCURRED TO THE EAST END OF THE RESIDENCE WHERE PORTIONS OF THE EXTERIOR WALL, FLOOR, AND CONCRETE F | $150,000 |
| BLDCA20-0288 | 2020-09-03 | General construction | 1928 E 56TH ST | Fire damage repair to 4 units (67,68,73,&74) of building 5 at Swan Creek Apartments. Includes replacement of roof trusses, insulation, fixtures, doors, windows. A fire control room | $766,499 |
| PLMBR18-0514 | 2018-07-18 | Plumbing | 605 N 8TH ST | Plumbing fixtures associated with remodel of fire damaged SFD. | $6,500 |
| MECHR18-0718 | 2018-07-18 | Mechanical / HVAC | 605 N 8TH ST | Heating and venting associated with remodel of fire damaged SFD. | $1,000 |
| BLDRA17-0862 | 2017-12-19 | General construction | 4520 S G ST | Fire damage repair to an existing single family residence with a 2nd floor addition (Bigger Master bedroom) | $103,226 |
| BLDCA17-0394 | 2017-12-08 | General construction | 3201 PACIFIC AVE 208 | INSTALL A SOLDIER PILE RETAINING WALL BEHIND THE EXISTING CONCRETE BLOCK RETAINING WALL AT THE NORTHEAST CORNER OF THE PROPERTY. | $345,000 |
| PLMBC17-0173 | 2017-08-04 | Plumbing | 3524 MCKINLEY AVE | Plumbing permit for the new fixtures at McKinley Lofts (formerly Station Lofts). Assoc. W BLDCA16-0191 | $5,000 |
| BLDRA17-0208 | 2017-04-24 | General construction | 605 N 8TH ST | Repair portion of fire damaged SFD. Plumbing Mechanical to be submitted and approved for permit separately, but must be approved, issued, and inspected before building permit can | $600,000 |
| DEMOR17-0024 | 2017-04-13 | Demolition | 1012 S TRAFTON ST | Demolish fire damaged 1,160sf SFD,leaving the foundation to re-build on. (See approved site plan w BLDRN17-0044) | $121,000 |
| MECHR17-0416 | 2017-04-13 | Mechanical / HVAC | 1012 S TRAFTON ST | Mechanical for electric furnace, exhaust fans for new SFD | $0 |
| BLDRN17-0044 | 2017-04-13 | General construction | 1012 S TRAFTON ST | Fire Damage rebuild to an existing single family residence. We will be rebuilding the house using the existing concrete foundation. The rebuild will also include a second floor ad | $173,828 |
| PLMBR17-0249 | 2017-04-13 | Plumbing | 1012 S TRAFTON ST | Plumbing for new SFD | $3,000 |
| BLDCA17-0056 | 2017-02-16 | General construction | 539 BROADWAY | Permit for Temp CO only for spaces that are not being modified or affected by the remodel First floor only. See attached drawings. See BLDCA16-0555 for full remodel work plans. | $500 |
| PLMBR17-0036 | 2017-02-14 | Plumbing | 6433 S TYLER ST | Plumbing for new SFD - BLDRN16-0199 | $3,000 |
| BLDRN16-0199 | 2017-02-14 | General construction | 6433 S TYLER ST | Construct new 1-story 1,120sf, 3-bdrm, 2 bathroom SFD to replace fire-damaged SFD. | $126,168 |
| MECHR17-0070 | 2017-02-14 | Mechanical / HVAC | 6433 S TYLER ST | Exhaust fans ONLY for new SFD - BLDRN16-0199. Separate mechanical permit approval required for heat pump. | $3,000 |
| BLDRA16-0679 | 2016-09-21 | General construction | 1311 S 96TH ST | PERFORM FIRE DAMAGE REPAIRS TO THE ROOF STRUCTURE AND DECK OF THE EXISTING RESIDENCE, AND REMOVE NON-BEARING PARTITION WALLS ON THE MAIN FLOOR | $200,000 |
| BLDRA16-0626 | 2016-07-29 | General construction | 6433 S TYLER ST | STRUCTURAL REPAIRS TO THE ROOF AND WALL FRAMING WHICH WERE DAMAGED BY A RECENT FIRE AT THE BRYNER RESIDENCE. THERE ARE NO MODIFICATIONS TO THE BUILDING FOOTPRINT OR HEIGHT. | $85,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Tacoma permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
