COMPANY RECORD · SEATTLE, WA
Gene Johnson Plumbing & Heating — permit history in Seattle, WA
Gene Johnson Plumbing & Heating appears on 27 Seattle permit records from 2022 through 2026, most often mechanical / hvac (96.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 26 | 96.3% |
| Electrical | 1 | 3.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 10 |
| 2025 | 7 |
| 2026 | 3 |
Busiest year on record: 2024, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3029 29TH AVE W | 2026-07-17 |
| 4314 32ND AVE W | 2026-06-29 |
| 1749 NW 61ST ST | 2026-01-28 |
| 4265 B LINDEN AVE N | 2025-10-10 |
| 2017 NE 135TH PL | 2025-09-03 |
| 1733 S HORTON ST | 2025-08-22 |
| 9538 44TH AVE NE | 2025-04-16 |
| 1809 24TH AVE | 2025-03-14 |
| 5401 BEACH DR SW | 2025-01-17 |
| 1523 MADRONA DR | 2024-11-22 |
| 8010 ASHWORTH AVE N | 2024-11-11 |
| 4108 NE 96TH ST | 2024-06-28 |
| 9108 45TH AVE SW | 2024-06-10 |
| 9343 FAUNTLEROY WAY SW | 2024-05-11 |
26 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,838 to $48,000, median $22,788. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
27 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7153598-BP | 2026-07-17 | Mechanical / HVAC | 3029 29TH AVE W | Cast iron boiler replacement | $15,400 |
| 7150041-BP | 2026-06-29 | Mechanical / HVAC | 4314 32ND AVE W | Boiler replacement. - two boilers at home. one permit has already been issued. | $15,000 |
| 7126825-BP | 2026-01-28 | Mechanical / HVAC | 1749 NW 61ST ST | like-for-like boiler/combi replacement | $27,000 |
| 7111127-BP | 2025-10-10 | Mechanical / HVAC | 4265 B LINDEN AVE N | Boiler replacement - like for like. | $17,000 |
| 7104852-BP | 2025-09-03 | Mechanical / HVAC | 2017 NE 135TH PL | Installation of a 50-gallon electric water heater | $2,838 |
| 7103064-BP | 2025-08-22 | Mechanical / HVAC | 1733 S HORTON ST | Like for like boiler replacement | $21,000 |
| 7080981-BP | 2025-04-16 | Mechanical / HVAC | 9538 44TH AVE NE | Installing Navien Condensing Boiler | $20,000 |
| 7075491-BP | 2025-03-14 | Mechanical / HVAC | 1809 24TH AVE | Boiler Combi Replacement. | $18,000 |
| 7071085-BP | 2025-02-18 | Mechanical / HVAC | 4314 32ND AVE W | Boiler Combi installation | $30,000 |
| 7065968-BP | 2025-01-17 | Mechanical / HVAC | 5401 BEACH DR SW | Boiler replacement | $10,348 |
| 7057846-BP | 2024-11-22 | Mechanical / HVAC | 1523 MADRONA DR | Boiler install | $21,500 |
| 7055721-BP | 2024-11-11 | Mechanical / HVAC | 8010 ASHWORTH AVE N | Boiler replacement | $6,400 |
| 7033270-BP | 2024-06-28 | Mechanical / HVAC | 4108 NE 96TH ST | Boiler installation | $30,000 |
| 7029176-BP | 2024-06-10 | Mechanical / HVAC | 9108 45TH AVE SW | Boiler system install. | $35,000 |
| 7024559-BP | 2024-05-11 | Mechanical / HVAC | 9343 FAUNTLEROY WAY SW | Boiler replacement | $48,000 |
| 7022807-BP | 2024-05-01 | Mechanical / HVAC | 7535 SEWARD PARK AVE S | Basic Navien NFC-250/175H Combi Boiler Installation | $24,000 |
| 7020132-BP | 2024-04-16 | Mechanical / HVAC | 5520 29TH AVE NE | Navien NHB-80 Boiler Installation | $26,884 |
| 7019895-BP | 2024-04-15 | Mechanical / HVAC | 727 35TH AVE | Navien NFC-250 Combi Boiler Installation | $32,238 |
| 7015900-BP | 2024-03-22 | Mechanical / HVAC | 710 SUMMIT AVE E | Navien NCB-240 Combi Boiler | $22,342 |
| 7015853-BP | 2024-03-22 | Mechanical / HVAC | 6518 30TH AVE S | Navien NCB-240 Combi Boiler Installation | $19,200 |
| 7002747-BP | 2023-12-30 | Mechanical / HVAC | 7716 1ST AVE NW | Boiler installation | $39,275 |
| 6972075-BP | 2023-06-23 | Mechanical / HVAC | 2042 A NW 63RD ST | Basic Navien NCB-240 Combi Boiler Installation | $22,788 |
| 6971382-BP | 2023-06-20 | Mechanical / HVAC | 2222 YALE AVE E | Combi boiler like for like replacement | $25,511 |
| 6970111-BP | 2023-06-13 | Mechanical / HVAC | 931 A N 35TH ST | Navien NCB-240 Combi Boiler Installation | $24,164 |
| 6901619-FR | 2022-05-24 | Mechanical / HVAC | 12013 B 12TH AVE NW | Premium Specialty Gas Water Heater Installation Viessmann VITODENS 100-W -Combi Remove old furnace and install new I-Flow Run heating system over to furnace. | $28,496 |
| 6901080-EL | 2022-05-20 | Electrical | 12013B 12TH AVE NW | Premium Specialty Gas Water Heater Installation Viessmann VITODENS 100-W -Combi Remove old furnace and install new I-Flow Run heating system over to furnace. 6/1/22 sk cahn | $28,496 |
| 6891447-BP | 2022-03-30 | Mechanical / HVAC | 5008 6TH AVE NW | Installing a new boiler | $12,295 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
