COMPANY RECORD · SEATTLE, WA

Ion Customs Inc. — permit history in Seattle, WA

Ion Customs Inc. appears on 31 Seattle permit records from 2021 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical31100%

Activity by year

YearPermits issued
20213
20225
20232
20247
20259
20265

Busiest year on record: 2025, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
7541 23RD AVE NW2026-07-14
3900 W HOOKER ST2026-07-13
7721 57TH AVE NE2026-06-18
4416 6TH AVE NW2026-03-02
6247 44TH AVE NE2025-09-18
5233 28TH AVE S2025-05-30
1115 23RD AVE E2025-05-29
202 NW 43RD ST2025-04-25
4930 25TH AVE S2025-04-16
3303 35TH AVE S2024-10-14
734 N 82ND ST2024-06-25
2310 NW 90TH ST2024-06-03
1921 EDGEMONT PL W2024-04-30
2815 NW 77TH ST2024-02-02

21 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $60,000, median $10,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

31 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7153063-EL2026-07-14Electrical7541 23RD AVE NWSimple good ol fashion 200amp temp pole to start framing on addition to main home. Addition is in footprint of service drop, as well as service location will be relocated.
7150208-EL2026-07-13Electrical3900 W HOOKER ST11.5kw solar system with battery backup. [7/13/26 BGO - Approved PV Plan Set]$19,200
7149058-EL2026-06-18Electrical7721 57TH AVE NESimple 1.92kWAC Solar system, no backup.
7147051-EL2026-06-08Electrical3900 W HOOKER STSwapping out an old string Inverters to a new franklin system including battery storage.
7131439-EL2026-03-02Electrical4416 6TH AVE NWWhole house remodel. House got lifted and extended.
7107472-EL2025-09-18Electrical6247 44TH AVE NENew construction top floor bedrooms and bathrooms new construction for half main floor with kitchen living room remodel the other half. Sub panel for new circuits although NOT remo$45,000
7102036-EL2025-08-17Electrical4416 6TH AVE NWTemp pole needed for safety. Main house is about to be lifted.$2,500
7102037-EL2025-08-17Electrical4416 6TH AVE NWUfer before concrete$1
7088576-EL2025-05-30Electrical5233 28TH AVE SReworking kitchen layouts main house main floor. Also adding oven circuit.$7,000
7088308-EL2025-05-29Electrical1115 23RD AVE EUfer[8/14/2025 JBC Added Ufer Test to permit]$100
7082591-EL2025-04-25Electrical202 NW 43RD STContractor built out the dining room reworked existing general circuit for lighting. New homerun for outlet dedicated circuit. Ran additional circuit for future in wall heaters in $3,000
7081089-EL2025-04-16Electrical4930 25TH AVE SSimple like and kind panel swap, old 200amp not enough spaces for client. Updated ground rods, grounded water main, no gas.$3,500
7079283-EL2025-04-04Electrical1115 23RD AVE EHouse rewire, ADU in basement, upgraded service 320amp.[2/4/2026 JBC Added UFER Test to Permit]$60,000
7078184-EL2025-03-31Electrical5233 28TH AVE SUfer$10,000
7056181-EL2024-11-13Electrical5233 28TH AVE SSeparating and wiring for an ADU in the main house. Upgrading service to accommodate for Main house, ADU, also a Future DADU.$40,000
7051008-EL2024-10-14Electrical3303 35TH AVE STwo bathroom, two bedrooms, livingroom space in basement, laundry remodel$16,000
7032517-EL2024-06-25Electrical734 N 82ND STAddition to home added hvac mini split also.$10,000
7028455-EL2024-06-03Electrical2310 NW 90TH STWhole house remodel ripped down to studs. Upgrade panel from 200amps to 400amps.$30,000
7022573-EL2024-04-30Electrical1921 EDGEMONT PL WRemodel 2/3 new construction, 1/3 rework old wiring in basement, relocate panel into garage. [5/6/24 KEF - Service inspection added. No fee adjustment required.]$25,000
7007728-EL2024-02-02Electrical2815 NW 77TH STRelocation of metter for service upgrades due to scl requirements.$1,500
7007509-EL2024-02-01Electrical526 25TH AVEBasement remodel and cleaning up junctions throughout basement.[5/23/2024 JBC Added Service Panel Replacement to the Permit]$15,000
6990223-EL2023-10-09Electrical2815 NW 77TH STBuilding a DADU in the backyard of lot. Adding an additional service to existing with an added address.$25,000
6979596-EL2023-08-07Electrical2815 NW 77TH STUfer$1
6925665-EL2022-10-02Electrical9900 BAYARD AVE NWHouse Remodel added square footage for master bedroom.$30,000
6919858-EL2022-08-30Electrical3129 NE 84TH STKitchen remodel only.$8,000
6912073-EL2022-07-19Electrical9900 BAYARD AVE NWAdding Sq footage.. just pulling the permit to get demo started.$40,000
6885116-EL2022-02-27Electrical2125 N 120TH STNew construction for adding two new bedrooms the main house. Swapping out old 200amp panel for new with more space count.$7,000
6885117-EL2022-02-27Electrical2125 N 120TH STUfer Test..$1
6852138-EL2021-08-05Electrical10520 14TH AVE NWPartial rewire/New construction remodel of home including new framing on top floor, Panel change like-in-kind with upgraded grounding. New construction on majority of the home trea$30,000
6852126-EL2021-08-05Electrical5112 KEYSTONE PL NMini Split unit being added in backyard. Ran new circuit through unfinished section in the basement to backyard exterior wall to disconnect for unit.$1,500
6851762-EL2021-08-04Electrical614 W GARFIELD STPartial rewire knob and tube in entry living room. Added lighting to be cut in at trim out have lid opened due to cracked drywall. Added a can light in walk in closet above living $6,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →