COMPANY RECORD · SEATTLE, WA
Huckleberry Electric — permit history in Seattle, WA
Huckleberry Electric appears on 215 Seattle permit records from 2022 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 215 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 11 |
| 2023 | 57 |
| 2024 | 45 |
| 2025 | 44 |
| 2026 | 58 |
Busiest year on record: 2026, with 58 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3908 SW OTHELLO ST | 2026-08-28 |
| 823 NE 104TH ST | 2026-08-28 |
| 3422 21ST AVE S | 2026-08-27 |
| 6743 5TH AVE NW | 2026-08-24 |
| 9241 9TH AVE NW | 2026-08-19 |
| 2246 NW 63RD ST | 2026-08-13 |
| 4016 42ND AVE SW | 2026-08-11 |
| 3611 NE 57TH ST | 2026-08-07 |
| 557 NE 90TH ST | 2026-08-07 |
| 11030 36TH AVE NE | 2026-08-07 |
| 3423 8TH AVE W | 2026-08-03 |
| 3008 SW 106TH ST | 2026-07-30 |
| 509 N 77TH ST | 2026-07-27 |
| 8007 10TH AVE NW | 2026-07-22 |
204 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $200 to $2,100,000, median $1,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
215 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7160357-EL | 2026-08-28 | Electrical | 3908 SW OTHELLO ST | Installing a 40amp sauna circuit and disconnect | |
| 7160358-EL | 2026-08-28 | Electrical | 823 NE 104TH ST | Installing a 50amp sauna circuit/disconnect and a 20amp circuit for exterior outlet | |
| 7160122-EL | 2026-08-27 | Electrical | 3422 21ST AVE S | Replacing 200amp panel, installing 100amp subpanel, EV charger hardwire, dedicated circuit | |
| 7159546-EL | 2026-08-24 | Electrical | 6743 5TH AVE NW | Replacing 200amp panel and meter, installing sauna heater circuit | |
| 7158868-EL | 2026-08-19 | Electrical | 9241 9TH AVE NW | Replacing 200amp panel and meter | |
| 7158070-EL | 2026-08-13 | Electrical | 2246 NW 63RD ST | Install 3 new 20amp circuits serving 3 mini-splits, one serving each unit/floor. | |
| 7157592-EL | 2026-08-11 | Electrical | 4016 42ND AVE SW | 200amp panel and meter replacement, partial rewiring, and 50amp EV charger hardwire | |
| 7157107-EL | 2026-08-07 | Electrical | 3611 NE 57TH ST | Installing a 60amp subpanel with 1 dedicated 30amp 240v circuit and 3 dedicated 20amp 120v circuits | |
| 7157106-EL | 2026-08-07 | Electrical | 557 NE 90TH ST | 50amp ev charger hardwire | |
| 7157105-EL | 2026-08-07 | Electrical | 11030 36TH AVE NE | 60amp EV charger hardwire | |
| 7156293-EL | 2026-08-03 | Electrical | 3423 8TH AVE W | Adding a 50amp ev charger circuit | |
| 7155842-EL | 2026-07-30 | Electrical | 3008 SW 106TH ST | Installing a 60amp subpanel, 20amp circuit and heater to outdoor shed. | |
| 7155145-EL | 2026-07-27 | Electrical | 509 N 77TH ST | Installing 50amp sauna circuit and disconnect. | |
| 7154401-EL | 2026-07-22 | Electrical | 8007 10TH AVE NW | Adding can lighting | |
| 7153660-EL | 2026-07-17 | Electrical | 4317 5TH AVE NE | Replacing an existing 200amp panel | |
| 7153434-EL | 2026-07-16 | Electrical | 4126 45TH AVE SW | Adding outlets and lighting to 8 circuits | |
| 7152905-EL | 2026-07-14 | Electrical | 9001A 46TH AVE S | Installing an EV charger circuit | |
| 7152906-EL | 2026-07-14 | Electrical | 6537 CLEOPATRA PL NW | Installing 15/20a outlets throughout home and dedicated circuit for kitchen appliance. | |
| 7152640-EL | 2026-07-13 | Electrical | 9817 35TH AVE SW | Replacing meter enclosure [C.Kenefick 7/17/2026 - New 200a service installed. Original service upgraded from 100a to 200a.] | |
| 7150073-EL | 2026-06-25 | Electrical | 12304 PINEHURST WAY NE | Partial knob and tube rewire | |
| 7149860-EL | 2026-06-24 | Electrical | 6533 GREENWOOD AVE N | 50amp EV charger hardwire roughly 100ft | |
| 7148690-EL | 2026-06-17 | Electrical | 5046 35TH AVE NE | Replacing panel and partial wiring | |
| 7147670-EL | 2026-06-11 | Electrical | 1409A NW 63RD ST | Replacing an existing 200amp panel. | |
| 7147661-EL | 2026-06-11 | Electrical | 3041 10TH AVE W | Installing a 60amp circuit for a hardwired charger, roughly 100ft in distance. | |
| 7147431-EL | 2026-06-10 | Electrical | 6533 16TH AVE NE | Installing a 60amp circuit for a sauna. | |
| 7147442-EL | 2026-06-10 | Electrical | 4934 PURDUE AVE NE | Partial knob and tube rewire. 2 20A circuits for the bath GFCI and one for the garage. 3 15A circuits for living, bedrooms, garage lights and kitchen lights. All work is rewiring | |
| 7145300-EL | 2026-05-28 | Electrical | 7319 24TH AVE NE | Replacing a 200amp panel | |
| 7144757-EL | 2026-05-26 | Electrical | 9544 3RD AVE NW | Installing a 60amp circuit for an EV charger hardwire. | |
| 7143726-EL | 2026-05-18 | Electrical | 4812 S AUSTIN ST | Upgrading service to 200amps and replacing existing meter and panel. Rewiring knob and tube wiring. | |
| 7143295-EL | 2026-05-14 | Electrical | 1936 SUNSET AVE SW | 50amp circuit for EV Charger hardwire | |
| 7141579-EL | 2026-05-05 | Electrical | 8630 21ST AVE NW | 50amp EV charger, garage light installs, outlet install | |
| 7140214-EL | 2026-04-27 | Electrical | 1928 E MCGRAW ST | Adding a 100amp subpanel and a 50amp (40amp load) EV charger | |
| 7140203-EL | 2026-04-27 | Electrical | 615 WEMERSONST | Replacing existing 200amp panel. 6/12/2026 address change from 615 W Emerson ST[7/27/2026 JBC Added Reinspection Fee to permit] | |
| 7140204-EL | 2026-04-27 | Electrical | 617 W EMERSON ST | Replacing existing 200amp panel[7/27/2026 JBC Added Reinspection Fee to permit] | |
| 7140205-EL | 2026-04-27 | Electrical | 619 W EMERSON ST | Replace existing 200amp panel with a Span panel[7/27/2026 JBC Added Reinspection Fee to permit] | |
| 7139987-EL | 2026-04-24 | Electrical | 7722 22ND AVE NE | Can lights installs, two new outlet installs, knob and tube replacement for existing devices | |
| 7138912-EL | 2026-04-17 | Electrical | 3609 ARAPAHOE PL W | Installing 40amp circuit for oven. | |
| 7138567-EL | 2026-04-15 | Electrical | 2228 EASTMONT WAY W | Replacing 7 outlets | |
| 7138212-EL | 2026-04-14 | Electrical | 5616 NE 70TH ST | Installing a dedicated 20amp outlet and 50amp circuit for hot tub. | |
| 7137819-EL | 2026-04-10 | Electrical | 151 NW 60TH ST | Adding a temporary power pole so that SCL can cut power to the main service line and the customer can begin trenching near (currently live) service wire. | |
| 7137592-EL | 2026-04-09 | Electrical | 4324 NE 44TH ST | Knob and tube rewire consisting of 2 15amp circuits and 1 20 amp circuit | |
| 7137628-EL | 2026-04-09 | Electrical | 6225 30TH AVE NE | GM Bi-Directional EV Charger install, 80 amps | |
| 7137142-EL | 2026-04-07 | Electrical | 414 NE 42ND ST | Replacing 7 switchlegs | |
| 7136729-EL | 2026-04-03 | Electrical | 4814 NE 43RD ST | Adding a 50amp ev charger and duplex outlet in garage | |
| 7136112-EL | 2026-03-31 | Electrical | 3933B S BRANDON ST | Adding a 50amp ev charger | |
| 7135601-EL | 2026-03-27 | Electrical | 4008 37TH AVE S | Replacing 200amp panel | |
| 7134985-EL | 2026-03-24 | Electrical | 172 BLAINE ST | Installing a 40amp 240v kiln circuit. | |
| 7133318-EL | 2026-03-13 | Electrical | 9853 61ST AVE S | Installing 200amp panel and replacing (not extending) wiring to existing devices. | |
| 7131543-EL | 2026-03-02 | Electrical | 609 LAKE WASHINGTON BLVD E | Adding exterior outlet circuit. Relocating bath fan and replacing with light fixture. | |
| 7131288-EL | 2026-02-27 | Electrical | 151B NW 60TH ST | Adding a 100amp subpanel and wiring in a new basement ADU. |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
