COMPANY RECORD · SEATTLE, WA

Sts Construction Services — permit history in Seattle, WA

Sts Construction Services appears on 321 Seattle permit records from 2015 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical321100%

Activity by year

YearPermits issued
201521
201637
201746
201840
201919
202039
202126
202223
202316
202420
202522
202612

Busiest year on record: 2017, with 46 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5825 VASSAR AVE NE2026-08-07
1301 SPRING ST2026-07-13
2846 NW 57TH ST2026-06-23
8415 24TH AVE SW2026-05-26
3606 SW MYRTLE ST2026-05-06
2327 BROADWAY E2026-05-06
2653 BELVIDERE AVE SW2026-04-22
1629 46TH AVE SW2026-03-06
2119 29TH AVE S2026-02-11
5714 SW ADMIRAL WAY2026-01-17
3523 S DAWSON ST2026-01-13
1901 15TH AVE E2025-12-04
3936 SW KENYON ST2025-11-13
5255 42ND AVE SW2025-11-03

190 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $3,000,000, median $2,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

321 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7157182-EL2026-08-07Electrical5825 VASSAR AVE NEWE ARE REWIRING THE ENTIRE HOME ACCORDING TO DRAWINGS- ALL SUPPLIED BY A 320AMP OVERHEAD SERVICE WITH 2-200AMP PANELS
7155772-EL2026-07-30Electrical5825 VASSAR AVE NEWE ARE GOING TO SET A 200AMP TEMPORARY POWER POLE IN THE BACK YARD FOR THE CONSTRUCTION PHASE AND THROUGH SIDING.
7152631-EL2026-07-13Electrical1301 SPRING STWe are remodeling the Kitchen in a condo and adding a bidet outlet.
7149600-EL2026-06-23Electrical2846 NW 57TH STWE ARE ELIMINATING KNOB AND TUBE CIRCUITS ON THE SECOND FLOOR , AND WE ARE SWAPPING OUT THE EXISTING PANEL TO HAVE SPACE FOR FUTURE EXPANSION.
7144799-EL2026-05-26Electrical8415 24TH AVE SWChanging the electrical panel to allow more breaker space for future expansion
7141787-EL2026-05-06Electrical3606 SW MYRTLE STWe are setting a temporary power pole on a project that has an existing overhead 200AMP Service, for the construction phase, as they are lifting the house.
7141738-EL2026-05-06Electrical2327 BROADWAY EWE ARE ADDING A COUPLE LIGHTS AND EXTENDING AN EXISTING CIRCUIT
7139671-EL2026-04-22Electrical2653 BELVIDERE AVE SWWE ARE ADDING 1 LEVEL 2 EV CHARGER IN GARAGE
7132292-EL2026-03-06Electrical1629 46TH AVE SWwe are adding a 150Amp Sub-Panel and remodeling in the Kitchen
7128839-EL2026-02-11Electrical2119 29TH AVE Swe are wiring a remodel, adding a 125 amp sub-panel, adding a heat pump, moving an existing 60amp EV Charger
7125407-EL2026-01-17Electrical5714 SW ADMIRAL WAYwe are running from a previously set EV disconnect to the charger.
7124766-EL2026-01-13Electrical3523 S DAWSON STBasement ADU
7119814-EL2025-12-04Electrical1901 15TH AVE EWe are wiring an outdoor kitchen with future heat and a couple dedicated circuits [8/13/2026 PGF Added 125A feeder to permit per contractor request. Post-issuance change fee includ$2,000
7116623-EL2025-11-13Electrical3936 SW KENYON STWE ARE REWIRING HOME AND REBUILDING AN EXISTING 200 AMP SERVICE$4,000
7114894-EL2025-11-03Electrical5255 42ND AVE SWWE ARE WIRING A KITCHEN AND A STORAGE ROOM IN AN EXISTING HOME.$2,000
7113611-EL2025-10-24Electrical3936 SW KENYON STWe are setting a temporary power pole for the remodel of an existing single family home.$2,000
7112133-EL2025-10-16Electrical7717 44TH AVE SWWe are wiring a new remodel with a basement , main floor , second floor , we are setting a new panel to support new circuits, sub-panel in garage and building a new overhead servic$4,000
7111803-EL2025-10-15Electrical5714 SW ADMIRAL WAYWE ARE RUNNING 3 NEW DEDICATED CIRCUITS TO THE SECOND FLOOR OF THE HOME.$800
7106312-EL2025-09-11Electrical2111 29TH AVE Swe are running 2 new dedicated circuits upstairs, 2 new dedicated circuits downstairs, setting a sub-panel in the garage with a GDO, EV charger, interior and exterior outlets and l$2,000
7101996-EL2025-08-15Electrical1515 SUNSET AVE SWWE ARE ADDING FLOOR HEAT TO A PRIMARY BATHROOM$800
7101251-EL2025-08-12Electrical7717 44TH AVE SWUFER GROUND$200
7099034-EL2025-07-29Electrical9734 31ST AVE SWWE ARE ADDING AN EV CHARGER$800
7097270-EL2025-07-21Electrical3820 38TH AVE SWWE ARE RUNNING A NEW HOT TUB CIRCUIT AND 3 ADDITIONAL DEDICATED CIRCUITS.$800
7094667-EL2025-07-03Electrical3050 43RD AVE WWE ARE WIRING THE BASEMENT$2,000
7093257-EL2025-06-26Electrical6519 49TH AVE SWWE ARE ROUGHING IN A DADU$800
7091874-EL2025-06-18Electrical612 SW OTHELLO STWE ARE UPGRADING THE PANEL AND ADDING AN EV CHARGER. [C.Kenefick 7/28/2025 - fee for 200a service added to permit.]$2,000
7091052-EL2025-06-12Electrical6117 12TH AVE NEWe are setting a temporary power pole for the construction phase.$500
7089392-EL2025-06-04Electrical7717 44TH AVE SWWE ARE SETTING A TEMPORARY POWER POLE FOR THE REMODEL.$200
7087994-EL2025-05-28Electrical3206 42ND AVE WBATHROOM AND LAUNDRY REMODEL.$800
7084743-EL2025-05-08Electrical5714 SW ADMIRAL WAYWE ARE REMODELING A KITCHEN , POWDER, LAUNDRY, AND ADDING A NEW BATH IN THE BASEMENT. [C.Kenefick 8/21/2025 - fees added to permit: EV charger, heat pump and 45 additional connecti$4,000
7079024-EL2025-04-03Electrical3462 41ST AVE SWWIRING AN ADDITION OF AN EXPANDED KITCHEN MUDROOM AND DELETING EXISTING JUNCTION BOXES$2,000
7072778-EL2025-02-27Electrical2121 41ST AVE SWWe wired a new mudroom and new bathroom, we changed the overhead service due to it being broken.$2,000
7071770-EL2025-02-21Electrical11461 MARINE VIEW DR SWWE ARE REMODELING THE BASEMENT AND THE PRIMARY BATH ON THE MAIN FLOOR. [C.Kenefick 3/14/2025 - fee for 100a feeder and additional 5 dedicated circuits added to permit.]$500
7066481-EL2025-01-22Electrical2121 41ST AVE SWADDING A SMALL MUDROOM WILL ADD UFER GROUND$200
7061672-EL2024-12-18Electrical5706 SW ADMIRAL WAYWE ADDED A DEDICATED CIRCUIT FOR A RANGE.$200
7061665-EL2024-12-18Electrical7080 LINCOLN PARK WAY SWWE SWAPPED OUT AN EXISTING PANEL. [C.Kenefick 5/8/2025 - service fee added to permit.]$500
7054291-EL2024-11-01Electrical5002 19TH AVE NEWE ARE REWIRING THE MAIN FLOOR OF THE HOME, SETTING TEMPORARY OUTLETS AND LIGHTS IN THE BASEMENT, AND WIRING THE GARAGE.$800
7047612-EL2024-09-24Electrical5204 42ND AVE SWE ARE REMODELING THE KITCHEN AND WIRING OUTLETS IN BEDROOM AND LIVING ROOM$500
7041261-EL2024-08-16Electrical8652 13TH AVE SWWE ARE SETTING A SUB-PANEL IN A SHED IN THE BACKY YARD$500
7038363-EL2024-07-31Electrical5714 SW ADMIRAL WAYWE ARE UPGRADING AN EXISTING 125 AMP SERVICE TO A NEW OVERHEAD 200 AMP SERVICE.$4,000
7035781-EL2024-07-16Electrical2511 9TH AVE WWE ARE REMODELING AN EXISTING BASEMENT. [10/7/2024 PGF Added (1) 200A service to permit. Post-issuance change fee included.]$2,000
7033586-EL2024-07-01Electrical433 BELMONT AVE EInstalling (2) owner provided dusk to dawn flood lights at exterior south pool location, up high on south fence. Utilizing existing exterior lighting circuit.$1,500
7033538-EL2024-07-01Electrical9039 GREENWOOD AVE NInstalling (3) dedicated 50A 2pole 208v circuits along with (3) owner provided plug-style EV chargers at the Parking L1 location.$8,000
7032330-EL2024-06-24Electrical4117 SW PORTLAND STWe are adding 2 new dedicated circuits for a primary bath remodel$500
7028872-EL2024-06-05Electrical3142 ALKI AVE SWBATH REMODEL$200
7027223-EL2024-05-28Electrical3223 44TH AVE WWE ARE ADDING AN OUTLET IN BOTH FIREPLACES IN THE HOME.$200
7025616-EL2024-05-16Electrical1706 E GALER STWE ARE RUNNING 4 NEW DEDICATED CIRCUITS TO A KITCHEN.[9/3/2024 JBC Added 100amp Feeder to Permit]$500
7019551-EL2024-04-12Electrical9208 20TH AVE SWInstalling building electrical Ufer at NE building corner. 20' stick of 1/2" rebar within footing.. top will be painted green.$300
7019173-EL2024-04-10Electrical1570 W ARMORY WAYNew TI; main electrical service has already been installed by another EC; this is a business providing 9 dedicated saunas, each requiring dedicated 1PH 240v circuitry. STS Electri$15,000
7015058-EL2024-03-18Electrical9700 3RD AVE NWWE ARE RELOCATING THE SERVICE TO THE HOME [C.Kenefick 5/3/24- fees for connections, and 7 dedicated appliance circuits added to permit. Post admin fee waived.]$500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →