COMPANY RECORD · SEATTLE, WA

Gc Electric LLC — permit history in Seattle, WA

Gc Electric LLC appears on 30 Seattle permit records from 2018 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical30100%

Activity by year

YearPermits issued
20181
20195
20211
202623

Busiest year on record: 2026, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5320 47TH AVE SW2026-08-11
9214 21ST AVE NW2026-08-03
210C BOSTON ST2026-06-19
8228 INTERLAKE AVE N2026-05-20
403 W DRAVUS ST2026-05-11
1902 NE 65TH ST2026-05-05
619 34TH AVE2026-04-21
1109 NW 122ND ST2026-04-15
9544 SAND POINT WAY NE2026-04-14
4220 NE 65TH ST2026-04-02
5071 DELRIDGE WAY SW2026-04-01
1731 30TH AVE S2026-03-29
9222 MARY AVE NW2026-03-17
2516 10TH AVE W2026-02-24

29 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $100,000, median $4,400. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

30 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7157518-EL2026-08-11Electrical5320 47TH AVE SWRenovating kitchen and laundry room to expand kitchen and create new laundry closet and pantry adding lighting switches and outlets through out
7156329-EL2026-08-03Electrical9214 21ST AVE NWWe are upgrading the service and installing an exterior subpanel fed from existing main panel to support new exterior electrical loads. -Bonding around pool and metal planter -Ins
7149179-EL2026-06-19Electrical210C BOSTON STInstalling heat pump circuit with disconnect In backyard
7144230-EL2026-05-20Electrical8228 INTERLAKE AVE Ninstalling dedicated 240v-15 amp circuit for heat pump. conduit and weather proof service disconnect installed at unit
7142476-EL2026-05-11Electrical403 W DRAVUS STinstalling temp power for new construction
7141657-EL2026-05-05Electrical1902 NE 65TH STrewire for duplex. adding new appliance receptacles, outlets, switches, and fixtures throughout. new panel and service,like for like Ground floor unit: 1902 NE 65th St, Seattle, W
7139500-EL2026-04-21Electrical619 34TH AVEadding a heat pump circuit from panel to deck And reconfigure panel to accomodate new circuitry. Grouind work for future hot tub
7138564-EL2026-04-15Electrical1109 NW 122ND STNew construction of two story dadu, garage below. service will potentially be located on exist SFR/AADU (12156 12TH AVE NW) existing 400-amp service
7138326-EL2026-04-14Electrical9544 SAND POINT WAY NEabandoned old subpanel and along with relocate it.200amp and relocated the meter
7136442-EL2026-04-02Electrical4220 NE 65TH STRemodeling home and adding additon to home and second story. Increasing garage to 2 car garage and deck
7136383-EL2026-04-01Electrical5071 DELRIDGE WAY SWWe are trimming the work done under permit 7125297-EL(passed cover). Per Carol Kenefick. Full gospel church is not able to get a response from the previous Electrical contractor so
7135710-EL2026-03-29Electrical1731 30TH AVE Sexterior electrical; - Wiring a Nema3 sub-panel, provided by others - Installing 2-3 outlets on new deck structure and over-head lighting
7133873-EL2026-03-17Electrical9222 MARY AVE NWAdding EVC receptacle and circuit
7130824-EL2026-02-24Electrical2516 10TH AVE WRemodel & addition to existing 2-story house with basement to include: new bath and kitchen additions at main floor, new bedroom and bathroom additions at upper floor, no new work
7130826-EL2026-02-24Electrical2514 10TH AVE WADD NEW 2 CAR GARAGE AT ALLEY WITH DADU ABOVE.
7129602-EL2026-02-16Electrical7311 9TH AVE NWsub panel for basement and rewire to middle flor and basement
7129198-EL2026-02-12Electrical3447 12TH AVE W200amp Panel change, like for like
7128071-EL2026-02-10Electrical8539 14TH AVE NWNew construction 4-story building on single parcel - 14 units in each building with shared amenity space, bicycle locker, waste room, mechanical/sprinkler room. This permit is for $1
7128187-EL2026-02-05Electrical5816 SEWARD PARK AVE S
7126283-EL2026-02-05Electrical8537 14TH AVE NWNew construction 4-story building on single parcel - 14 units in each building with shared amenity space, bicycle locker, waste room, mechanical/sprinkler room. This permit is for $100,000
7125832-EL2026-02-04Electrical4226A LATONA AVE NEWest 2-family dwelling including service. [2/4/26 KEF - Plan set approved. See permit 7128025-EL for east 2-family dwelling.]$80,000
7128025-EL2026-02-04Electrical4228 LATONA AVE NEEast 2-family dwelling. See permit plan review permit 7125832-EL for west 2-family dwelling including service.$0
7125522-EL2026-01-19Electrical4228 LATONA AVE NE
6826581-EL2021-03-04Electrical1611 10TH AVE Wcomplete rewiring or electrical systems of sfr residence. 5/18/2021 change service to 300A, add (1) 300A feeder$25,000
6753613-EL2019-10-15Electrical4119 52ND AVE SWWiring changes associated with the construction of an addition onto the back of a SFR$4,400
6749759-EL2019-09-23Electrical8601 13TH AVE SWInstalling temp pole$1,200
6748405-EL2019-09-16Electrical9449 5TH AVE SWInstalling temp pole and disconnecting old service and connecting temp service$1,200
6748457-EL2019-09-16Electrical3664 INTERLAKE AVE Nufer ground$1,200
6746004-EL2019-08-30Electrical4432 40TH AVE SWPanel change  3 240 amp circuits  7 120 amp circuits Rewire of upstairs$13,000
6694719-EL2018-10-19Electrical12755 3RD AVE NWConstruct substantial alterations and additions including new upper level and creation of Accessory Dwelling Unit (ADU) at lower level of existing single family residence, per plan$24,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →