COMPANY RECORD · SEATTLE, WA

Stateside Power Inc. — permit history in Seattle, WA

Stateside Power Inc. appears on 89 Seattle permit records from 2015 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical89100%

Activity by year

YearPermits issued
201523
20164
201710
201810
201910
202013
20217
20227
20231
20241
20252
20261

Busiest year on record: 2015, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2601 ELLIOTT AVE2026-08-12
10215 LAKE CITY WAY NE2025-12-08
809 S WASHINGTON ST2025-09-15
4220 12TH AVE NE2023-11-29
803 S WASHINGTON ST2022-12-05
101 N 46TH ST2022-08-12
2417 NW MARKET ST2022-08-03
4321 UNIVERSITY WAY NE2022-03-21
715 8TH AVE2021-08-24
4515 BROOKLYN AVE NE2021-06-22
4245 BROOKLYN AVE NE2021-03-17
4215 BROOKLYN AVE NE2021-02-19
3008 16TH AVE W2020-09-28
4755 FAUNTLEROY WAY SW2020-07-22

38 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $11,880,000, median $6,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

89 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7152918-EL2026-08-12Electrical2601 ELLIOTT AVETemp power for construction. 600A 480V 3PH$8,000
7120217-EL2025-12-08Electrical10215 LAKE CITY WAY NESwapping out Challenger panel to an Eaton panel .$500
7106685-EL2025-09-15Electrical809 S WASHINGTON STLow volt wiring for trash chute interconnect$500
7043602-EL2024-09-20Electrical809 S WASHINGTON STPhase 2 of Yesler Towers [9-20-24 BZ Updated Address to follow BLDG. Permit] [ 5-13-25 BZ Revision Approved ]; 8/25/25 RN Extended permit for 1 year to 9/20/26$4,150,000
6998328-EL2023-11-29Electrical4220 12TH AVE NEInstalling lights that were back ordered inside and outside ,finishing electric blinds in different locations ,finish spa and EPO switch in north tower from the original permit 68$2,000
6889577-EL2022-12-05Electrical803 S WASHINGTON STUnderground garage and North Tower electrical installation. 12-5-22 DR - Address changed to match the Phased Permit. 12-5-22 DR - PLANS APPROVED AND PERMIT ISSUED. 5/8/2024 renew$6,326,000
6916863-EL2022-08-12Electrical101 N 46TH STSkyline will provide, install, and configure (27) data boxes as well as (2) data drops in each unit (1) for the living room and (1) for the bedroom.$25,798
6914936-EL2022-08-03Electrical2417 NW MARKET STInspection for a 30 A trash lift disconnect$1,400
6894176-EL2022-08-01Electrical101 N 46TH STRemodel and upgrades to existing apartments - addition of one apartment$150,000
6905486-EL2022-06-14Electrical4220 12TH AVE NETemp Generator for man-lift erection and use until SCL completes temp service$1,400
6892049-EL2022-04-04Electrical809 S WASHINGTON STTemp generators for crane and trailers etc. until SCL provides permanent temp power$2,500
6889224-EL2022-03-21Electrical4321 UNIVERSITY WAY NELease up space for Standard at Seattle$4,500
6855162-EL2021-08-24Electrical715 8TH AVETrash chute interconnect .8/26/21 rm, Adding Trash Compactor to permit; supplied by same contractor.$1,000
6840460-EL2021-07-30Electrical809 S WASHINGTON STTemp power for crane and all other temp power needs for highrise construction. 77/7/2022 renewal 8/2/23 renewal PWR [C.Kenefick 1/16/25 - permit extended one year. Renewal fee appl$8,000
6813433-EL2021-06-22Electrical4515 BROOKLYN AVE NEComplete electrical installation for new high-rise apartment building. Permit extended to 1/27/23-WR.$5,029,070
6839817-EL2021-05-21Electrical4220 12TH AVE NETemp Generator for crane$1,400
6810949-EL2021-05-14Electrical4220 12TH AVE NE*Renewed 4/19/2022, EC* Complete electrical installation for 2 high-rise towers and parking garage 5-14-21 DWR Approved plans.$11,880,000
6828822-EL2021-03-17Electrical4245 BROOKLYN AVE NETemp generator for construction trailers$1,400
6787470-EL2021-02-19Electrical4215 BROOKLYN AVE NEComplete installation For Mixed use Midrise , extended permit$1,750,000
6816726-EL2020-12-29Electrical4515 BROOKLYN AVE NETemp generator for crane till temp power is installed .$1,000
6799621-EL2020-12-23Electrical4220 12TH AVE NETwo Temp power sheds for project construction$12,000
6799604-EL2020-10-06Electrical4215 BROOKLYN AVE NEComplete temp power for midrise construction use Crane and all misc power required. 9/7/2021 renewal$8,000
6802805-EL2020-09-28Electrical3008 16TH AVE WCO and Occ sensor pipe and wire for Mechanical contractor scope$4,000
6795826-EL2020-09-22Electrical4515 BROOKLYN AVE NETemp power for tower crane and construction. 9/22/2021 renewal$8,000
6792463-EL2020-07-22Electrical4755 FAUNTLEROY WAY SWRelocate transformer from L1 to Level P1$1,400
6787491-EL2020-07-21Electrical2417 NW MARKET STComplete electrical installation Mixed use building$3,935,000
6784843-EL2020-06-01Electrical4755 FAUNTLEROY WAY SWAdd (1) 100 A Panel and a transformer$5,500
6745925-EL2020-04-14Electrical715 8TH AVEComplete electrical installation for a 21 story Building 5/7/21 B. Schumacher renewed permit.$3,880,000
6765804-EL2020-04-09Electrical4716 RAINIER AVE S1-4-22 BZ Revision Approved. Mixed Use apartments and retail building with underground parking **permit extended 5/2022, C.Kenefick**$4,700,000
6747546-EL2020-02-20Electrical2417 NW MARKET STTemp power for construction of a mixed use building Includes Crane Permit extended to 11/11$8,000
6768782-EL2020-01-28Electrical715 8TH AVEGenerator for crane erection and temp use$900
6767501-EL2020-01-20Electrical715 8TH AVE1) 100kw and 1) 20kw Generator connections$900
6759439-EL2019-11-20Electrical4716 RAINIER AVE Stemp gen. set for crane$900
6754233-EL2019-10-29Electrical715 8TH AVETemp power for tower crane and construction of building$8,000
6744627-EL2019-09-04Electrical4716 RAINIER AVE S600 A Temp power for Crane, Manlift Dewatering and all construction related needs**permit extended to 9/4/2021 C.Kenefick; ; extended again until 3/4/22**$8,000
6744522-EL2019-08-21Electrical3922 SW ALASKA STRepair damaged feeder$5,500
6743228-EL2019-08-13Electrical4345 UNIVERSITY WAY NE3 added circuits for display purposes$2,200
6725612-EL2019-08-08Electrical1029 S JACKSON STComplete electrical service mixed use building **Permit extended 8/21 C.Kenefick**$4,970,000
6737369-EL2019-07-11Electrical4755 FAUNTLEROY WAY SWInstall wiring for Heat pump and fan coil$3,500
6715405-EL2019-03-13Electrical1029 S JACKSON STTEMP POWER FOR CONSTRUCTION INCLUDING CRANE , JOB TRAILERS, AND ALL MISC. ASSOCIATED EQUIPMENT (** SL OK to include generator and feeder disconnect for crane as well as temp servic$8,000
6699704-EL2019-02-13Electrical4700 BROOKLYN AVE NEComplete electrical installation of new high rise building. 02/13/19 JK APPROVED PLANS. 10/17/19 JK APPROVED REVISED PLANS.$4,190,000
6710177-EL2019-01-28Electrical1024 S KING STAdded pole light for parking area$2,000
6704267-EL2018-12-17Electrical210 FAIRVIEW AVE NAdded circuits for new Package storage system$2,200
6696124-EL2018-10-26Electrical4712 UNIVERSITY WAY NEadd 10 outlets$1,200
6693807-EL2018-10-15Electrical4700 BROOKLYN AVE NE"GET STARTED" permit for UFER and underslab conduit for 25 story high rise.$1,000
6693246-EL2018-10-11Electrical4755 FAUNTLEROY WAY SWAdd feeder to Space 8$4,200
6692378-EL2018-10-05Electrical4700 BROOKLYN AVE NEHookup to (2) portable generators for temp use. 200kva and 150kva.$2,800
6671880-EL2018-07-31Electrical125 BOREN AVE SMultifamily Apartments **permit extended to 1/22/21 C.Kenefick**$4,890,000
6676599-EL2018-07-18Electrical4700 BROOKLYN AVE NE600 A temp power for construction. Includes all temp power, Crane, man hoists and dewatering$5,600
6676088-EL2018-07-13Electrical125 BOREN AVE STemp power for project construction$6,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →