COMPANY RECORD · SEATTLE, WA
Pacific One Electric — permit history in Seattle, WA
Pacific One Electric appears on 52 Seattle permit records from 2018 through 2026, all of them electrical.
Business record held by the regulator
| Name as registered | PACIFIC ONE ELECTRIC LLC |
|---|---|
| Entity type | Limited Liability Company |
| State registration (UBI) | 604113902 |
| Business address on file | 12515 NE BEL RED ROAD Bellevue WA 98005 |
| Business phone on file | (425) 869-0373 |
| Licence number | PACIFOE836KQ |
| Licence type | ELECTRICAL CONTRACTOR |
| Specialty | GENERAL |
| Status in the register | ACTIVE |
| Expires | 2027-05-18 |
Read from L&I Contractor License Data - General, published by the Washington State Department of Labor & Industries; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Pacific One Electric by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 52 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2018 | 1 |
| 2019 | 8 |
| 2020 | 6 |
| 2021 | 12 |
| 2022 | 7 |
| 2023 | 6 |
| 2024 | 5 |
| 2025 | 6 |
| 2026 | 1 |
Busiest year on record: 2021, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5040 NICKLAS PL NE | 2026-09-30 |
| 2410 W MANOR PL | 2025-10-20 |
| 1000 1ST AVE W | 2025-08-14 |
| 620 5TH AVE W | 2025-07-09 |
| 2222 15TH AVE W | 2025-06-24 |
| 2302 E DENNY WAY | 2024-08-05 |
| 8829 ROOSEVELT WAY NE | 2024-04-03 |
| 2925 E MADISON ST | 2023-12-14 |
| 4508 CALIFORNIA AVE SW | 2023-07-06 |
| 355 15TH AVE | 2023-01-12 |
| 4509 42ND AVE SW | 2022-06-27 |
| 4732 BROOKLYN AVE NE | 2021-11-15 |
| 1901 E FIR ST | 2021-08-02 |
| 2000 4TH AVE | 2021-07-28 |
21 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $400 to $4,330,000, median $10,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Emerald Aire, Inc. | 5 | 2019–2025 |
| Puget Sound Solar | 5 | 2019–2024 |
| Pye-Barker Fire And Safety | 4 | 2019–2024 |
| Froula Alarm Systems, Inc. | 3 | 2021–2025 |
| Red Hawk Fire Protection | 3 | 2020–2025 |
| Guardian Security Systems Inc | 2 | 2020–2026 |
| Aaa Fire Protection | 2 | 2021–2025 |
| Structured Communications | 2 | 2018–2021 |
Companies that also appear in Seattle permit records at addresses where Pacific One Electric filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
52 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7165115-EL | 2026-09-30 | Electrical | 5040 NICKLAS PL NE | Add (2) 20 amp circuits and modify 1 for bathroom remodel. 1 bath is being split into 2. Adding tile heat and bidet. | |
| 7112521-EL | 2025-10-20 | Electrical | 2410 W MANOR PL | Update Devices and Protect Circuits As Needed in 24 Units. Replace existing living room baseboard heaters only with same wattage fan forced. | $15,000 |
| 7107490-EL | 2025-09-26 | Electrical | 2410 W MANOR PL | 24 Unit Building. Replace exiting 100 amp panels with new. Add washer dryer circuits to units. [9/26/25 KEF - Plan set approved.] | $60,000 |
| 7101609-EL | 2025-08-14 | Electrical | 1000 1ST AVE W | Replace non fused elevator disconnect with new fused disconnect. Replace old 100 amp house panel with new. Add 2 car charger circuits. | $4,000 |
| 7095274-EL | 2025-07-09 | Electrical | 620 5TH AVE W | Replace devices in the following units. 103,105,109,111, 205.206.208.207.210.211. | $5,000 |
| 7092823-EL | 2025-06-24 | Electrical | 2222 15TH AVE W | Install conduit and wire to 3 aqua stats in boiler room off existing circuits. | $1,600 |
| 7071276-EL | 2025-02-24 | Electrical | 620 5TH AVE W | Replace existing Federal Pacific unit panels and add washer dryer circuits to all 44 units [2/24/25 KEF - Plan set approved.] [2/27/26 KEF - First permit extension to 2/24/27.] | $120,000 |
| 7055850-EL | 2024-11-15 | Electrical | 1000 1ST AVE W | Replace all old unit panels to new. Add 26 washer and dryer circuits in existing 26 unit apartment [11/15/24 - BGO Fee OK; Approved Plan Set with Comments] | $73,000 |
| 7039265-EL | 2024-08-05 | Electrical | 2302 E DENNY WAY | Add washer and dryer curcuit in ubit 513 | $1,200 |
| 6988937-EL | 2024-04-15 | Electrical | 2222 15TH AVE W | Complete fire alarm installation [4/10/2024 PGF Added "get started" fee per contractor (Rich) request] | $165,000 |
| 7017895-EL | 2024-04-03 | Electrical | 8829 ROOSEVELT WAY NE | Heat Trace sprinkler wet pipe in garage | $8,500 |
| 7015668-EL | 2024-03-21 | Electrical | 2222 15TH AVE W | Make connections to material lift | $500 |
| 6991729-EL | 2023-12-14 | Electrical | 2925 E MADISON ST | Electrical installation for multi-family building. ndm renewal 11/14/24 [JS Issued Plan Set] [8/12/2025 BGO - Approved One Line Revision] [10/03/25 BGO - Approved Second Revision t | $2,440,000 |
| 6992091-EL | 2023-11-09 | Electrical | 2925 E MADISON ST | 600A temp service for construction power. [11/9/23 JSS 6648960-DM issued.]; [5/11/26 RN Closed permit, Temp Power Removed] | $10,000 |
| 6991551-EL | 2023-10-17 | Electrical | 2925 E MADISON ST | Ufer grounding ***CRANE GROUND***DLJ 10/27/23 | $500 |
| 6980813-EL | 2023-08-14 | Electrical | 2302 E DENNY WAY | Add a 20A Washer and 30A Dryer Circuit | $1,250 |
| 6973931-EL | 2023-07-06 | Electrical | 4508 CALIFORNIA AVE SW | 200A Temp service | $4,500 |
| 6922194-EL | 2023-01-12 | Electrical | 355 15TH AVE | Complete fire alarm system | $60,000 |
| 6924103-EL | 2022-09-22 | Electrical | 4508 CALIFORNIA AVE SW | Ufer ground | $500 |
| 6913537-EL | 2022-08-04 | Electrical | 2222 15TH AVE W | Temp power for construction | $15,000 |
| 6909810-EL | 2022-07-19 | Electrical | 4508 CALIFORNIA AVE SW | Complete electrical installation on multifamily building | $1,523,860 |
| 6907933-EL | 2022-06-27 | Electrical | 4509 42ND AVE SW | Temp power (7/7/2022 PGF Changed address from 4508 California Ave SW to 4505 42nd Ave SW). | $18,000 |
| 6869820-EL | 2022-04-15 | Electrical | 2222 15TH AVE W | New construction of a mid-rise 168-unit multifamily building with six levels above grade and one level of below grade parking. 4-15-22 DR APPROVED PLANS & ISSUED PERMIT. [3/30/2023 | $3,081,000 |
| 6877218-EL | 2022-03-19 | Electrical | 8829 ROOSEVELT WAY NE | New Fire Alarm [3/23/2023 PGF Renewed permit for 1-year] | $82,000 |
| 6882413-EL | 2022-02-10 | Electrical | 355 15TH AVE | Ufer Ground | $500 |
| 6852322-EL | 2021-11-15 | Electrical | 4732 BROOKLYN AVE NE | Electrical installation of Safeway portion of the building. | $1,225,000 |
| 6867713-EL | 2021-11-08 | Electrical | 355 15TH AVE | Overhead temp power service | $2,500 |
| 6848028-EL | 2021-08-26 | Electrical | 355 15TH AVE | 2-6-23 Revision Approved 50 unit apartment building, Lake, 1/27/2023, there will be another 200 amp panel installed for future retail space. | $845,000 |
| 6847113-EL | 2021-08-02 | Electrical | 1901 E FIR ST | PV Solar | $20,000 |
| 6842386-EL | 2021-07-28 | Electrical | 2000 4TH AVE | Hotel Electrical;TI Wiring 4 units and lobby lighting. 1 0th floor relocation of 4 panels, no changes. New branch circuitry in 4 units. Adding outlets and lighting to 127 units | $140,400 |
| 6845092-EL | 2021-06-23 | Electrical | 8829 ROOSEVELT WAY NE | Ufer Ground | $500 |
| 6828956-EL | 2021-06-18 | Electrical | 8829 ROOSEVELT WAY NE | 69 units with parking level 6-18-21 DWR Approved drawings and issued permit. 6-1-22 DR Renewed permit till 6-16-23. 5-17-23 DR - EXTENDED PERMIT FOR ONE YEAR. | $1,435,000 |
| 6844415-EL | 2021-06-18 | Electrical | 1901 E FIR ST | ufer test | $500 |
| 6844148-EL | 2021-06-17 | Electrical | 4732 BROOKLYN AVE NE | Ufer ground in NE corner of project | $400 |
| 6841649-EL | 2021-06-02 | Electrical | 8829 ROOSEVELT WAY NE | Temp power pole for construction | $3,000 |
| 6839768-EL | 2021-05-27 | Electrical | 4732 BROOKLYN AVE NE | Temporary power for construction of the building. 5/27/2021, JAS-Waived plan review, not required on temp services up to 600 amps under new 2020 Seattle Electrical Code; [4/29/26 R | $20,000 |
| 6808072-EL | 2021-02-03 | Electrical | 4732 BROOKLYN AVE NE | Complete electrical installation for new Mixed Use building. 2-3-21 DWR APPROVED DRAWINGS 6-18-21 DWR Transferred permit to Pacific 1. 1/5/2022 renewal. 1-12-23 DR - Renewed for o | $4,330,000 |
| 6807618-EL | 2020-10-27 | Electrical | 417 2ND AVE W | VRF control wiring | $5,000 |
| 6778123-EL | 2020-06-03 | Electrical | 1901 E FIR ST | 20 Unit Multi-family. 6-8-2020 BZ Revision Approved. | $395,000 |
| 6782668-EL | 2020-05-13 | Electrical | 815 NE 66TH ST | Ufer ground in footing | $800 |
| 6768305-EL | 2020-03-23 | Electrical | 815 NE 66TH ST | New multifamily electrical installation | $1,075,000 |
| 6777907-EL | 2020-03-23 | Electrical | 815 NE 66TH ST | Over head temp service 200; [4/29/26 RN Closed permit, Temp Power Removed] | $5,000 |
| 6758082-EL | 2020-01-15 | Electrical | 225 HARVARD AVE E | New 71 unit multifamily apartments | $1,010,600 |
| 6761707-EL | 2019-12-06 | Electrical | 225 HARVARD AVE E | 200 AMP Temp | $4,500 |
| 6751718-EL | 2019-12-06 | Electrical | 3010 1ST AVE | Electrical installation 60 multi-family apartments (10-30-19 DWR updated value from 180,000 to 1,100,000 per contractor.) 11-13-20 DWR extended permit till 2021. | $1,100,000 |
| 6760770-EL | 2019-12-02 | Electrical | 225 HARVARD AVE E | Temp power for construction | $8,500 |
| 6756843-EL | 2019-11-04 | Electrical | 225 HARVARD AVE E | Install Ufer Ground | $2,500 |
| 6755924-EL | 2019-10-29 | Electrical | 3010 1ST AVE | Install ufer ground on north side of project in electrical room | $700 |
| 6746510-EL | 2019-09-12 | Electrical | 3010 1ST AVE | Temporary power for construction | $6,500 |
| 6744061-EL | 2019-08-19 | Electrical | 838 NE 66TH ST | Furnish & Install metal clad wires between indoor & outdoor Mini Splits on L1. | $500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 52 permits above are a static record through 2026. Select a year above to open that year’s records, or search Pacific One Electric in Seattle, WA by address, trade or date range.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
