Electrocom appears on 57 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 57 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 2 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 8 |
| 2019 | 9 |
| 2020 | 6 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 7 |
| 2024 | 8 |
| 2025 | 9 |
| 2026 | 3 |
Busiest year on record: 2019, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4800 SAND POINT WAY NE | 2026-05-27 |
| 747 BROADWAY | 2026-05-06 |
| 1550 N 115TH ST | 2026-02-13 |
| 325 9TH AVE | 2025-08-27 |
| 825 EASTLAKE AVE E | 2025-08-12 |
| 1560 N 115TH ST | 2025-02-24 |
| 601 BROADWAY | 2024-12-19 |
| 410 9TH AVE | 2024-09-17 |
| 1959 NE PACIFIC ST | 2024-08-02 |
| 908 JEFFERSON ST | 2023-09-05 |
| 10330 MERIDIAN AVE N | 2023-01-26 |
| 135 32ND AVE | 2022-07-20 |
| 6000 16TH AVE SW | 2021-09-10 |
| 6220 32ND AVE NE | 2020-09-23 |
28 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,245 to $1,406,000, median $87,485. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
57 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7145016-EL | 2026-05-27 | Electrical | 4800 SAND POINT WAY NE | Installation of low-voltage nurse call devices in an existing building. All rough in, pathway, cabling, and high voltage by others. | |
| 7141798-EL | 2026-05-06 | Electrical | 747 BROADWAY | Installation of low-voltage Nurse Call & RTLS devices in the new Swedish Hughes Tower. ---Devices Only--- All rough in, pathway, cabling, and high voltage by others | |
| 7129339-EL | 2026-02-13 | Electrical | 1550 N 115TH ST | Installing nurse call and RTLS on the 4th floor of the A-Wing at Northwest Hospital. Low-voltage device installation only; all rough-in, pathway, cabling, network, and high-voltage | |
| 7103817-EL | 2025-08-27 | Electrical | 325 9TH AVE | Installation of low voltage nurse call devices on the 4th Floor of the 9th and Jefferson building of the Harborview Campus. All rough in, cabling, pathway, and high voltage by othe | $20,000 |
| 7101223-EL | 2025-08-12 | Electrical | 825 EASTLAKE AVE E | Installing nurse call (devices only) in Building 1, Level 3 of the Fred Hutch Cancer Center. All rough-in, cable, pathway, and high voltage by others. | $200,000 |
| 7099590-EL | 2025-08-01 | Electrical | 325 9TH AVE | Installing nurse call on the 2nd floor (East) area of Harborview MC. Devices only; all rough-in, pathway, cabling, and high voltage by others. | $250,000 |
| 7095059-EL | 2025-07-08 | Electrical | 825 EASTLAKE AVE E | 2337 FHCC Bldg1 Lvl5 Installing nurse call on level 5 of Fred Hutch Building 1. Devices only. All rough-in, cable, pathway, and high voltage by others. | $180,000 |
| 7079879-EL | 2025-04-09 | Electrical | 825 EASTLAKE AVE E | Installing nurse call (devices only) in Building 1, Level 2 of the Fred Hutch Cancer Center. All rough-in, cable, pathway, and high voltage by others. | $53,000 |
| 7071870-EL | 2025-02-24 | Electrical | 1550 N 115TH ST | Installing nurse call and RTLS on the 1st floor of the E-Wing at Northwest Hospital. Low-voltage device installation only; all rough-in, pathway, cabling, network, and high-voltag | $140,000 |
| 7071871-EL | 2025-02-24 | Electrical | 1560 N 115TH ST | Installing nurse call in the Oncology unit on the first floor of the Fred Hutch Building located on the Northwest Hospital Campus. Low-voltage device installation only; all rough-i | $140,000 |
| 7064279-EL | 2025-01-09 | Electrical | 825 EASTLAKE AVE E | 2337 FHCC Bldg1 Lvl4 Installing nurse call on level 4 of Fred Hutch Building 1. Devices only. All rough-in, cable, pathway, and high voltage by others.[1/14/2026 JBC Added renewal | $183,544 |
| 7064291-EL | 2025-01-09 | Electrical | 825 EASTLAKE AVE E | Installing nurse call on level 1 of Fred Hutch Building 1. Devices only. All rough-in, cable, pathway, and high voltage by others. | $90,819 |
| 7061930-EL | 2024-12-19 | Electrical | 601 BROADWAY | 2333 SOI 2nd Floor Installing nurse call devices on Swedish Orthopedic Institute's 2nd floor. DEVICES ONLY; all cabling, rough-in, pathway, structural, and high voltage by others. | $95,000 |
| 7061883-EL | 2024-12-19 | Electrical | 601 BROADWAY | 2333 SOI 4th Floor Installing nurse call devices on Swedish Orthopedic Institute's 4th floor. DEVICES ONLY; all cabling, rough-in, pathway, structural, and high voltage by others | $166,000 |
| 7046568-EL | 2024-09-17 | Electrical | 410 9TH AVE | Installing nurse call and RTLS at Harborview Maleng building, floors 4 and 7. DEVICES ONLY; ALL CABLE, ROUGH-IN, STRUCTURAL, AND HIGH VOLTAGE BY OTHERS. | $299,000 |
| 7046229-EL | 2024-09-16 | Electrical | 1550 N 115TH ST | Installing nurse call and RTLS in the 1st floor E-wing Oncology department. DEVICES ONLY; ALL ROUGH-IN, CABLE, PATHWAY, STRUCTURAL, AND HIGH VOLTAGE BY OTHERS. | $238,000 |
| 7038971-EL | 2024-08-02 | Electrical | 825 EASTLAKE AVE E | Installing nurse call on level 7 of Fred Hutch Building 1. Devices only. All rough-in, cable, pathway, and high voltage by others. 9/22/2025 jnl renewal | $462,000 |
| 7039045-EL | 2024-08-02 | Electrical | 1959 NE PACIFIC ST | Installing nurse call and RTLS in 4SA (NICU) at UW Montlake. Devices only. All cabling, rough-in, pathway, and high voltage by others. | $365,000 |
| 7035354-EL | 2024-07-15 | Electrical | 601 BROADWAY | Installing nurse call devices on Swedish Orthopedic Institute's 4th floor. DEVICES ONLY; all cabling, rough-in, pathway, structural, and high voltage by others. | $192,000 |
| 7019761-EL | 2024-04-15 | Electrical | 4800 SAND POINT WAY NE | Installing nurse call additions in the MB.6 PACU/OR space, onto existing system. Devices only. All rough-in, cabling, pathway, and high voltage by others. | $16,000 |
| 6993632-EL | 2023-10-30 | Electrical | 4800 SAND POINT WAY NE | Installing nurse call in the RA.6 portion of Seattle Children's Hospital. Devices only; all rough-in, cable, pathway, and high voltage by others. | $62,000 |
| 6993746-EL | 2023-10-30 | Electrical | 747 BROADWAY | Nurse call and RTLS installation throughout facility (1st floor PODs, ED, 4SW, 5SW, 7SW, 8SW, 9SW, 11SW, 12SW). Devices only. All rough-in, pathway, cabling, and high voltage by ot | $1,406,000 |
| 6985895-EL | 2023-09-14 | Electrical | 1550 N 115TH ST | Installing nurse call and RTLS throughout the BHTF facility, floors 1 through 6. Low-voltage device installation only; all rough-in, pathway, cabling, network, and high-voltage ele | $931,000 |
| 6984289-EL | 2023-09-05 | Electrical | 908 JEFFERSON ST | Installing nurse call throughout the 9th and 10th floors of the NJB building. Low-voltage devices only; all rough-in, cabling, pathway, and high voltage work by others. [Lake, 9/13 | $83,000 |
| 6976777-EL | 2023-07-21 | Electrical | 1550 N 115TH ST | Installing nurse call and RTLS low-voltage devices throughout the 3rd floor of NWH. All rough-in, pathway, cable, and high voltage by others. | $282,000 |
| 6949520-EL | 2023-02-22 | Electrical | 325 9TH AVE | Installing nurse call in Harborview's 1WH Angio area. Device installation only; all rough-in, pathway, cabling, and high voltage by others. | $19,213 |
| 6944723-EL | 2023-01-26 | Electrical | 10330 MERIDIAN AVE N | Installing Responder 5K nurse call system in the 2nd floor of OPMC, the Rheumatology area. Electrocom is installing devices and programming only; all rough-in, cable, pathway, and | $33,670 |
| 6912319-EL | 2022-07-20 | Electrical | 135 32ND AVE | Installing intercom/clock, paging, and CRAV devices in a new addition to the existing building. All rough-in, pathway, cable, and high voltage by others. 7-20-22 DR - JV WITH SYSTE | $31,000 |
| 6857831-EL | 2021-09-10 | Electrical | 6000 16TH AVE SW | Installing paging and audio equipment throughout the new Wellness Center at South Seattle College. All rough-in, cable, and pathway, and high-voltage by others. | $42,000 |
| 6817639-EL | 2021-01-06 | Electrical | 4800 SAND POINT WAY NE | Installing nurse call and paging systems on multiple floors in the Building Care tower. Cable, pathway, and rough-in installed by others. | $617,454 |
| 6813261-EL | 2020-12-03 | Electrical | 4800 SAND POINT WAY NE | We are installing devices for the nursecall and paging systems in the RA.3 area at Seattle Children's Hospital. Cable, pathway, and rough-in installed by others. | $84,151 |
| 6807311-EL | 2020-10-26 | Electrical | 1550 N 115TH ST | Nurse call system replacement in the Childbirth Center of Northwest Hospital. All rough-in, pathway, and cable installed by others. | $107,000 |
| 6802156-EL | 2020-09-23 | Electrical | 6220 32ND AVE NE | Installing intercom and access control in the newest phase of the Assumption St. Bridget project. ALL CABLE, ROUGH-IN, AND PATHWAY PROVIDED AND INSTALLED BY OTHERS. | $68,500 |
| 6796816-EL | 2020-08-19 | Electrical | 4800 SAND POINT WAY NE | We are installing devices for the nursecall and paging systems in the RB.3 area at Seattle Children's Hospital | $69,435 |
| 6789326-EL | 2020-07-01 | Electrical | 4800 SAND POINT WAY NE | Adding nursecall devices to an existing system to support an area remodel. | $26,196 |
| 6784437-EL | 2020-05-28 | Electrical | 747 BROADWAY | We are installing a low voltage nurse call system throughout the Ambulatory Infusion Clinic at Swedish Medical Center First Hill. Cable, rough-in, and pathway are being provided an | $11,046 |
| 6729725-EL | 2019-05-29 | Electrical | 1550 N 115TH ST | Installing nurse call in B-Wing of NWH | $42,045 |
| 6725977-EL | 2019-05-06 | Electrical | 325 9TH AVE | Reterminating cables in an existing area of Harborview. | $3,245 |
| 6725947-EL | 2019-05-06 | Electrical | 325 9TH AVE | Installing corridor paging speakers throughout 1WH and ED areas of Harborview. | $7,025 |
| 6725345-EL | 2019-05-02 | Electrical | 4800 SAND POINT WAY NE | Installing nurse call and paging speakers throughout area River C4 of Seattle Children's Hospital | $120,610 |
| 6725343-EL | 2019-05-02 | Electrical | 4800 SAND POINT WAY NE | Installing nurse call and paging speakers throughout area River B4 of Seattle Children's Hospital. | $61,010 |
| 6714720-EL | 2019-02-28 | Electrical | 325 9TH AVE | Nurse call replacement throughout second floor | $71,168 |
| 6712413-EL | 2019-02-13 | Electrical | 747 N 135TH ST | Installing wireless nurse call system in SHT Tower 2 (formerly known as HMJ) | $153,625 |
| 6712407-EL | 2019-02-13 | Electrical | 747 N 135TH ST | Installing wireless nurse call system throughout SHT Tower 1. | $153,625 |
| 6709863-EL | 2019-01-25 | Electrical | 305 S LUCILE ST | Installing nurse call system and overhead paging speakers on two floors. | $24,778 |
| 6703164-EL | 2018-12-10 | Electrical | 4700 PHINNEY AVE N | Upgrading the Nurse Call system-- Responder 4000 to the Responder 5000. 12/9/2019 jnl renewal; 12/08/2020 AMA: Renew | $63,475 |
| 6694928-EL | 2018-10-22 | Electrical | 500 17TH AVE | Replace exiting Nurse Call System with Responder 5 | $38,269 |
| 6694799-EL | 2018-10-19 | Electrical | 500 17TH AVE | Installation of Cat6 and 14/2 cabling for (26) room locations, Lnets, and nurse's stations | $13,500 |
| 6694314-EL | 2018-10-17 | Electrical | 325 9TH AVE | Replacing existing Nurse Call System with New | $103,924 |
| 6689609-EL | 2018-09-20 | Electrical | 1550 N 115TH ST | Upgrading the Nurse Call system | $20,045 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →