Definitive Audio — permit history in Seattle, WA

Definitive Audio appears on 38 Seattle permit records from 2018 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical38100%

Activity by year

YearPermits issued
20183
20199
20202
20216
20225
20236
20245
20251
20261

Busiest year on record: 2019, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1645 BROADMOOR DR E2026-04-28
2929 1ST AVE2025-11-14
7700 SAND POINT WAY NE2024-11-26
2121 TERRY AVE2024-06-13
1920 4TH AVE2024-04-16
1500 4TH AVE2024-01-09
222 DEXTER AVE N2023-11-07
2821 2ND AVE2023-10-18
2256 38TH PL E2023-05-22
316 2ND AVE S2023-03-29
1700 7TH AVE2023-03-21
206 S BRANDON ST2022-07-18
4750 44TH AVE NE2022-06-21
3400 NW 57TH ST2022-05-24

34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,800 to $1,200,000, median $20,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

38 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7140375-EL2026-04-28Electrical1645 BROADMOOR DR ELow Voltage Permit. Installing distributed audio, network and low voltage keypads for a lighting control system. Please reference permit 7055954-EL the permit is expired and is un
7116725-EL2025-11-14Electrical2929 1ST AVEThis is a multi-phase project where we will do rough-in, trim, and final for audio, video, shades, and networking.$45,000
7060658-EL2024-12-12Electrical2929 1ST AVEThis is a multi-phase project (rough-in, trim, and final) for an A/V system in four areas of the condo.$61,752
7058231-EL2024-11-26Electrical7700 SAND POINT WAY NEWe will be running a new category cable from the equipment location to the newly installed projector. The category cable will be used with an HDMI extender.$25,000
7030452-EL2024-06-13Electrical2121 TERRY AVEWe will be installing new TV in three areas Family Room, Guest Bedroom, and Primary Bedroom. We will also be trimming out network cables and providing a new network.$15,000
7019753-EL2024-04-16Electrical1920 4TH AVEWe are adding a new projector, projection screen, and front LCR. [04/16/24 BGO - Plan Review Waived]$15,000
7003787-EL2024-01-09Electrical1500 4TH AVEThis will be a multi phase project for a new theater space in the clients homes.$10,000
6994588-EL2023-11-07Electrical222 DEXTER AVE NWe will be doing trim and final for the 222 Dexter project. The work will be taking place on floors one, two, three, six, and 31 in the amenity spaces. The systems are comprised of$30,000
6991759-EL2023-10-18Electrical2821 2ND AVEWe will be relocating some cabling and adding cables for the new AV equipment in the bar. The primary system will be a TV with speakers and comcast. Wiring being run in walls. - L$4,000
6988493-EL2023-09-29Electrical2821 2ND AVEAudio video update in the office that is being converted to a bar. The room will have a new TV and audio system.$5,000
6966025-EL2023-05-22Electrical2256 38TH PL EThis is a multi-phase project (rough-in, trim, and final) for a distributed audio and video system. Closed: no apparent safety hazards.; [3/17/26 RN Amended record - revoking stat$222,000
6955845-EL2023-03-29Electrical316 2ND AVE SRetro in the Gallery. System is comprised of a project, screen, 7.1 ch speaker system.$25,000
6954292-EL2023-03-21Electrical1700 7TH AVEWe will be doing trim and final in the amenity's spaces on the 3rd floor (Gym, Yoga Room, Women's Restroom, Men's Restroom, and IDF) and 10th floor (Men's Restroom, Women's Restroo$126,000
6911216-EL2022-07-18Electrical206 S BRANDON STThis is a multi-phase project in which Definitive will rough-in (Media Room Only), trim and final the proposed system in a remodeled commercial space located in Seattle. Definitiv$6,165
6906770-EL2022-06-21Electrical4750 44TH AVE NEInstall conduit from demark to shed. Run 2 direct burial CAT6 from demark to shed through LB. 1 direct burial CAT6 to switch and 1 direct burial CAT6 for COG access point. Run four$4,028
6901711-EL2022-05-24Electrical3400 NW 57TH STThis is a multi-phase project in which Definitive will rough-in, trim, and final install the proposed system in a remodeled home located in Seattle, WA. Definitive will design and $20,000
6901719-EL2022-05-24Electrical3027 WEST LAURELHURST DR NEThis is a multi-phase project in which Definitive will rough-in and trim the proposed system in a new home located in Seattle. Definitive will design and document the proposed syst$57,000
6878306-EL2022-01-19Electrical5736 64TH AVE NEThis is a multi-phase project in which Definitive will retrofit and final the proposed system in an existing home located in Seattle. In addition, Definitive will design and docume$93,000
6847078-EL2021-07-07Electrical401 NE NORTHGATE WAYAmplification and audio control$1,200,000
6845841-EL2021-06-28Electrical2256 38TH PL ELow Volt rough in with shades, crestron AV etc$222,000
6838243-EL2021-05-12Electrical3917 E OLIVE STLow voltage electrical rough in$10,000
6834027-EL2021-04-16Electrical1707 3RD AVE NThis is a multi-phase project in which Definitive will rough-in and install the proposed system in an existing home located in Seatte, WA. Definitive will design and document the p$25,000
6823449-EL2021-02-12Electrical6451 NE WINDERMERE RDLow voltage wiring for 11 shades, 12 TV locations, and 14 distributed audio zones.$69,000
6819287-EL2021-01-18Electrical116 NE 59TH ST*Extended 4/19/2022, EC* Installation of Low voltage wire for Audio, distributed cable television, network and lighting control$26,664
6792073-EL2020-07-21Electrical805 MADISON STlow volt trim install - 65" displays and nine in-ceiling speakers$20,950
6775641-EL2020-03-09Electrical701 5TH AVElow volt trim install - projector, ceiling mount, 75" displays, fourteen in ceiling speakers, in wall wired streaming device, In wall touch screen control system$16,547
6752787-EL2019-10-10Electrical800 5TH AVELow voltage AV upgrade in the lobby, conference room, cafe, putting green, Think Tank, and MEC$16,000
6752230-EL2019-10-08Electrical2040 43RD AVE ERough in of master bed room, guest room and living room Unit 610$5,000
6744361-EL2019-08-21Electrical6332 37TH AVE SWPre wire/ trim final- pulling cat6, rg6, speaker$3,000
6743382-EL2019-08-14Electrical1623 9TH AVE Wlow voltage rough in. 9/23/2021 add (30) control units, (23) devices$20,000
6743379-EL2019-08-14Electrical8000 25TH AVE NELow voltage end points, 2 touch panels, 3 hdmi input, 3 display 1 usb input$20,000
6742750-EL2019-08-12Electrical7603 LATONA AVE NEpre wire for 12 in ceiling speakers$2,800
6742002-EL2019-08-07Electrical1116 26TH AVE SPre wire for 12 in ceiling speakers$2,800
6737056-EL2019-07-10Electrical701 5TH AVELow volt install of 34 speakers and 2 control points$50,000
6734674-EL2019-06-25Electrical800 5TH AVEPulling LV wiring for 66 TV's$400,000
6696822-EL2018-10-31Electrical3959 NE SURBER DRPulling new Network CAT6 feeds from LV panel to designated locations$30,000
6693957-EL2018-10-16Electrical2000 3RD AVELOW VOLTAGE - AUDIO VIDEO CONTOL POINTS VIDEO SCREENS SECURITY$20,000
6690706-EL2018-09-27Electrical5713 20TH AVE NWOne-room Audio-Video Installation with prewire of CAT6 and speaker wiring (Low Voltage)$3,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →