COMPANY RECORD · SEATTLE, WA
D&S Electrical Contractors Inc — permit history in Seattle, WA
D&S Electrical Contractors Inc appears on 69 Seattle permit records from 2018 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 69 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2018 | 10 |
| 2019 | 4 |
| 2020 | 7 |
| 2021 | 10 |
| 2022 | 17 |
| 2023 | 8 |
| 2024 | 6 |
| 2025 | 6 |
| 2026 | 1 |
Busiest year on record: 2022, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 508 N 36TH ST | 2026-03-02 |
| 401 NE NORTHGATE WAY | 2025-12-04 |
| 3831 STONE WAY N | 2025-09-30 |
| 3860 BRIDGE WAY N | 2025-09-08 |
| 3839 STONE WAY N | 2025-03-27 |
| 21 BOSTON ST | 2024-10-29 |
| 1100 BOYLSTON AVE | 2024-06-28 |
| 2626 15TH AVE W | 2024-06-14 |
| 2517 EASTLAKE AVE E | 2024-05-16 |
| 1801 E YESLER WAY | 2023-12-07 |
| 901 S MAIN ST | 2023-11-16 |
| 2100 QUEEN ANNE AVE N | 2022-11-17 |
| 11201 ROOSEVELT WAY NE | 2022-10-18 |
| 1414 SPRING ST | 2022-10-05 |
35 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $8,635,478, median $20,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
69 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7129950-EL | 2026-03-02 | Electrical | 508 N 36TH ST | 800AMP TEMP POWER SERVICE [3/2/26 BGO - Approved Temp Service Plan] | $30,000 |
| 7119721-EL | 2025-12-04 | Electrical | 401 NE NORTHGATE WAY | ADD ELECTRICAL TO NEW LOCKER ROOMS [3/4/2026 PGF Changed address from 401 NE Northgate Way to 10601 5th Ave NE.] | $15,000 |
| 7056273-EL | 2025-09-30 | Electrical | 3831 STONE WAY N | The project will consist of a 7-story building with approximately 230 market rate apartments. There will be street level commercial, two below grade parking levels, and on-site am | $8,635,478 |
| 7105482-EL | 2025-09-08 | Electrical | 3860 BRIDGE WAY N | Install new recep and ltg in office space | $5,000 |
| 7105477-EL | 2025-09-08 | Electrical | 3860 BRIDGE WAY N | Remodel Office, Ltg, Recep adds | $5,000 |
| 7096185-EL | 2025-07-15 | Electrical | 401 NE NORTHGATE WAY | Level 2, Sector A Remodel of existing office space. | $30,000 |
| 7076710-EL | 2025-03-27 | Electrical | 3839 STONE WAY N | 800AMP TEMP POWER FOR CONSTRUCTION [03/27/25 BGO - Approved Temp Power Plan] [10/14/2025 Approved Revised One-line; 200A for crane increased to 400A]***[C.Kenefick 3/30/2026 - perm | $20,000 |
| 7053714-EL | 2024-10-29 | Electrical | 21 BOSTON ST | CONNECTION TO 480V LIFT 20AMPS PANEL HNE1:25,27,29 BRANCH CIRCUIT | $500 |
| 7053717-EL | 2024-10-29 | Electrical | 21 BOSTON ST | CONNECTION TO CARGO LIFT IN TRASH ROOM B253 208V, 30A, CKT LB3:16,18,20 | $500 |
| 7033196-EL | 2024-06-28 | Electrical | 1100 BOYLSTON AVE | Wiring for Trash Shoots | $1,000 |
| 7027509-EL | 2024-06-14 | Electrical | 2626 15TH AVE W | ELECTRICAL COMPLETE 109 APARTMENT UNITS [ 11-22-24 BZ Revision Approved] | $2,000,000 |
| 7025451-EL | 2024-05-16 | Electrical | 2517 EASTLAKE AVE E | HOOK UP LINE VOLTAGE, AND LOW VOLTAGE TO GARAGE DOOR | $1,500 |
| 7004968-EL | 2024-01-24 | Electrical | 2626 15TH AVE W | 600AMP TEMP SERVICE FOR CONSTRUCTION | $10,000 |
| 6999665-EL | 2023-12-07 | Electrical | 1801 E YESLER WAY | CONNECTION TO 25KVA GENERATOR | $5,000 |
| 6992139-EL | 2023-11-16 | Electrical | 901 S MAIN ST | 800A TEMP SERVICE 480V FOR PROJECT. ALL FUSES ARE 200,000 AIC RATED. 9/9/2024 jnl renewal. 10/16/2024 jnl renewal | $25,000 |
| 6996620-EL | 2023-11-16 | Electrical | 901 S MAIN ST | 200A TEMP SERVICE FOR TRAILER POWER | $5,000 |
| 6945238-EL | 2023-09-12 | Electrical | 901 S MAIN ST | 100% affordable family housing consisting of residential units and supporting spaces. Building consists of 7 stories of 1-, 2-, 3-, and 4-bedroom units totaling 114 units and below | $5,657,015 |
| 6955627-EL | 2023-05-10 | Electrical | 2517 EASTLAKE AVE E | NEW 600A 480V SERVICE ALL DISCONNECTS HEAVY DUTY 200KAIC RATED PLEASE CALL FOR QUESTIONS JOSH MELBIHESS 509-295-8264 | [email protected] | $15,000 |
| 6936360-EL | 2023-03-22 | Electrical | 1801 E YESLER WAY | 101 APARTMENT UNITS, AND CHILD CARE TI 3-22-23 DR - APPROVED DRAWINGS AND ISSUED PERMIT. [2-21-24 DR - extended permit for an additional year.] | $2,000,000 |
| 6947451-EL | 2023-02-10 | Electrical | 1801 E YESLER WAY | UFER GROUND FOR BRYANT MANOR temp tower crane | $1,000 |
| 6894832-EL | 2023-01-23 | Electrical | 1801 E YESLER WAY | 600A TEMP POWER SERVICE | $22,000 |
| 6924557-EL | 2022-11-29 | Electrical | 1801 E YESLER WAY | 600A 3 PHASE 480V TEMPORARY POWER SERVICE [11-18-23 DR - permit extended for one year] | $25,000 |
| 6907178-EL | 2022-11-17 | Electrical | 2100 QUEEN ANNE AVE N | 4-26-24 BZ Updated Revision #2 for error. 4-24-24 BZ Revision #2 Approved. 2-13-23 Revision Approved SAFEWAY STORE BUILDOUT. 8/19/24 SK renewal | $1,200,000 |
| 6889527-EL | 2022-10-18 | Electrical | 11201 ROOSEVELT WAY NE | NEW ELECTRICAL SYSTEMS TO SUPPORT THE CONSTRUCTION OF A 5-STORY APARTMENT BUILDING WITH 296 UNITS AND 4 LIVE-WORK UNITS, RESIDENTIAL COMMON AREAS, LEASING SPACE, AND 2 BELOW GRADE | $6,180,610 |
| 6925253-EL | 2022-10-05 | Electrical | 1414 SPRING ST | REFEED 600A SERVICE VIA UNDERGROUND AND DEMO EXISTING OVER HEAD SERVICE FROM SCL. NO OTHER MODIFICATIONS. | $6,000 |
| 6925269-EL | 2022-09-29 | Electrical | 1115 HARVARD AVE | INSTALL NEW METER AND REROUTE CONDUIT | $8,500 |
| 6925259-EL | 2022-09-29 | Electrical | 1111 HARVARD AVE | EXTEND 2-1/2" CONDUIT FOR OVERHEAD DROP | $1,000 |
| 6919604-EL | 2022-08-29 | Electrical | 1200 BOYLSTON AVE | RUN (4) 4" CONDUITS FROM BUILDING ENTRANCE TO SCL VAULT. Closed: no apparent safety hazards. | $40,000 |
| 6912601-EL | 2022-07-21 | Electrical | 200 10TH AVE S | Install 200Amp Single Phase Service, Install 6 pole lights , and 2 receptacles | $50,000 |
| 6910527-EL | 2022-07-11 | Electrical | 5705 S DAWSON ST | REINSTALL DAMAGED SERVICE ENTRANCE CONDUCTORS, 100A SERVICE | $1,000 |
| 6893048-EL | 2022-06-10 | Electrical | 11201 ROOSEVELT WAY NE | 600A TEMP SERVICE FOR PROJECT TEMP POWER 480V, 3 PHASE. 06/10/22 JK APPROVED PLANS. 07/15/22 JK APPROVED REVISED PLANS. | $25,000 |
| 6903212-EL | 2022-06-10 | Electrical | 2100 QUEEN ANNE AVE N | 600A TEMP SERVICE 480V FOR CONSTRUCTION | $30,000 |
| 6903237-EL | 2022-06-10 | Electrical | 100 DENNY WAY | ADD NEW 600A PANEL AND 200A PANEL FROM EXISTING SWITCHBOARD TO SPACE, ADD LIGHT FIXTURES AND EXITS | $100,000 |
| 6881096-EL | 2022-06-09 | Electrical | 8610 AURORA AVE N | ELECTRICAL UNDERGROUND, DISTRUPUTION, SERVICE AND FEEDERS, LEVEL 1 BRANCH POWER ONLY. ALL OTHER WORK BY OTHERS | $800,000 |
| 6882421-EL | 2022-05-04 | Electrical | 1100 BOYLSTON AVE | NEW CONST. 227 APT UNITS [4/20/2023 PGF Extended permit to 5/4/2024] [02/22/2024 BGO - New AFC calculations accepted for feeders that differed from the one line] [5-3-24 DR - Exten | $3,250,000 |
| 6895713-EL | 2022-04-22 | Electrical | 2100 QUEEN ANNE AVE N | UTILITY WORK ON 21 BOSTON (ELECTRICAL & DATA INFRASTRUCTURE. | $100,000 |
| 6861978-EL | 2022-04-06 | Electrical | 2517 EASTLAKE AVE E | 8-23-22 BZ Revision Approved. 207 Apartment Units with in Ground Parking. 4/4/23 AB: Renewal | $4,000,000 |
| 6878279-EL | 2022-01-19 | Electrical | 568 1ST AVE S | Add new light fixtures, and add one electrical outlet | $2,000 |
| 6873085-EL | 2021-12-28 | Electrical | 8610 AURORA AVE N | 600A, 480V, 3PHASE, TEMPORARY SERVICE FOR CONSTRUCTION | $15,000 |
| 6874552-EL | 2021-12-21 | Electrical | 946 N 87TH ST | 200A OVERHEAD SERVICE FOR TEMP POWER FOR TRAILERS | $5,000 |
| 6851987-EL | 2021-08-20 | Electrical | 2517 EASTLAKE AVE E | 800A Temp Power Service for Construction. 7/28/2022 renewal | $8,000 |
| 6847148-EL | 2021-08-19 | Electrical | 1100 BOYLSTON AVE | 800A TEMP POWER SERVICE FOR CONSTRUCTION. 7/20/2022 renewal | $15,000 |
| 6851341-EL | 2021-08-02 | Electrical | 209 12TH AVE S | Install Raceway for AV System | $30,000 |
| 6819301-EL | 2021-04-07 | Electrical | 1020 S MAIN ST | 215 Unit Mixed use Project with Below Grade Parking 4-7-21 DWR APPROVED PLANS. 3/2/2022 renewal | $3,250,000 |
| 6821187-EL | 2021-03-30 | Electrical | 400 QUEEN ANNE AVE N | 4-20-22 BZ Revision Approved. 143 UNIT MIXED USE PROJECT WITH UNDERGROUND PARKING. 3/2/2022 renewal | $2,600,000 |
| 6821729-EL | 2021-02-22 | Electrical | 400 QUEEN ANNE AVE N | 400A 480V TEMP POWER FOR PROJECT. 2/25/22 JSS Extended permit 1 year, ongoing project. | $16,000 |
| 6824141-EL | 2021-02-17 | Electrical | 568 1ST AVE S | Demo, and reinstall electrical outlets, relocate and install light fixtures, for new office spaces they are framing | $5,000 |
| 6820068-EL | 2021-02-05 | Electrical | 1401 NW 46TH ST | ADD 8 Fire alarm devices to existing project, relocate existing devices where needed | $8,000 |
| 6813581-EL | 2020-12-07 | Electrical | 1401 NW 46TH ST | Remodel of existing space to add light fixture, exit sign, and relocate heater and fire alarm device. Conduit added for switch and power for light expanded. | $8,000 |
| 6813582-EL | 2020-12-07 | Electrical | 1401 NW 46TH ST | Add (2) 2" Conduits from Main Electrical room in P1 Basement to Tenant Space Suite 100 for future tenant. | $22,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →