COMPANY RECORD · SEATTLE, WA
Paragon Electrical Contracting — permit history in Seattle, WA
Paragon Electrical Contracting appears on 40 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 40 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 3 |
| 2016 | 3 |
| 2017 | 3 |
| 2018 | 3 |
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 4 |
| 2022 | 7 |
| 2023 | 2 |
| 2025 | 4 |
| 2026 | 4 |
Busiest year on record: 2022, with 7 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 707 NW 120TH ST | 2026-06-30 |
| 705 NW 120TH ST | 2026-06-30 |
| 11820 8TH AVE NW | 2026-06-22 |
| 2718 11TH AVE E | 2026-02-16 |
| 11441 69TH PL S | 2025-10-19 |
| 114 N 42ND ST | 2023-08-18 |
| 12304 32ND AVE NE | 2022-12-19 |
| 11741 14TH AVE NE | 2022-12-05 |
| 1110 8TH AVE | 2022-11-30 |
| 9023 ROOSEVELT WAY NE | 2022-07-14 |
| 3027 NW 70TH ST | 2022-07-14 |
| 9283 44TH AVE SW | 2021-08-10 |
| 524 BOYLSTON AVE E | 2021-04-23 |
| 6506 2ND AVE NW | 2021-01-15 |
32 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $45,000, median $3,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
40 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7150732-EL | 2026-06-30 | Electrical | 707 NW 120TH ST | Wire new SFR. this is part of a 3-home ULS project. the Primary plan review permit is 7145674-EL | |
| 7150737-EL | 2026-06-30 | Electrical | 705 NW 120TH ST | Remodel Existing SFR and Wire New Detached Garage. This is part of a 3-home ULS project. the primary Plan review permit is 7145674-EL | |
| 7145674-EL | 2026-06-22 | Electrical | 11820 8TH AVE NW | Wire New SFR1. This is a ULS project with 3 related homes. This building includes the service equipment for 2 other building permits on adjacent property addresses. one of those bu | $45,000 |
| 7129455-EL | 2026-02-16 | Electrical | 2718 11TH AVE E | wiring a new bathroom on main floor. cable style floor heat. add necessary receptacles/switches on new/exposed walls in adjacent room. swap the three 6" recessed cans in existing p | |
| 7117633-EL | 2025-11-20 | Electrical | 2718 11TH AVE E | Add new bathroom and relocate laundry , both adjacent to top floor guest bedroom[CF 2/18/2026 - This permit is for upstairs remodel. See permit 7129455-EL for downstairs remodel] | $3,000 |
| 7112495-EL | 2025-10-19 | Electrical | 11441 69TH PL S | new 1500 sq ft SFR | $19,000 |
| 7098231-EL | 2025-07-24 | Electrical | 11441 69TH PL S | Ufer inspection | $400 |
| 7092244-EL | 2025-06-19 | Electrical | 11441 69TH PL S | Overhead temporary power pole for SFR | $1,000 |
| 6981741-EL | 2023-08-18 | Electrical | 114 N 42ND ST | <125 amp temp service | $500 |
| 6980254-EL | 2023-08-09 | Electrical | 114 N 42ND ST | Temp service Remove old 3rd story and build a new taller one- includes rewiring in basement and other necessary areas New Service | $30,000 |
| 6939310-EL | 2022-12-19 | Electrical | 12304 32ND AVE NE | add switches and wiring into walls partitioning a large space into 2 smaller office size spaces. Relocate 4 troffer lights. | $3,000 |
| 6936874-EL | 2022-12-05 | Electrical | 11741 14TH AVE NE | New SFR and DADU | $38,000 |
| 6936287-EL | 2022-12-01 | Electrical | 11741 14TH AVE NE | Ufer for SFR and seperate DADU | $150 |
| 6927106-EL | 2022-11-30 | Electrical | 1110 8TH AVE | 10-27-22 BZ Note: Maintenance Issue. Per Electrical Contractor only replacing Generator, like in kind. Controls may need updated. Subject to Field Inspections. All other Electric | $19,900 |
| 6933836-EL | 2022-11-15 | Electrical | 11741 14TH AVE NE | Temporary service | $500 |
| 6911141-EL | 2022-07-14 | Electrical | 9023 ROOSEVELT WAY NE | Remove 2 walls that were separating 2 bedrooms from the living room. add 2 plugs on exposed wall sections. relocate 2 wall heaters. add 3 light locations and 1 3-way switch locat | $5,000 |
| 6911142-EL | 2022-07-14 | Electrical | 3027 NW 70TH ST | Wiring and outlet for 32a min ckt hvac unit, max breaker 40a | $1,500 |
| 6852636-EL | 2021-08-10 | Electrical | 9283 44TH AVE SW | New SFR . approx 1000sq ft, Lake, 8/13/2021, address changed from 9238 to 9283, fee added. will need one EV ready spot. | $9,000 |
| 6837062-EL | 2021-05-05 | Electrical | 9283 44TH AVE SW | Ufer, single family | $100 |
| 6835014-EL | 2021-04-23 | Electrical | 524 BOYLSTON AVE E | Maintenance repair/rewire unit 409 - fire damage within an individual unit, approx 520sq ft. 7/26/2022 renewal PEM | $6,000 |
| 6818964-EL | 2021-01-15 | Electrical | 6506 2ND AVE NW | Rewire entry, main floor stairwell and entire 2nd floor (upstairs). New service panel relocated out of lower stairwell in basement floor heat in upper bathroom | $12,000 |
| 6806033-EL | 2020-10-18 | Electrical | 2120 N 61ST ST | Service change | $3,000 |
| 6798227-EL | 2020-08-27 | Electrical | 1625 19TH AVE | 2 walls were removed to create 1 room out of 3 rooms. the doorway into the middle room was filled in and an outlet was added. we also converted the switches at the 2 far rooms for | $1,000 |
| 6743635-EL | 2020-02-26 | Electrical | 418 E LORETTA PL | Revise and relocate existing 3ph overhead service to supply a new service for a new dwelling unit in basement and existing Elevator and Boiler loads | $14,000 |
| 6773428-EL | 2020-02-25 | Electrical | 1231 NE 100TH ST | Replace existing 100 amp panel | $2,500 |
| 6721433-EL | 2019-04-09 | Electrical | 418 E LORETTA PL | Add 60 amp meter and sub panel | $2,000 |
| 6720894-EL | 2019-04-05 | Electrical | 7008 46TH AVE S | Kitchen remodel/rewire | $4,000 |
| 6708525-EL | 2019-01-16 | Electrical | 1511 NE 91ST ST | Basement rewire | $5,400 |
| 6669227-EL | 2018-05-21 | Electrical | 1454 E HARRISON ST | New service drop to building | $0 |
| 6657429-EL | 2018-04-19 | Electrical | 930 31ST AVE S | REWIRE PORTIONS OF EXISTING BASEMENT ADU. RELOCATE FURNACE AND HOT WATER TANKS. ADD A/C UNIT AND MINI SPLIT | |
| 6639979-EL | 2018-01-14 | Electrical | 3120 37TH PL S | BASEMENT BATHROOM, MAIN FLOOR KITCHEN AND POWDER ROOM, 2ND FLOOR BATHROOM | |
| 6635264-EL | 2017-12-13 | Electrical | 4515 48TH AVE S | BASEMENT AND KITCHEN ALTERATION | |
| 6612291-EL | 2017-08-08 | Electrical | 3606 42ND AVE SW | FIRE RESTORATION... REWIRE HOUSE | |
| 6593214-EL | 2017-04-24 | Electrical | 4115 DAYTON AVE N | WIRE NEWLY FRAMED STORAGE AREA IN CRAWL SPACE, AND A SERVICE CHANGE | |
| 6560176-EL | 2016-10-05 | Electrical | 8333 55TH AVE NE | WIRE NEWLY FRAMED SPACE ABOVE POOL PUMP ROOM FOR BASIC LIGHTS, PLUGS AND A GOLF DRIVING SIMULATOR | |
| 6549679-EL | 2016-08-03 | Electrical | 2615 NE 75TH ST | ADD 3 HEATERS AND OTHER MISC EXTENSIONS TO EXISTING ELECTRICAL WORK IN BASEMENT | |
| 6542873-EL | 2016-06-27 | Electrical | 5657 16TH AVE SW | ADD A FLOOR IN CRAWL SPACE.... REWIRE EXPOSED PORTION OF MAIN HOUSE | |
| 6501403-EL | 2015-10-22 | Electrical | 702 31ST AVE S | REWIRE HOUSE RELOCATE MAIN PANEL FROM CLOSET INTO BEDROOM | |
| 6482121-EL | 2015-06-30 | Electrical | 7537 11TH AVE NE | REWIRE KITCHEN AREA , BASEMENT STORAGE, LAUNDRY AND NEW ADU | |
| 6479725-EL | 2015-06-16 | Electrical | 5701 RAINIER AVE S | ADDING CIRCUITS, OUTLETS AND A PHASE CONVERTER |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →