COMPANY RECORD · SEATTLE, WA
Sd Electrical Services LLC — permit history in Seattle, WA
Sd Electrical Services LLC appears on 67 Seattle permit records from 2022 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 67 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 8 |
| 2023 | 26 |
| 2024 | 12 |
| 2025 | 16 |
| 2026 | 5 |
Busiest year on record: 2023, with 26 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4744 UNIVERSITY WAY NE | 2026-06-25 |
| 7323 WOODLAWN AVE NE | 2026-06-01 |
| 6014 12TH AVE S | 2026-05-08 |
| 4689 M L KING JR WAY S | 2026-04-09 |
| 1608 S STEVENS ST | 2026-02-25 |
| 615 NW 48TH ST | 2025-12-18 |
| 101 DENNY WAY | 2025-10-28 |
| 5022 M L KING JR WAY S | 2025-07-17 |
| 2218 NW MARKET ST | 2025-07-08 |
| 3016A 60TH AVE SW | 2025-06-28 |
| 628 NW 85TH ST | 2025-06-28 |
| 5222 KIRKWOOD PL N | 2025-06-17 |
| 9510 48TH AVE NE | 2025-06-05 |
| 1729 12TH AVE S | 2025-05-23 |
52 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $36,000, median $6,250. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
67 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7150008-EL | 2026-06-25 | Electrical | 4744 UNIVERSITY WAY NE | relocated several outlets from one location to a more centralized area for usage in one of the karaoke rooms | |
| 7145740-EL | 2026-06-01 | Electrical | 7323 WOODLAWN AVE NE | Zinsco panel replacement | |
| 7142229-EL | 2026-05-08 | Electrical | 6014 12TH AVE S | Installing (2) breakers: (1) 50amp breaker circuit for hvac unit and (1) 15amp breaker for air handler | |
| 7137594-EL | 2026-04-09 | Electrical | 4689 M L KING JR WAY S | low voltage installation/controller to (1) heat pump to first air handler, then chain to 2nd air handler, using 16/2 wire around 30-50 feet total. | |
| 7131042-EL | 2026-02-25 | Electrical | 1608 S STEVENS ST | service meter upgrade with a 'like-for-like' breaker panel swap. | |
| 7121934-EL | 2025-12-18 | Electrical | 615 NW 48TH ST | Installation of new electrical components for bathroom addition in client's bottom floor. | $1,600 |
| 7114083-EL | 2025-10-28 | Electrical | 101 DENNY WAY | installation of four (4) thermostats | $1,000 |
| 7096696-EL | 2025-07-17 | Electrical | 5022 M L KING JR WAY S | installation of 116 thermostats [C.Kenefick 9/11/2025 - Contractor is not doing work. Work being done on permit 7064481.] | $10,000 |
| 7094939-EL | 2025-07-08 | Electrical | 2218 NW MARKET ST | adding several dedicated circuits to accomodate several appliances that the facility plans on installing to use for their businesss. | $1,000 |
| 7093698-EL | 2025-06-28 | Electrical | 3016A 60TH AVE SW | installing the electrical aspect of a mini split | $400 |
| 7093699-EL | 2025-06-28 | Electrical | 628 NW 85TH ST | Installation (electrical aspect) of a mini split. | $500 |
| 7091752-EL | 2025-06-17 | Electrical | 5222 KIRKWOOD PL N | Installing a 30A disconnect | $600 |
| 7089610-EL | 2025-06-05 | Electrical | 9510 48TH AVE NE | installing all the electrical components into the home (outlets, lights, switches, etc) | $27,000 |
| 7087614-EL | 2025-05-23 | Electrical | 1729 12TH AVE S | circuit for Hot water tank, outlet for bidet, heated floor | $1,000 |
| 7085758-EL | 2025-05-13 | Electrical | 5222 KIRKWOOD PL N | Kitchen update, with installation of additional luminaires, switches, and a mini split. | $8,000 |
| 7078637-EL | 2025-04-02 | Electrical | 5715 51ST AVE S | Relocate service meter to new designated location and flip circuit panel to be an exterior rated NEMA-4 panel, to comply with all applicable building codes, NEC, and SCL, SDCI requ | $5,000 |
| 7078258-EL | 2025-03-31 | Electrical | 9510 48TH AVE NE | Service Panel Upgrade: Upgrade service panel and service meter to accommodate 200A for the SFR dwelling. | $7,000 |
| 7077637-EL | 2025-03-26 | Electrical | 4837 S FONTANELLE ST | Re-pulling a permit for a disconnect that was installed for the temple's elevator; since the last permit was already closed. | $0 |
| 7069459-EL | 2025-02-07 | Electrical | 959 20TH AVE | installation of interior electrical components for the SFR | $25,000 |
| 7069318-EL | 2025-02-06 | Electrical | 7744 20TH AVE SW | Whole home electrical rewire w/ new addition to existing home. | $15,000 |
| 7066714-EL | 2025-01-23 | Electrical | 12318 5TH AVE NE | service meter and electrical wiring of a 991 Sq. Ft DADU[8/25/2025 JBC Added Second 200amp Service to Permit for Relocation of SFR Service to DADU Strike Location] | $12,000 |
| 7062699-EL | 2024-12-27 | Electrical | 11315 LAKESIDE AVE NE | removing existing UG service. Relocating new requested OH 400 AMP service meter to the N end of the home with an addition of (2) 200 AMP Panels. | $20,000 |
| 7062692-EL | 2024-12-27 | Electrical | 3516 S CHICAGO ST | electrical wiring of approx. 2300 Sq Ft (SFR) 12/3/2025 AB: Renewal | $24,000 |
| 7062693-EL | 2024-12-27 | Electrical | 3516B S CHICAGO ST | electrical wiring for an approx. 965 sq. ft. adu 12/3/2025 AB: Renewal | $9,500 |
| 7062698-EL | 2024-12-27 | Electrical | 959 20TH AVE | Relocation of 200 AMP service meter to the N side of the Building. | $3,000 |
| 7047544-EL | 2024-09-24 | Electrical | 4821 S FONTANELLE ST | Temple is in need of a service meter upgrade to accommodate 400 AMPS. The meter will be changed from whatever current meter(s) are currently installed to a 400 AMP meter exemplifyi | $10,500 |
| 7045390-EL | 2024-09-11 | Electrical | 517 S MAIN ST | Kakurenbo sushi restaurant electrical rework 10/16/2025 AB: Renewal | $25,000 |
| 7020961-EL | 2024-04-21 | Electrical | 9213 25TH AVE SW | NEEDING TEMP POWER FOR CONTRACTORS TO HAVE POWER TO CONDUCT WORK FOR THE SFR | $1,800 |
| 7010729-EL | 2024-02-21 | Electrical | 6110 17TH AVE NW | Per SCL, service upgrade for both units with a relocation of the service meters to be on one side of the building. [C.Kenefick 8/9/24 - fees for remodel added to permit( connection | $8,000 |
| 7010710-EL | 2024-02-21 | Electrical | 2001 E YESLER WAY | Small kitchen renovation 3/5/24 Bob Schumacher was told a new panel was installed. Fees don't reflect panel installation but ok as is. | $4,500 |
| 7009430-EL | 2024-02-13 | Electrical | 2838 21ST AVE W | Per SCL Rep. Mina Khalil, one specific meter needed to be upgraded. Per SCL requirements, all meters needed to be relocated to all be on one side of the house. Since one meter is b | $5,000 |
| 7005424-EL | 2024-01-18 | Electrical | 5914 35TH AVE SW | installation of a 50 AMP receptacle for EV plug in charger | $500 |
| 7004541-EL | 2024-01-12 | Electrical | 4821 S FONTANELLE ST | assisting the temple to gain correct electrical service & installation | $4,000 |
| 7000634-EL | 2023-12-13 | Electrical | 11702 22ND AVE NE | replacing existing 200 AMP panel/meter with new. | $2,000 |
| 6990683-EL | 2023-10-11 | Electrical | 10421 RENTON AVE S | adding a dedicated circuit for heated flooring. | $100 |
| 6990288-EL | 2023-10-09 | Electrical | 2006 S WELLER ST | INSTALLING A DEDICATED CIRCUIT FOR A HAND DRYER | $4,099 |
| 6990011-EL | 2023-10-06 | Electrical | 9405 45TH AVE NE | relocation of the service panel and upgrade of feeder | $4,000 |
| 6985501-EL | 2023-09-12 | Electrical | 2646 S MONTEREY PL | Temp power for 2646 S Monterey PL | $1,500 |
| 6983476-EL | 2023-08-29 | Electrical | 3825 17TH AVE SW | The client is remodeling the kitchen to a more updated version of their liking; to accommodate their needs. | $5,500 |
| 6982214-EL | 2023-08-24 | Electrical | 530 QUEEN ANNE AVE N | Quick emergency replacement of burnt wires and an upgrade to an "up to code" panel [8-22-23 DR - Confirm loads on panel prior to final approval of work.] [8/22/2023 JBC Plan Review | $4,500 |
| 6980973-EL | 2023-08-15 | Electrical | 10421 RENTON AVE S | electrical installation to the 500 sq. ft. new addition with an added subpanel | $8,000 |
| 6976916-EL | 2023-07-24 | Electrical | 2009 30TH AVE W | installation of a 100 AMP subpanel, along with a 120V/50AMP Receptacle | $2,500 |
| 6976464-EL | 2023-07-20 | Electrical | 2646 S MONTEREY PL | Electrical Site Plan [7-20-23 DR - Plan Review not required for SFR or DADU. If the permit is withdrawn customer may receive a complete refund] | $8,000 |
| 6974319-EL | 2023-07-07 | Electrical | electrical installation for a DADU on the premises. | $10,000 | |
| 6973534-EL | 2023-07-03 | Electrical | 5403 13TH AVE S | Homeowner would like to have electrical service done to their DADU, including all electrical interior installation. | $8,500 |
| 6971893-EL | 2023-06-22 | Electrical | 4821 S FONTANELLE ST | Requesting inspectional only reference permit number 6706626-elClosed: no apparent safety hazards. [3/17/26 RN Amended record - revoking statement "Closed: no apparent safety hazar | $1 |
| 6970349-EL | 2023-06-21 | Electrical | 803 S SULLIVAN ST | Submitting documents and value for the "Service" portion of this project. Related electrical permits are of the following: 6955165-EL, 6955167-EL, 6955166-EL, 6956182-EL, 6956183-E | $8,000 |
| 6970911-EL | 2023-06-16 | Electrical | 6615 38TH AVE S | adding the following: electrical wiring for a mini-split, EV Charging receptacle, and several exterior receptacles (per NEC and Local codes), to existing service. | $4,000 |
| 6958747-EL | 2023-04-13 | Electrical | 3239 S EDMUNDS ST | Swapping the zinsco panel for an updated panel. | $3,500 |
| 6957841-EL | 2023-04-08 | Electrical | 3241 S EDMUNDS ST | Per Seattle City Light Rep. a different service meter base is needed to be installed. | $1,200 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →