COMPANY RECORD · SEATTLE, WA

Skyway Electric, Inc. — permit history in Seattle, WA

Skyway Electric, Inc. appears on 158 Seattle permit records from 2019 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical158100%

Activity by year

YearPermits issued
201920
202023
202122
202212
202310
202428
202533
202610

Busiest year on record: 2025, with 33 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1606 42ND AVE SW2026-08-22
3101 15TH AVE S2026-07-28
11400 71ST PL S2026-07-25
6769 28TH AVE S2026-07-20
2015 S PEARL ST2026-06-09
7050 25TH AVE NE2026-04-15
7048 25TH AVE NE2026-04-15
8039 36TH AVE S2026-03-16
5561 23RD AVE S2026-03-16
5518 21ST AVE S2026-03-04
4250B S JUNEAU ST2025-11-19
4250A S JUNEAU ST2025-11-19
5570 18TH AVE S2025-11-14
7948A 35TH AVE SW2025-11-08

108 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $200 to $23,500, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

158 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7159385-EL2026-08-22Electrical1606 42ND AVE SWDemo knob and tube in attic, replace wiring for outlets and switches affected
7155389-EL2026-07-28Electrical3101 15TH AVE SRough-in and trim out for both units
7154935-EL2026-07-25Electrical11400 71ST PL SInstall new meter base and disconnect per SCL
7153948-EL2026-07-20Electrical6769 28TH AVE SAdding 200amp service for DADU and rough in & trim out for new DADU
7147338-EL2026-06-09Electrical2015 S PEARL STNew service for SFR and DADU, wire for new SFR
7138560-EL2026-04-15Electrical7050 25TH AVE NERough in and trim out for new DADU
7138559-EL2026-04-15Electrical7048 25TH AVE NERough in and trim out for SFR. Service for SFR + DADU
7133682-EL2026-03-16Electrical8039 36TH AVE SReplacing meter/disconnect and panel [C.Kenefick 3/20/2026 - one 50a circuit and eight 15-30a circuits added to permit.]
7133683-EL2026-03-16Electrical5561 23RD AVE SLike for like meter swap (ringless to a ringed)
7132012-EL2026-03-04Electrical5518 21ST AVE SRough in and service for new construction
7118852-EL2025-11-30Electrical5518 21ST AVE STemp pole$800
7117611-EL2025-11-19Electrical4250B S JUNEAU STRough in, service, and trim for new construction$9,000
7117610-EL2025-11-19Electrical4250A S JUNEAU STRough in, service, and trim for new construction$12,500
7116853-EL2025-11-14Electrical5570 18TH AVE SEmergency service repair (tree fell onto service)$4,000
7115910-EL2025-11-08Electrical7948A 35TH AVE SWRough in and service for new SFR (south side) [C.Kenefick 1/27/2026 - ufer test fee added to permit.]$13,500
7115911-EL2025-11-08Electrical7948B 35TH AVE SWRough in for AADU (North side)$12,000
7112795-EL2025-10-21Electrical401 NE 45TH STPre-work Inspection. Multi family service in small closet in old building.$15,000
7111501-EL2025-10-13Electrical5561 23RD AVE S1000sqft DADU 200a Service$18,000
7110230-EL2025-10-05Electrical5518 21ST AVE STemp power$1,250
7109973-EL2025-10-02Electrical2015 S PEARL STUFER$400
7104678-EL2025-09-02Electrical3101 15TH AVE SReplace 200amp dual meter base and (2) panels, 11/4/25 RN added fee for 2nd 200A meter base 9two single meter bases installed)$8,000
7098267-EL2025-07-24Electrical830 28TH AVE SDemo (2) LBs on mast side of meter pack [CJK 11/19/2025 - Contractor no longer on job.]$2,000
7092696-EL2025-06-23Electrical2208 NE 117TH STRough in and service for new construction$10,000
7092697-EL2025-06-23Electrical5530 23RD AVE SService and rough in for new construction$10,000
7090554-EL2025-06-10Electrical9213 25TH AVE SWUFER for new constructions$800
7088491-EL2025-05-29Electrical5561B 23RD AVE SUFER for new DADU$500
7088221-EL2025-05-28Electrical10016 WATERS AVE STemp power$800
7084427-EL2025-05-06Electrical1212A 6TH AVE NWire for A/C disconnect and surge protector breaker$1,400
7080835-EL2025-04-15Electrical5515 BEACON AVE SRed tagged project. Precon for what is needed done. Whole house rewire$8,000
7080828-EL2025-04-15Electrical4103 24TH PL SNew service, panel, and rewire SFR$15,000
7078040-EL2025-03-30Electrical1709 SW GRAHAM STInstall new 200amp panel$2,500
7078042-EL2025-03-30Electrical1715 SW GRAHAM STInstall new 200amp panel$2,500
7077378-EL2025-03-25Electrical4250A S JUNEAU STTemp power$800
7077379-EL2025-03-25Electrical4250 S JUNEAU STUFER Ground$300
7077297-EL2025-03-25Electrical5530 23RD AVE SUFER$400
7075394-EL2025-03-13Electrical7048 25TH AVE NEUFER for new construction$400
7073142-EL2025-03-02Electrical2208 NE 117TH STUFER ground for new construction DADU$800
7069588-EL2025-02-08Electrical7946 35TH AVE SWTemp power$800
7066851-EL2025-01-23Electrical2208 NE 117TH STTemporarily power pole$1,200
7065976-EL2025-01-17Electrical7907 AURORA AVE NReplaced subpanels for units 103, 103B, 101, and 202$7,500
7064434-EL2025-01-09Electrical4834 25TH AVE SWRough in, service, and trim out for new DADU$12,500
7063714-EL2025-01-06Electrical6834 BEACON AVE SRough in and service for new construction (DADU in back)$12,500
7060842-EL2025-01-02Electrical9213 25TH AVE SW600amp service for 2 townhouses and a SFR [1/2/24 KEF - Plan set approved. Scope includes service and feeders only (based on description and permit valuation). See OTC permit 7059$10,000
7061759-EL2024-12-18Electrical7907 AURORA AVE NReplace subpanels for units #102 and #201$4,000
7061015-EL2024-12-14Electrical7903 17TH AVE SWRough in and new service for SFR$12,500
7059865-EL2024-12-07Electrical9213 25TH AVE SWService upgrade and rough in for remodel$15,000
7059420-EL2024-12-04Electrical1806 S HORTON STNew 200amp service and rewire of existing SFR$11,000
7059422-EL2024-12-04Electrical3457 38TH AVE SWRewire basement bathroom, wire for electric fireplace insert$2,000
7056781-EL2024-11-15Electrical4834 25TH AVE SWUFER$800
7050375-EL2024-10-09Electrical8441 42ND AVE SNew DADU. Service, rough in, trim out$11,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →