COMPANY RECORD · SEATTLE, WA

Lin R. Rogers Electrical Contractors, Inc — permit history in Seattle, WA

Lin R. Rogers Electrical Contractors, Inc appears on 273 Seattle permit records from 2018 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical273100%

Activity by year

YearPermits issued
201847
201927
202050
202143
202223
202329
202415
202520
202619

Busiest year on record: 2020, with 50 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2651 NE 49TH ST2026-08-26
11616 AURORA AVE N2026-07-27
2700 RAINIER AVE S2026-07-24
2701 UTAH AVE S2026-07-09
1001 4TH AVE2026-06-11
7345 DELRIDGE WAY SW2026-06-03
12525 AURORA AVE N2026-05-22
4622 25TH AVE NE2026-04-30
4825 RAINIER AVE S2026-04-27
100 W MERCER ST2026-03-16
302 NE NORTHGATE WAY2026-03-11
1112 S BAILEY ST2026-03-11
3601 STONE WAY N2025-08-04
915 NW 45TH ST2025-07-28

118 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $177,300, median $2,264. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

273 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7159940-EL2026-08-26Electrical2651 NE 49TH STApple - Pull (2) circuits per network and service rack dedicated home run, 30-amp breaker each. Install (6) new receptacles.
7155031-EL2026-07-27Electrical11616 AURORA AVE NHome Depot - Disconnect hardwired lights from 12-007, 40 odd & even. Install quads behind 12-EC1, 40-EC1, and 41-EC1.
7154768-EL2026-07-24Electrical2700 RAINIER AVE SLowes - Install (1) receptacle on aisle 60 Bay 10.
7152167-EL2026-07-09Electrical2701 UTAH AVE SHome Depot - Disconnect lights in aisle 27 (even) and aisle 28 (odd). Install 2 quads behind 28-EC1.
7145812-EL2026-06-11Electrical1001 4TH AVEReplacing 13 existing lighting fixtures [6/11/26 KEF - Plan set approved.]$25,000
7145998-EL2026-06-03Electrical7345 DELRIDGE WAY SWHome Depot - Disconnect electrical in bay 33-005 and install quads in Revolve bays 33-001, 33-003, 33-005, 33-EC1.
7144529-EL2026-05-22Electrical12525 AURORA AVE NLowes - Relocate and drop power in aisles 5 and 6
7139950-EL2026-04-30Electrical4622 25TH AVE NEExterior lighting upgrade for the Bank of America ATM [4/30/26 BGO - Approved Outdoor Lighting Plan Set] Replace 17 existing fixtures and add 3 new fixtur$30,000
7139250-EL2026-04-27Electrical4825 RAINIER AVE SExterior lighting upgrade for the Bank of America ATM Removing and patching 1 fixture and replacing 40 existing fixtures [4/27/26 BGO - Plan Review waived for this lighting p$45,000
7139542-EL2026-04-22Electrical2700 RAINIER AVE SLowes - Relocate and drop power in aisles 2 and 3.
7137614-EL2026-04-09Electrical2700 RAINIER AVE SLowes - place UPS2 circuit on "Dirty" power.
7134364-EL2026-03-20Electrical2701 UTAH AVE SDisconnect then reconnect electrical in bay ID 35-008.
7133580-EL2026-03-16Electrical100 W MERCER STReplacing 21 exterior light fixtures and removing and patching 2.
7133017-EL2026-03-11Electrical302 NE NORTHGATE WAYInstall (2) power drops. Connect to existing 24 hour power.
7132953-EL2026-03-11Electrical1112 S BAILEY STExterior lighting upgrade adding 10 new fixtures and replacing 25 existing fixtures.
7129211-EL2026-02-13Electrical2701 UTAH AVE SHelp reset team to install the new Millwork desk. New desk will need power and data. [4] IS Quads [2 circuits] 4 data lines
7128939-EL2026-02-11Electrical7345 DELRIDGE WAY SWBay ID: 09-014, 13-017, 23-011 add quad 13-015 for rope burner Refer to the bay ID's above. Need to reconnect or install based off of the specific scope. If fixtures are not able
7125043-EL2026-01-15Electrical2701 UTAH AVE S
7123922-EL2026-01-07Electrical7345 DELRIDGE WAY SWDisconnect / Reconnect power and data per THD provided plan. One Gallon Shakers get a dedicated circuit with duplex receptacle, Five Gallon shakers get a dedicated circuit with dup$1
7122714-EL2025-12-26Electrical2701 UTAH AVE SBay ID: 13-023, 14-003, 43-014 Refer to the bay ID's above. Need to reconnect or install based off of the specific scope. If fixtures are not able to be found, install a quad in th$5,620
7106714-EL2025-09-15Electrical11616 AURORA AVE NBay IDs: 07-017 & 07-019 Rogers will disconnect and then reconnect all electrical including lights, conduit, junction boxes, mc cable, straps, and anything else in these bays as we$2,625
7105777-EL2025-09-09Electrical7345 DELRIDGE WAY SWRogers will be installing 3] commercial registers [2] tool rental registers [3] Pro registers [1] pro desk [7] self checkout registers [5] customer service registers [4] garden re$177,300
7098363-EL2025-08-04Electrical3601 STONE WAY NRemove and replace 17 fixtures.$26,000
7098638-EL2025-07-28Electrical915 NW 45TH STInstall up to three 120v Duplexes from closest available.$1,014
7098276-EL2025-07-25Electrical13000 LAKE CITY WAY NEInstall up to three 120v Duplexes from closest available.$1,014
7098120-EL2025-07-24Electrical100 NW 85TH STInstall up to three 120v Duplexes from closest available.$1,014
7092581-EL2025-06-23Electrical2676 NE UNIVERSITY VILLAGE STRogers will be relocating power from previous Gondola(shelf) locations to new specified locations. Demolishing (10) un-used floor boxes. Adding (7) new floor boxes. Old boxes are b$27,000
7088496-EL2025-05-30Electrical6330 35TH AVE SWInstall a 120V 20A duplex receptacle mounted 1'-6" A.F.F connected to a dedicated 20A, 1-Pole circuit breaker mounted in Panel LP-3 for Rx refrigerator.$2,415
7083884-EL2025-05-05Electrical13010 AURORA AVE NRogers will run 3 new 208V circuits to produce area and install 3 drop cords. (2) with neutral, (1) without. See drawing for specifics on cord locations. (1) existing cases will be$8,646
7077885-EL2025-03-28Electrical915 NW 45TH STRogers will run customer provided Speaker Wire from the back of house amp to the two speakers on the sales floor, daisy chain if possible.$800
7076988-EL2025-03-24Electrical2701 UTAH AVE SBay ID's: 12-EC2 - Refer to the bay ID's above. Need to reconnect or install based off of the specific scope. If fixtures are not able to be found, install a quad in the bay.$2,420
7073653-EL2025-03-05Electrical6314 7TH AVE SScope: Install 2 building mounted RSU's that require constant power. Both RSU's will have 2 cameras already mounted . You will need to extend 2 cameras and 1 speaker for each unit $25,000
7069939-EL2025-02-11Electrical7345 DELRIDGE WAY SWWe will need to disconnect and remove the lights in the specified bays and remove the fixtures. We also will need to install 4 quads on the back uprights at about 130" in the flu s$2,775
7069377-EL2025-02-07Electrical2700 RAINIER AVE SDisconnect and Reconnect Power to Customer Service and Front End. Circuits: 4-6 Receptacles: 30 No Bays just furniture, registers$13,012
7069018-EL2025-02-05Electrical210 W MERCER STScope: Install 1 New 120v dedicated circuit from the closest EC Panel to the location of the new desk, typically location of the desk is in the Dining Room.$1,250
7066994-EL2025-01-24Electrical7345 DELRIDGE WAY SWScope: Night 1 & 2: ****DO NOT JUST CUT THE WIRES TO THE DISPLAYS****** Make electrical disconnects needed per the reset team. Reset will be taking place in aisles 41-45 & 01-05 $10,900
7065594-EL2025-01-16Electrical7345 DELRIDGE WAY SWScope: Will return with Lift to replace 15 Lamps and Ballasts, with LED Ballast (parking lot lighting)$5,639
7065582-EL2025-01-16Electrical2701 UTAH AVE SScope: Will return with Lift to replace 12 Lamps and Ballasts, with LED Ballast. (parking lot lighting)$4,782
7064001-EL2025-01-08Electrical11616 AURORA AVE NScope: Will return with Lift to replace 9 Lamps and Ballasts, with LED Ballast Bypass Lamps. (parking lot lighting)$3,703
7061512-EL2024-12-18Electrical7345 DELRIDGE WAY SWInstall dirty power(24hour) duplexes for locking cart equipment$11,500
7060275-EL2024-12-16Electrical4825 RAINIER AVE SExterior lighting upgrade for the Bank of America. Adding one new fixture, replacing 41 existing fixtures and adding one new pole and its fixture. [12/16/24 BGO - Fee OK; Plan Rev$74,000
7057639-EL2024-11-21Electrical1700 7TH AVEExterior Lighting upgrade adding 4 new fixtures and replacing 18 existing fixtures.$30,000
7057648-EL2024-11-21Electrical404 N 85TH STExterior Lighting Upgrade - Add 4 new fixtures and replace 18 existing fixtures.$34,000
7053571-EL2024-10-29Electrical11616 AURORA AVE NScope: After confirmation that rack has been shut down, we will need to disconnect the existing UPS. Schneider will then remove the existing UPS and replace with the new one. Once $2,950
7041777-EL2024-08-20Electrical330 NE NORTHGATE WAYComplete transformation items listed below. GC to set phasing. Data scope to run concurrently with electrical Included in Reset Scope: LG CD Max Endcap Tablet Category Crea$33,707
7041578-EL2024-08-19Electrical9000B RAINIER AVE SCONVERT DUPLEX TO QUAD-plug in cords when conversion is done$794
7027440-EL2024-05-29Electrical11616 AURORA AVE NInstall dirty power(24hour) duplexes for locking cart equipment.$11,500
7020720-EL2024-04-19Electrical330 NE NORTHGATE WAYReconnect new fixtures following prototypical power installation$6,790
7014812-EL2024-03-18Electrical2651 NE 49TH STInstall a quadplex 18" from the ground flush in wall for the workstation.$4,275
7011007-EL2024-02-23Electrical1300 E MADISON STIn association with permit Number 6975952-CN. Exterior lighting upgrade. Scope of work includes replacing 26 fixtures removing 1 fixture and adding 1 new pole and its fixture.$75,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →