COMPANY RECORD · SEATTLE, WA
Power And Light Electric LLC — permit history in Seattle, WA
Power And Light Electric LLC appears on 157 Seattle permit records from 2019 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 157 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 10 |
| 2020 | 10 |
| 2021 | 9 |
| 2022 | 23 |
| 2023 | 12 |
| 2024 | 46 |
| 2025 | 34 |
| 2026 | 13 |
Busiest year on record: 2024, with 46 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2415 MONTAVISTA PL W | 2026-08-19 |
| 7740 18TH AVE NE | 2026-08-15 |
| 3238 34TH AVE W | 2026-07-30 |
| 3236 34TH AVE W | 2026-07-30 |
| 7812 6TH AVE NW | 2026-07-06 |
| 353 NW 79TH ST | 2026-06-11 |
| 910 15TH AVE | 2026-04-13 |
| 903 NW 60TH ST | 2025-12-30 |
| 8316 MARY AVE NW | 2025-10-22 |
| 8318 MARY AVE NW | 2025-10-22 |
| 1400 31ST AVE | 2025-07-14 |
| 8863 MIDVALE AVE N | 2025-07-10 |
| 8849 MIDVALE AVE N | 2025-07-10 |
| 2201 NW 63RD ST | 2025-05-19 |
93 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $70,000, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
157 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7158783-EL | 2026-08-19 | Electrical | 2415 MONTAVISTA PL W | Underground conduits between HH and house | |
| 7158311-EL | 2026-08-15 | Electrical | 7740 18TH AVE NE | Water heater circuit converted to EV, add bath GFCI, relocate washer and dryer | |
| 7158103-EL | 2026-08-13 | Electrical | 2415 MONTAVISTA PL W | Temp power pole and feeder conduits | |
| 7155873-EL | 2026-07-30 | Electrical | 3238 34TH AVE W | East bldg B townhomes. See permit 7153572-EL for west townhomes including site service. | $0 |
| 7153572-EL | 2026-07-30 | Electrical | 3236 34TH AVE W | Wiring new construction 4 townhomes (2 duplexes) [7/30/26 KEF - Plan set approved, west building A including site service. See permit 7155873 for east bldg B.] | $68,000 |
| 7148148-EL | 2026-07-06 | Electrical | 7812 6TH AVE NW | Wiring new 3 unit townhomes [7/6/26 KEF - Plan set approved.] | $50,000 |
| 7147341-EL | 2026-06-11 | Electrical | 353 NW 79TH ST | Wiring new 4 unit Townhouses | $70,000 |
| 7143525-EL | 2026-05-15 | Electrical | 3236 34TH AVE W | Running conduits for feeders, low volt, and EV | |
| 7138039-EL | 2026-04-13 | Electrical | 910 15TH AVE | Unit 910A, run new circuit to range, upgrading range from 40 to 50 amp | |
| 7134129-EL | 2026-03-19 | Electrical | 3236 34TH AVE W | Temp power pole | |
| 7129537-EL | 2026-02-16 | Electrical | 7812 6TH AVE NW | Underground conduits and Ufer | |
| 7126383-EL | 2026-01-25 | Electrical | 353 NW 79TH ST | Feeder pipes for townhomes[2/2/2026 JBC Changed Address to 353 NW 79th Street from 7812 6th Ave NW] | |
| 7124924-EL | 2026-01-14 | Electrical | 7812 6TH AVE NW | temp power and UFER[2/18/2026 JBC Temp power pole moved added 2nd temp power to permit for moved temp pole] | |
| 7123126-EL | 2025-12-30 | Electrical | 903 NW 60TH ST | Ufer inspection | $1 |
| 7110180-EL | 2025-10-22 | Electrical | 8316 MARY AVE NW | West townhouses including service. [10/22/25 KEF - Plan set approved. See 7113075-EL for east townhouses.] | $68,000 |
| 7113075-EL | 2025-10-22 | Electrical | 8318 MARY AVE NW | East townhouses. [10/22/25 KEF - See 7110180-EL for west townhouses including service.] | $0 |
| 7100237-EL | 2025-08-06 | Electrical | 903 NW 60TH ST | Wiring new construction SFR B (NE SFR) | $10,000 |
| 7100241-EL | 2025-08-06 | Electrical | 903 NW 60TH ST | Wiring new construction DADU (SE Structure) | $10,000 |
| 7100238-EL | 2025-08-06 | Electrical | 903 NW 60TH ST | Wiring new construction SFR C (SW SFR) | $10,000 |
| 7100236-EL | 2025-08-06 | Electrical | 903 NW 60TH ST | Wiring new construction SFR A (NW SFR) | $10,000 |
| 7095989-EL | 2025-07-14 | Electrical | 1400 31ST AVE | Installing new service, new panel, kitchen rewire | $8,000 |
| 7092662-EL | 2025-07-10 | Electrical | 8863 MIDVALE AVE N | Wiring new construction 6 townhomes | $62,000 |
| 7092671-EL | 2025-07-10 | Electrical | 8849 MIDVALE AVE N | Wiring new construction 6 townhomes | $62,000 |
| 7092031-EL | 2025-06-18 | Electrical | 910 15TH AVE | Ufer testing | $1 |
| 7086796-EL | 2025-05-19 | Electrical | 2201 NW 63RD ST | Taking down/ reinstalling exterior lights. For all 9 units. Re-supporting service pipes. (Siding being replaced) | $1,000 |
| 7080936-EL | 2025-04-15 | Electrical | 9235 RENTON AVE S | Swapped an old fused panel to a newer updated panel and added a new circuit for a bathtub [C.Kenefick 4/18/2025 - fees adjusted to reflect 100a service and dedicated circuit. Post | $1 |
| 7079977-EL | 2025-04-09 | Electrical | 8316 MARY AVE NW | Piping feeders and low volt | $1 |
| 7076836-EL | 2025-03-21 | Electrical | 8316 MARY AVE NW | Ufer inspection, 2 buildings, 2 spots per building | $1 |
| 7076430-EL | 2025-03-20 | Electrical | 2115 WESTLAKE AVE N | Ran a dedicated circuit for a service plug and for an a/c disconnect | $1 |
| 7076422-EL | 2025-03-20 | Electrical | 2115 WESTLAKE AVE N | Ran a dedicated circuit for a service plug and for a/c disconnect unit #402 | $1 |
| 7074357-EL | 2025-03-08 | Electrical | 1014 NE 80TH ST | Ran power to an A/C pump | $1 |
| 7074189-EL | 2025-03-07 | Electrical | 910 15TH AVE | Wiring new construction SFR 4 | $12,000 |
| 7074190-EL | 2025-03-07 | Electrical | 910 15TH AVE | Wiring new construction SFR 5 | $12,000 |
| 7074196-EL | 2025-03-07 | Electrical | 1907 5TH AVE W | Wiring new construction SFR | $25,000 |
| 7071839-EL | 2025-02-23 | Electrical | 903 NW 60TH ST | Running underground raceways | $1,000 |
| 7070547-EL | 2025-02-13 | Electrical | 2931 39TH AVE SW | Wiring new construction DADU | $10,000 |
| 7070524-EL | 2025-02-13 | Electrical | 3913 S ANGEL PL | Running power to attic fan | $500 |
| 7070531-EL | 2025-02-13 | Electrical | 4221 GREENWOOD AVE N | Running power to heat pump | $800 |
| 7070546-EL | 2025-02-13 | Electrical | 2931 39TH AVE SW | Wiring new construction SFR with ADU | $15,000 |
| 7070548-EL | 2025-02-13 | Electrical | 910 15TH AVE | Wiring new construction SFR 1 | $10,000 |
| 7070550-EL | 2025-02-13 | Electrical | 910C 15TH AVE | Wiring new construction SFR 3 | $10,000 |
| 7070549-EL | 2025-02-13 | Electrical | 910B 15TH AVE | Wiring new construction SFR 2 | $10,000 |
| 7068507-EL | 2025-02-03 | Electrical | 9047 DIBBLE AVE NW | Wiring new construction SFR with AADU | $18,000 |
| 7068518-EL | 2025-02-03 | Electrical | 9047 DIBBLE AVE NW | Wiring new construction DADU | $12,000 |
| 7066187-EL | 2025-01-20 | Electrical | 851 NE 97TH ST | Rewiring knob and tube throughout house | $15,000 |
| 7065795-EL | 2025-01-17 | Electrical | 2822 4TH AVE W | Running power to heat pump | $800 |
| 7063459-EL | 2025-01-04 | Electrical | 8849 MIDVALE AVE N | Underground raceways | $1,000 |
| 7062865-EL | 2024-12-30 | Electrical | 8849 MIDVALE AVE N | Ufer inspection | $1 |
| 7062548-EL | 2024-12-26 | Electrical | 3719 29TH AVE W | Ufer inspection only | $1 |
| 7060528-EL | 2024-12-11 | Electrical | 8863 MIDVALE AVE N | Running underground raceways | $1,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
