COMPANY RECORD · SEATTLE, WA
Holmes Electric Company — permit history in Seattle, WA
Holmes Electric Company appears on 848 Seattle permit records from 2015 through 2026, most often electrical (99.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 847 | 99.9% |
| Mechanical / HVAC | 1 | 0.12% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 130 |
| 2016 | 145 |
| 2017 | 111 |
| 2018 | 65 |
| 2019 | 59 |
| 2020 | 37 |
| 2021 | 54 |
| 2022 | 56 |
| 2023 | 45 |
| 2024 | 42 |
| 2025 | 43 |
| 2026 | 61 |
Busiest year on record: 2016, with 145 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4270 RAINIER AVE S | 2026-10-29 |
| 3417 1ST AVE S | 2026-10-26 |
| 4058 RAINIER AVE S | 2026-10-21 |
| 4501 SHILSHOLE AVE NW | 2026-10-20 |
| 1113 6TH AVE | 2026-10-15 |
| 5030 1ST AVE S | 2026-10-08 |
| 320 WESTLAKE AVE N | 2026-10-02 |
| 303 NE NORTHLAKE WAY | 2026-09-30 |
| 1801 16TH AVE SW | 2026-09-25 |
| 1150 EASTLAKE AVE E | 2026-09-24 |
| 353 NE NORTHGATE WAY | 2026-09-02 |
| 2101 1ST AVE | 2026-08-24 |
| 500 9TH AVE N | 2026-08-18 |
| 3801 LATONA AVE NE | 2026-08-17 |
311 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $34,581,000, median $4,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Titan Electric Inc | 47 | 2015–2026 |
| Prime Electric | 42 | 2015–2026 |
| Cochran Inc | 38 | 2015–2026 |
| Ec Electric | 33 | 2015–2026 |
| Mckinstry Co LLC | 31 | 2015–2026 |
| Adt LLC | 31 | 2015–2026 |
| Guardian Security Systems Inc | 28 | 2015–2026 |
| Hermanson Company | 27 | 2015–2026 |
Companies that also appear in Seattle permit records at addresses where Holmes Electric Company filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
848 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7169797-EL | 2026-10-29 | Electrical | 4270 RAINIER AVE S | 80249 - Replace neutral bar kit to 6pack meter stack | |
| 7169194-EL | 2026-10-26 | Electrical | 3417 1ST AVE S | 80199 - Install (1) new 30A circuit from an existing panel and install a new 30A twist-lock receptacle. | |
| 7168578-EL | 2026-10-21 | Electrical | 4058 RAINIER AVE S | 79241 - Reconfiguration of the packaging lines and installation of metal detection equipment with installation of cable tray above the ceiling space for VFD Cabling. | |
| 7168364-EL | 2026-10-20 | Electrical | 4501 SHILSHOLE AVE NW | 80174 - Install 1-20a 120v circuit for gate | |
| 7167544-EL | 2026-10-15 | Electrical | 1113 6TH AVE | 80154 - install 2-20amp 20volt circuit and receptacle for install tools. | |
| 7166506-EL | 2026-10-08 | Electrical | 5030 1ST AVE S | 80105 - Retrofit 43-2x4 fixtures to LED Retrofit 5-1x4 fixtures to LED | |
| 7165607-EL | 2026-10-02 | Electrical | 320 WESTLAKE AVE N | 79330 - disconnect (4) feeds to existing pumps and reconnect after replacement by others | |
| 7165229-EL | 2026-09-30 | Electrical | 303 NE NORTHLAKE WAY | 80058 - install 2-20amp 120v to heaters in loft office | |
| 7164456-EL | 2026-09-25 | Electrical | 1801 16TH AVE SW | 79697 - disconnecting a 480V feeder in an existing electrical cabinet on dry dock and re-connection. | |
| 7164235-EL | 2026-09-24 | Electrical | 1150 EASTLAKE AVE E | 80022 - install 1-20a 120v circuit for control panel. install 1-O2Senor and 2-horn/strobes | |
| 7161741-EL | 2026-09-09 | Electrical | 303 NE NORTHLAKE WAY | 79922 - Install 6-20amp circuits for loft office. install 12 duplex receptacles, install 2-overhead light fixtures | |
| 7161742-EL | 2026-09-09 | Electrical | 303 NE NORTHLAKE WAY | 79921 - Install 4- 20amp 120volt circuits from new server room panel. One circuit to card reader, one to gate, one to first aid station and one over worktable | |
| 7160995-EL | 2026-09-02 | Electrical | 353 NE NORTHGATE WAY | 79890 - Extend/install power to teller line, work stations and tvs, install 1-circuit for tv, install 12-isolate ground recepts, install 4-duplex recepts, install 4-four plex recet | |
| 7160313-EL | 2026-08-28 | Electrical | 303 NE NORTHLAKE WAY | 79866 - Install 1-125amp 120/208volt electrical panel in upstairs loft office | |
| 7159461-EL | 2026-08-24 | Electrical | 303 NE NORTHLAKE WAY | 79834 - install 1-125amp 120/208v panel | |
| 7159500-EL | 2026-08-24 | Electrical | 2101 1ST AVE | 79759 - 79759 - Install (4) locations of (2) data cables each from IDF to AP/Camera locations. Cables to be terminated on new 24 port Cat 6 patch panel in IDF and on Cat 6 inserts | |
| 7117150-EL | 2026-08-18 | Electrical | 500 9TH AVE N | install 1-800amp panel to 1-225kva step down transformer, to 2-400amp 120/208v panels | $216,000 |
| 7158444-EL | 2026-08-17 | Electrical | 303 NE NORTHLAKE WAY | 79787 - install 2-20amp 120v circuits to upstairs office for plug in ac units | |
| 7158479-EL | 2026-08-17 | Electrical | 3801 LATONA AVE NE | 79796 - install 1-80amp 208v 3ph circuit for Trak Lathe | |
| 7158476-EL | 2026-08-17 | Electrical | 3801 LATONA AVE NE | 79795 - Install 1-50Amp 208V 3Ph circuit for Traks Bel Mil | |
| 7157165-EL | 2026-08-07 | Electrical | 6500 52ND AVE S | 79510 - Replace existing exterior lighting including (13) rooftop flood lights, 4 wall packs, & 2 entryway canopy fixtures. Replace conduit/wiring as needed for rooftop flood light | |
| 7156536-EL | 2026-08-04 | Electrical | 303 NE NORTHLAKE WAY | 79709 - Relocate conduit and circuitry up over door. | |
| 7156535-EL | 2026-08-04 | Electrical | 303 NE NORTHLAKE WAY | 79710 - Extend lighting circuit in upstairs office and install 3-pendant fixtures. | |
| 7151816-EL | 2026-07-08 | Electrical | 3801 LATONA AVE NE | Install (1) 40amp 208v 3 phase circuit for compressor | |
| 7151827-EL | 2026-07-08 | Electrical | 303 NE NORTHLAKE WAY | 79534 - Install (1) 40amp 208v 3phase circuit for compressor | |
| 7146914-EL | 2026-06-08 | Electrical | 303 NE NORTHLAKE WAY | 79348 - install 1-circuit to 4-receptacles in upstairs office extend lighting circuit to 1-pendant | |
| 7144954-EL | 2026-05-27 | Electrical | 422 SUMMIT AVE E | 79219 - Circuit alteration for cell communication equipment. | |
| 7143941-EL | 2026-05-19 | Electrical | 3417 1ST AVE S | 79047 - Install (1) 480V 250A circuit from existing Panel 1SWHV2 for new test cell power. No change to existing panel or service. | |
| 7143442-EL | 2026-05-15 | Electrical | 1600 2ND AVE | 79184 - Connect existing circuit to new trash compactor. | |
| 7142921-EL | 2026-05-13 | Electrical | 303 NE NORTHLAKE WAY | 79160 - Install 2-circuits and 4 GFCi receptacles at EE by door | |
| 7141784-EL | 2026-05-06 | Electrical | 62 CEDAR ST | 79014 - Add inline 120-volt disconnect switches to existing motor dampers. | |
| 7141067-EL | 2026-05-01 | Electrical | 6606 URSULA PL S | 79091 - Install 3-20amp circuits and receptacles for microwave, coffee maker and misc | |
| 7139796-EL | 2026-04-23 | Electrical | 2244 6TH AVE S | 79045 - Relocate existing 480-volt 30-amp circuit for forklift charger. | |
| 7139100-EL | 2026-04-20 | Electrical | 1427 11TH AVE | 79013 - Add (9) switches to existing damper motors. | |
| 7139188-EL | 2026-04-20 | Electrical | 8105 GREENWOOD AVE N | 79009 - Install (3) light fixtures, (1) thermostat, (6) receptacles, and (1) 240V baseboard heater in existing locations. Same devices to replace old ones removed by prior tenant. | |
| 7139192-EL | 2026-04-20 | Electrical | 5427 OHIO AVE S | 78999 - Install (1) 60A disconnect switch with (2) 35A fuses for split system replacement. Install (1) 30A disconnect switch with (2) 20A fuses for additional split system replacem | |
| 7138623-EL | 2026-04-16 | Electrical | 4401 EAST MARGINAL WAY S | 78998 - Add (3) 120-volt 20-amp cord drops. Add (2) 208-volt cord drops. Add (1) 208-volt 30-amp cord drops. | |
| 7138615-EL | 2026-04-16 | Electrical | 221 YALE AVE N | 78990 - Retrofit lighting in parking garage | |
| 7137963-EL | 2026-04-13 | Electrical | 909 5TH AVE | 78971 - Disconnect existing 208/230V 3P 30A feed to heat pump and reconnect after unit replacement by others. Demo EMT & lighting to accommodate removal of duct work and reinstall | |
| 7136561-EL | 2026-04-02 | Electrical | 1600 2ND AVE | 78905 - Disconnect & reconnect existing feeds to (2) new sump pumps for replacement by others. No changes to existing circuits. | |
| 7136192-EL | 2026-04-01 | Electrical | 3417 1ST AVE S | 78902 - Install (1) 20A 120V duplex receptacle tied into existing circuit | |
| 7134230-EL | 2026-03-19 | Electrical | 1191 2ND AVE | 78827 - install 20a 208v 1phs circuit from LM1 panel to small tower with infrared heater with remote control | |
| 7133327-EL | 2026-03-13 | Electrical | 303 NE NORTHLAKE WAY | 78797 - Install 1-40a 250volt circuit for spa | |
| 7132650-EL | 2026-03-10 | Electrical | 303 NE NORTHLAKE WAY | 78754 - Replace grounding strike for service on dock | |
| 7131858-EL | 2026-03-04 | Electrical | 1819 23RD AVE | 78719 - Disconnect existing pump motor & floats to be replaced with new. Work to take place in lower-level parking garage. Reaching by cell phone may be an issue if electrician is | |
| 7130921-EL | 2026-02-25 | Electrical | 303 NE NORTHLAKE WAY | 78684 - Install 30a 250v 3phs circuit for compressor | |
| 7129677-EL | 2026-02-24 | Electrical | 901 TAYLOR AVE N | JOB 78396 - Retro fit (19) panel interiors in units [2/24/26 KEF - Plan set approved.] | $29,661 |
| 7128656-EL | 2026-02-10 | Electrical | 303 NE NORTHLAKE WAY | ||
| 7128479-EL | 2026-02-09 | Electrical | 4401 EAST MARGINAL WAY S | JOB 78534 - Installation of (1) 20 Amp 120/208 Volt Circuit for new equipment. | |
| 7128135-EL | 2026-02-05 | Electrical | 7224 1ST AVE S | OB 78397 Disconnect existing Chiller. Wire in temp chiller for repairs. Once repairs are made wire in new chiller. |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 848 permits above are a static record through 2026. Select a year above to open that year’s records, or search Holmes Electric Company in Seattle, WA by address, trade or date range.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
