COMPANY RECORD · SEATTLE, WA
Dickson Electric LLC — permit history in Seattle, WA
Dickson Electric LLC appears on 346 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 346 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 1 |
| 2017 | 2 |
| 2018 | 10 |
| 2019 | 7 |
| 2020 | 22 |
| 2021 | 34 |
| 2022 | 87 |
| 2023 | 41 |
| 2024 | 52 |
| 2025 | 48 |
| 2026 | 42 |
Busiest year on record: 2022, with 87 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Seattle permit, not only this company's
This page is a snapshot of Dickson Electric LLC. The search behind it holds more than 400,977 Seattle permits naming a contractor, since 2015: 251,769 electrical permits, 143,940 mechanical (HVAC) permits, 5,268 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Dickson Electric LLC files, or any new electrical permit in Seattle. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 510 OCCIDENTAL AVE S | 2026-10-26 |
| 5200 ROOSEVELT WAY NE | 2026-10-16 |
| 114 NW 83RD ST | 2026-10-09 |
| 114B NW 83RD ST | 2026-10-09 |
| 221 10TH AVE S | 2026-10-09 |
| 112 NW 83RD ST | 2026-09-30 |
| 5900 LAKE WASHINGTON BLVD S | 2026-09-17 |
| 2631 38TH AVE W | 2026-08-31 |
| 1527 NE 76TH ST | 2026-08-21 |
| 8132 10TH AVE SW | 2026-08-14 |
| 710 26TH AVE S | 2026-08-12 |
| 5919 SEAVIEW AVE NW | 2026-08-11 |
| 2819 NW 68TH ST | 2026-08-07 |
| 2820 40TH AVE W | 2026-08-07 |
301 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $250 to $100,000, median $1,350. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Dvac Heating&Air | 47 | 2020–2023 |
| Legacy One Heating | 46 | 2019–2024 |
| Seatown Electric, Plumbing, Heating & Air DBA Seatown Services | 21 | 2015–2026 |
| Adt LLC | 15 | 2015–2026 |
| Day & Nite Plumbing & Htg Inc | 15 | 2021–2024 |
| Kemly Electric, Inc. | 13 | 2016–2026 |
| Greenwood Heating & Home Services | 13 | 2018–2026 |
| As You Wish Electric | 12 | 2015–2026 |
Companies that also appear in Seattle permit records at addresses where Dickson Electric LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
346 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7169253-EL | 2026-10-26 | Electrical | 510 OCCIDENTAL AVE S | Provide and install (2) 8ft track light system in ceiling to light up custom pop culture and gaming mural. (max 16ft) Item:WAC-JT8-BK Provide and install up to (8) track heads po | |
| 7167936-EL | 2026-10-16 | Electrical | 5200 ROOSEVELT WAY NE | Provide and install (1) new 2X2 fixture in hallway as shown in attached picture. | |
| 7166861-EL | 2026-10-09 | Electrical | 114 NW 83RD ST | SFR - brand new construction | |
| 7166862-EL | 2026-10-09 | Electrical | 114B NW 83RD ST | AADU new construction | |
| 7166830-EL | 2026-10-09 | Electrical | 221 10TH AVE S | Trouble shoot and repair Lighting at Yessler Terrace Hill climb. | |
| 7165104-EL | 2026-09-30 | Electrical | 112 NW 83RD ST | New eLECTRICAL in an ADU | |
| 7163095-EL | 2026-09-17 | Electrical | 5900 LAKE WASHINGTON BLVD S | Scope of work: - Provide and install (1) 100a circuit from panel to new Kiln 15'-20' away, and make final connections. - Move existing 50a connection for smaller kiln to the righ | |
| 7161439-EL | 2026-09-04 | Electrical | 510 OCCIDENTAL AVE S | Provide and install (9) new bulbs in existing can lights. Ballast replacement not included in this estimate, additional fees will apply if ballast is deemed non-functional. Bulb | |
| 7160505-EL | 2026-08-31 | Electrical | 2631 38TH AVE W | Janine with Kimo (206) 499-4490 Al with Kimo 564-249-7224 New 200A panel next to the existing meter and extending all upstairs circuits to new panel location , Subpanel, new recept | |
| 7159362-EL | 2026-08-21 | Electrical | 1527 NE 76TH ST | - Provide and install new 60amp Exterior disconnect for EV charger. - Provide and install 15 6" canless LEDs model HLBSL609FS5 inside basement with HL6RSMF mounting frames. | |
| 7158174-EL | 2026-08-14 | Electrical | 8132 10TH AVE SW | New panel and basement remodel | |
| 7157815-EL | 2026-08-12 | Electrical | 710 26TH AVE S | Install new tamper resistant outlets and trim on all 120v receptacles throughout whole house up to 40 devices. Install AFCI/GFCI protection for each circuit modified by new device | |
| 7157579-EL | 2026-08-11 | Electrical | 5919 SEAVIEW AVE NW | Provide and install (1) new 15amp circuit for all new lighting in garage and main family room. EV charger -Provide and install (2) 6" canless cans on (1) new dimmer switch at custo | |
| 7157201-EL | 2026-08-07 | Electrical | 2819 NW 68TH ST | HVAC hook up | |
| 7157187-EL | 2026-08-07 | Electrical | 2820 40TH AVE W | Reinstall the following (2) owner provided lights: (1) Outside laundry room on ceiling. (1) Inside bedroom S of laundry room, (wall sconce) Reinstall (1) owner provided smoke d | |
| 7153781-EL | 2026-07-19 | Electrical | 3004 NW 59TH ST | Provide and install (1) new temporary pole for overhead service. Provide and install (1) 50amp gfci receptacle. Provide and install (2) gfci receptacles. Temporary pole to be | |
| 7153761-EL | 2026-07-17 | Electrical | 6302 5TH AVE NE | Electrical to shed and inside shed[8/7/2026 JBC Added 50amp Shed Feeder Panel to Permit] | |
| 7153765-EL | 2026-07-17 | Electrical | 112 NW 83RD ST | Temp power | |
| 7153760-EL | 2026-07-17 | Electrical | 888 SW 97TH ST | provide and install new 60amp EV circuit[8/3/2026 JBC Adress not in Seattle's Inspection Area/ Jurisdiction, ok to withdrawl permit.] | |
| 7152414-EL | 2026-07-10 | Electrical | 1917 NW 73RD ST | Electrical for bathroom and outlets | |
| 7151913-EL | 2026-07-08 | Electrical | 6246 39TH AVE NE | Carport circuit- Inspect existing carport wiring. verify wire size and install the appropriate breaker. (home inspection report says breaker is a 30amp and is on a 12AWG wire.) Squ | |
| 7146736-EL | 2026-06-05 | Electrical | 2911 2ND AVE | Cooktop circuit | |
| 7145448-EL | 2026-05-29 | Electrical | 921 NW 105TH ST | electrical to shed and inside shed | |
| 7144440-EL | 2026-05-21 | Electrical | 14335 40TH AVE NE | Provide and install (1) new decora switch with (2) new vanity light boxes, centered on each vanity sink | |
| 7143548-EL | 2026-05-17 | Electrical | 3020 S FINDLAY ST | Scope- Basement rewire Provide and install all new romex throughout downstairs to replace 2 wire circuitry. Provide and install new interconnected smoke detectors throughout downst | |
| 7142764-EL | 2026-05-12 | Electrical | 10111 GREENWOOD AVE N | -Provide and install (1) NEMA 3R 50amp EV receptacle approx. 6' from the electrical panel, (Additional length after the first 6' is $15 per foot) -Provide and install (1) 50amp | |
| 7140045-EL | 2026-04-24 | Electrical | 1512 NE 96TH ST | Wheel chair lift power- Extend existing 20amp circuit from Junction box under deck to new Fused Disconnect Approx. 20' from junction box under deck. | |
| 7139851-EL | 2026-04-23 | Electrical | 2327 NE 128TH ST | 1 temp 50amp GFCI circuit for construction use | |
| 7139191-EL | 2026-04-20 | Electrical | 1532 MCGILVRA BLVD E | (6) can lights on (1) switch. (2) exterior receptacles 50amp hot tub circuit, disconnect and final connection. (3) deck heater on timer switch with relay panel. (Heater material c | |
| 7139278-EL | 2026-04-20 | Electrical | 120 NW 39TH ST | Provide and replace (4) 20amp ITE breakers and (1) 15amp ITE breakers with Square D HOM breakers Provide and relocate on panel (2) 20 amp Square D single pole breakers to repla | |
| 7138964-EL | 2026-04-17 | Electrical | 1722 M L KING JR WAY S | -Provide and install (1) new 20amp circuit in existing HVAC 1/2" conduit to back of home approx. 60' from electrical panel. -Provide and install conduit from disconnect to extend | |
| 7138933-EL | 2026-04-17 | Electrical | 12536 33RD AVE NE | Level 6 Lighting- -Hallway ceiling tile on L6 will be replaced with all new ceiling tile due to water leak. -Ceiling grid to remain in place. -All lighting to remain | |
| 7137764-EL | 2026-04-10 | Electrical | 4835 NE 75TH ST | Electric inside shed | |
| 7134506-EL | 2026-03-20 | Electrical | 11300 1ST AVE NE | Provide and install new LED Emergency light fixtures at existing location | |
| 7134274-EL | 2026-03-19 | Electrical | 9514 48TH AVE NE | Pond circuit | |
| 7134355-EL | 2026-03-19 | Electrical | 4829 S KENNY ST | Provide and install new 200amp 40 space main breaker panel at current panel location. | |
| 7133987-EL | 2026-03-18 | Electrical | 2753 NE 103RD ST | Electrical to shed and inside shed | |
| 7132278-EL | 2026-03-06 | Electrical | 7750 30TH AVE SW | Provide and install new 200amp 40-80 space electrical panel to replace existing at current location. Install whole house surge protection. Install additional grounding if required. | |
| 7128321-EL | 2026-02-06 | Electrical | 6003 30TH AVE NW | ||
| 7123971-EL | 2026-01-07 | Electrical | 12222 8TH AVE NW | ||
| 7123371-EL | 2026-01-04 | Electrical | 14044 BAGLEY AVE N | ||
| 7123369-EL | 2026-01-04 | Electrical | 1300 N 130TH ST | Provide and install new 75KVA transformer (high wall mounted) Provide and install new 200amp 208v 3 phase panel. Provide and install (2) 50amp 208v circuits for EV chargers. Pr | |
| 7121086-EL | 2025-12-12 | Electrical | 7309 RAVENNA AVE NE | Provide and install (1) new 20amp circuit to detached garage. Total circuit length approx. 75' (40' through trench and 35' through basement/crawl) | $2,000 |
| 7119962-EL | 2025-12-05 | Electrical | 6926 39TH AVE SW | Provide and install new 200amp 40-80 space electrical panel to replace existing at current location. Install whole house surge protection. Install additional grounding if required. | $4,000 |
| 7116777-EL | 2025-11-14 | Electrical | 3731 NE 130TH ST | Electrical to and inside shed | $3,000 |
| 7113629-EL | 2025-10-25 | Electrical | 8211 S 126TH ST | Replace Devices in areas that sheetrock was removed: -10) single pole switches -1) stack switch -2) 3-way switches -1) timer -1) dimmer -3) GFCI receptacles -10) receptacl | $4,000 |
| 7112293-EL | 2025-10-17 | Electrical | 4803 NE CROWN PL | Provide and install new 240v 40amp Sauna circuit approximately 20ft away from panel. Provide and install (1) pullout disconnect. Provide 10ft trench from house to back of Sauna. Pr | $2,000 |
| 7111698-EL | 2025-10-14 | Electrical | 8206 CORLISS AVE N | -Provide and install power to new laundry room approx. 20' from electrical panel. -Relocate old stair lift circuit to be new washer circuit. -Provide and install 1 new 30 | $2,000 |
| 7111199-EL | 2025-10-10 | Electrical | 11306 ALTON AVE NE | Provide and install (1) GFCI with bubble cover to replace existing at current location. Provide and install (1) "Dusk to Dawn" Programable 12v transformer. Provide and install up | $2,000 |
| 7110520-EL | 2025-10-07 | Electrical | 6513A 24TH AVE NE | Provide and install (1) new 240v 20amp GE Breaker to replace existing 30amp in panel for new in wall heater. Living Room- Provide and install (1) new 240v 2000w cadet in-wall h | $1,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
