COMPANY RECORD · SEATTLE, WA
North Electro Service — permit history in Seattle, WA
North Electro Service appears on 164 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 164 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 9 |
| 2016 | 3 |
| 2017 | 13 |
| 2018 | 16 |
| 2019 | 9 |
| 2020 | 13 |
| 2021 | 15 |
| 2022 | 26 |
| 2023 | 20 |
| 2024 | 24 |
| 2025 | 9 |
| 2026 | 7 |
Busiest year on record: 2022, with 26 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3210 S DEARBORN ST | 2026-08-12 |
| 6549 CHAPIN PL N | 2026-05-28 |
| 6300 SAND POINT WAY NE | 2026-05-13 |
| 607 MAYNARD AVE S | 2026-05-05 |
| 107 27TH AVE E | 2026-04-06 |
| 10028 12TH AVE NW | 2026-03-18 |
| 654 NW 53RD ST | 2026-03-05 |
| 526 1ST AVE S | 2025-12-15 |
| 214 E BOSTON ST | 2025-12-05 |
| 3330 NE 65TH ST | 2025-10-30 |
| 13316 15TH AVE NE | 2025-10-20 |
| 2622 ALKI AVE SW | 2025-07-31 |
| 4750 UNIVERSITY WAY NE | 2025-07-31 |
| 6232 38TH AVE NE | 2025-07-07 |
141 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $45,000, median $3,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
164 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7157874-EL | 2026-08-12 | Electrical | 3210 S DEARBORN ST | extension 300+ Sq.F and total remodel is 700Sq F | |
| 7145267-EL | 2026-05-28 | Electrical | 6549 CHAPIN PL N | car chager sasha | |
| 7142895-EL | 2026-05-13 | Electrical | 6300 SAND POINT WAY NE | Kitchen remodel, adding lights and two smock detectors. Mybe panel replacement later, it's included in permit. | |
| 7141554-EL | 2026-05-05 | Electrical | 607 MAYNARD AVE S | Relocate 20 line voltage battery back up smock detectors in 10 apartments. Access to the building #000 from intercom to manager. | |
| 7136918-EL | 2026-04-06 | Electrical | 107 27TH AVE E | Car charger | |
| 7133891-EL | 2026-03-18 | Electrical | 10028 12TH AVE NW | Kitchen remodel, adding subpanel | |
| 7132230-EL | 2026-03-05 | Electrical | 654 NW 53RD ST | New DADU , new build all electrical. (GOITJ 4-20-2026) | |
| 7121162-EL | 2025-12-15 | Electrical | 526 1ST AVE S | Three circuits for kitchen nook. | $2,300 |
| 7090817-EL | 2025-12-05 | Electrical | 214 E BOSTON ST | Power for power pump [12/4/25 KEF - Plan set approved.] | $6,000 |
| 7114350-EL | 2025-10-30 | Electrical | 3330 NE 65TH ST | Dental office unit 108. Construction permit 7096301-CN | $5,800 |
| 7112501-EL | 2025-10-20 | Electrical | 13316 15TH AVE NE | Upgrade garage, car charger, receptacles, lights | $20,000 |
| 7101528-EL | 2025-08-13 | Electrical | 214 E BOSTON ST | Sub permit to cover the ditch. We laydown PVC conduit for heating circuit to the water tank. #7090817-EL | $800 |
| 7099288-EL | 2025-07-31 | Electrical | 2622 ALKI AVE SW | Three exit signs | $600 |
| 7099287-EL | 2025-07-31 | Electrical | 4750 UNIVERSITY WAY NE | Remodel tea store | $23,000 |
| 7094864-EL | 2025-07-07 | Electrical | 6232 38TH AVE NE | Total rewiring | $20,000 |
| 7068547-EL | 2025-02-03 | Electrical | 824 NW 54TH ST | remodel bathroom upstairs and bedroom, Six lights kitchen, deck receptacle. | $4,500 |
| 7061763-EL | 2024-12-18 | Electrical | 4022 41ST AVE SW | New floor heating circuits. | $2,000 |
| 7058743-EL | 2024-12-01 | Electrical | 3606 49TH AVE SW | Dining addition and kitchen upgrading | $2,000 |
| 7057533-EL | 2024-11-21 | Electrical | 3606B 49TH AVE SW | AADU & DADU [C.Kenefick 1/15/25 - ufer test fee added to permit.] | $20,000 |
| 7056598-EL | 2024-11-15 | Electrical | 4446 45TH AVE SW | Rewiring old house | $10,000 |
| 7054376-EL | 2024-11-02 | Electrical | 5601 21ST AVE SW | Art studio addition, sub panel | $2,000 |
| 7053486-EL | 2024-10-28 | Electrical | 12057 3RD AVE NE | Relocate service entrance. New feeder to old house. [C.Kenefick 11/8/2024 - No plan review required per D.Rankin. There are three permits: 7050912 = SF, 7050913 = ADU at SF, 70534 | $1,000 |
| 7050913-EL | 2024-10-14 | Electrical | 12057 3RD AVE NE | ,AADU, HVAC control cable14x4 [C.Kenefick 11/8/2024 - No plan review required per D.Rankin. There are three permits: 7050912 = SF, 7050913 = ADU at SF, 7053486 = existing house | $10,000 |
| 7050912-EL | 2024-10-14 | Electrical | 12057 3RD AVE NE | SFR, HVAC control cables [C.Kenefick 11/8/2024 - No plan review required per D.Rankin. There are three permits: 7050912 = SF, 7050913 = ADU at SF, 7053486 = existing house now be | $10,000 |
| 7050656-EL | 2024-10-10 | Electrical | 2016 NE 65TH ST | install new range circuit | $800 |
| 7049619-EL | 2024-10-05 | Electrical | 906 N 74TH ST | Zinsco panel and feeder wire replacement for apartments #1,#2,#3 located at first floor. | $1,000 |
| 7048681-EL | 2024-09-30 | Electrical | 4411 WOODLAND PARK AVE N | Apt #4 panel replacement | $1,000 |
| 7046615-EL | 2024-09-17 | Electrical | 4446 45TH AVE SW | Temp power | $800 |
| 7046099-EL | 2024-09-16 | Electrical | 426 S MASSACHUSETTS ST | Connect three walking cooler/freezers and icemaker. | $1,000 |
| 7027731-EL | 2024-05-29 | Electrical | 8209 31ST AVE NE | New service and addition. [C.Kenefick 11/21/24 - fees for 16 dedicated applicance circuits and one EV charger added to permit.] | $5,000 |
| 7023177-EL | 2024-05-03 | Electrical | 2920 EASTLAKE AVE E | Bathroom floor heater, adding up to three receptacles | $2,000 |
| 7020272-EL | 2024-04-17 | Electrical | 702 N 86TH ST | Unfinish basement wiring | $8,000 |
| 7017337-EL | 2024-03-31 | Electrical | 522 25TH AVE | Rewiring | $10,000 |
| 7016023-EL | 2024-03-24 | Electrical | 6513 11TH AVE NW | Total rewiring and new service. | $15,000 |
| 7016022-EL | 2024-03-24 | Electrical | 118 NW 83RD ST | total rewiring only | $15,000 |
| 7014553-EL | 2024-03-15 | Electrical | 3221 27TH AVE W | Wiring[12/23/2024 JBC Added Feeder to permit.] | $28,000 |
| 7012375-EL | 2024-03-04 | Electrical | 2522 E CHERRY ST | Rewiring | $15,000 |
| 7011877-EL | 2024-02-28 | Electrical | 3607 32ND AVE W | New Construction wiring SFR, ADU & DADU | $40,000 |
| 7011076-EL | 2024-02-23 | Electrical | 426 S MASSACHUSETTS ST | Wiring for kitchen hood, dough mixer, dishwasher and outlets. | $15,000 |
| 7008061-EL | 2024-02-06 | Electrical | 1516 29TH AVE | total rewiring, with existing service | $9,800 |
| 7001759-EL | 2023-12-20 | Electrical | 10515 11TH AVE NW | Total rewiring | $20,000 |
| 6997319-EL | 2023-11-21 | Electrical | 3039 36TH AVE W | Panel replacement | $2,000 |
| 6993704-EL | 2023-10-30 | Electrical | 6506 4TH AVE NE | Replace three panels up to 125 Amp | $5,000 |
| 6992158-EL | 2023-10-20 | Electrical | 515 WESTLAKE AVE N | Removing cashier desk. Removing the receptacles and circuits from old place and using existing receptacle for cashier at the new place. | $2,000 |
| 6992159-EL | 2023-10-20 | Electrical | 3425 32ND AVE W | Kitchen remodel, adding sub panel | $9,800 |
| 6990067-EL | 2023-10-08 | Electrical | 349 N 72ND ST | Unfinished basement-wiring | $5,000 |
| 6982627-EL | 2023-08-24 | Electrical | 6504 4TH AVE NE | Panel replacement [C.Kenefick 9/8/23- Service panel locations OK; these are panel swaps only.] | $1,500 |
| 6980641-EL | 2023-08-11 | Electrical | 9516 15TH AVE NE | Rewiring and service | $10,000 |
| 6973048-EL | 2023-06-29 | Electrical | 545 19TH AVE | Car charger and light | $1,000 |
| 6973049-EL | 2023-06-29 | Electrical | 4301 UNIVERSITY WAY NE | Outdoor light and sign | $3,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
