COMPANY RECORD · SEATTLE, WA
Custom Electrical Cont — permit history in Seattle, WA
Custom Electrical Cont appears on 371 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 371 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 9 |
| 2016 | 6 |
| 2017 | 10 |
| 2018 | 23 |
| 2019 | 46 |
| 2020 | 77 |
| 2021 | 53 |
| 2022 | 29 |
| 2023 | 35 |
| 2024 | 50 |
| 2025 | 25 |
| 2026 | 8 |
Busiest year on record: 2020, with 77 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4712 PUGET WAY SW | 2026-05-28 |
| 4716 PUGET WAY SW | 2026-05-26 |
| 4708 PUGET WAY SW | 2026-05-26 |
| 1525 NE 92ND ST | 2026-04-22 |
| 903 32ND AVE | 2026-04-14 |
| 8436 42ND AVE SW | 2026-03-17 |
| 2622 MAYFAIR AVE N | 2025-12-09 |
| 3625 BAGLEY AVE N | 2025-11-10 |
| 2601 50TH AVE SW | 2025-10-27 |
| 5025 SW WAITE ST | 2025-10-27 |
| 8606 7TH AVE S | 2025-09-03 |
| 8600 7TH AVE S | 2025-09-03 |
| 8602 7TH AVE S | 2025-09-03 |
| 8610 7TH AVE S | 2025-09-03 |
222 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,500,000, median $7,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
371 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7145320-EL | 2026-05-28 | Electrical | 4712 PUGET WAY SW | 200A New construction SFR | |
| 7144702-EL | 2026-05-26 | Electrical | 4716 PUGET WAY SW | 200A New construction SFR | |
| 7144701-EL | 2026-05-26 | Electrical | 4708 PUGET WAY SW | 200A New construction SFR | |
| 7139723-EL | 2026-04-22 | Electrical | 1525 NE 92ND ST | Full house rewire with new 200A panel | |
| 7138371-EL | 2026-04-14 | Electrical | 903 32ND AVE | Remodel existing basement- add 4 new circuits | |
| 7133890-EL | 2026-03-17 | Electrical | 8436 42ND AVE SW | New construction, single family residence | |
| 7123624-EL | 2026-01-05 | Electrical | 4708 PUGET WAY SW | Temp Power | |
| 7123625-EL | 2026-01-05 | Electrical | 4716 PUGET WAY SW | Temp Power | |
| 7120389-EL | 2025-12-09 | Electrical | 2622 MAYFAIR AVE N | Overhead temporary power pole | $300 |
| 7116074-EL | 2025-11-10 | Electrical | 3625 BAGLEY AVE N | Remodel existing and 3rd floor addition | $10,000 |
| 7114097-EL | 2025-10-28 | Electrical | 2622 MAYFAIR AVE N | 200A New construction SFD | $15,000 |
| 7113674-EL | 2025-10-27 | Electrical | 2601 50TH AVE SW | 600A New construction SFR/ADU/DADU [ 10/27/25 VR, SFR/ADU 5027/5025 SW Waite ST Permit 7112666-EL // DADU 2601 50th Ave SW Permit 7113674-EL ] | $0 |
| 7112666-EL | 2025-10-27 | Electrical | 5025 SW WAITE ST | 600A New construction SFR/ADU/DADU [ 10/27/25 VR, SFR/ADU 5027/5025 SW Waite ST Permit 7112666-EL // DADU 2601 50th Ave SW Permit 7113674-EL ] | $25,000 |
| 7104801-EL | 2025-09-03 | Electrical | 8606 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/3/25 VR Unit #4] | $0 |
| 7104781-EL | 2025-09-03 | Electrical | 8600 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/3/25 VR, Unit #1] | $0 |
| 7103150-EL | 2025-09-03 | Electrical | 8602 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/3/25 VR, Unit #2] | $65,000 |
| 7104806-EL | 2025-09-03 | Electrical | 8610 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/3/25 VR Unit #6] | $0 |
| 7104803-EL | 2025-09-03 | Electrical | 8608 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/2/25 VR, Unit #5] | $0 |
| 7104789-EL | 2025-09-03 | Electrical | 8604 7TH AVE S | 600A 6 unit condo building with 100A unit panels [9/3/25 VR, Unit 3] | $0 |
| 7104116-EL | 2025-08-28 | Electrical | 2731 50TH AVE SW | New Construction- 2 story, SFD | $22,500 |
| 7100406-EL | 2025-08-06 | Electrical | 2609 E DENNY WAY | New electrical for remodel addition- Kitchen, Master | $7,500 |
| 7097701-EL | 2025-07-22 | Electrical | 2601 50TH AVE SW | 200A Remodel with addition DADU [10/24/25 VR, see Plan Review permit 7112666-EL] | $7,500 |
| 7092259-EL | 2025-06-19 | Electrical | 4316 SW HOLLY ST | New Construction, 3- story townhomes, 1 building, 3 units | $35,000 |
| 7091311-EL | 2025-06-15 | Electrical | 6357 38TH AVE SW | 200A New construction SFR | $15,000 |
| 7091312-EL | 2025-06-15 | Electrical | 6357 38TH AVE SW | 125A New construction ADU | $7,500 |
| 7091313-EL | 2025-06-15 | Electrical | 3812 SW MORGAN ST | 125A New construction DADU | $7,500 |
| 7081704-EL | 2025-04-21 | Electrical | 1000 UNION ST | 100A Subpanel replacement in unit 311 | $1,500 |
| 7078591-EL | 2025-04-02 | Electrical | 4800 51ST PL SW | New Construction Electrical[6/23/2026 JBC Added Renewal to permit] | $22,500 |
| 7074614-EL | 2025-03-10 | Electrical | 4238 NE 73RD ST | Complete rewire and new service on a full remodel SFD | $15,000 |
| 7073138-EL | 2025-03-02 | Electrical | 4570 23RD AVE SW | 200A New construction SFD | $15,000 |
| 7071015-EL | 2025-02-18 | Electrical | 3611 59TH AVE SW | 320A New construction SFD | $25,000 |
| 7066651-EL | 2025-01-22 | Electrical | 4548 23RD AVE SW | 200A New construction SFR | $15,000 |
| 7063981-EL | 2025-01-08 | Electrical | 4576 22ND AVE SW | 200A New construction SFR | $15,000 |
| 7060154-EL | 2024-12-09 | Electrical | 4570 22ND AVE SW | 200A New construction SFR | $150 |
| 7058942-EL | 2024-12-02 | Electrical | 4572 22ND AVE SW | 200A New construction SFR | $15,000 |
| 7057963-EL | 2024-11-24 | Electrical | 4570 22ND AVE SW | 200A New construction SFR | $15,000 |
| 7056864-EL | 2024-11-18 | Electrical | 4316 SW HOLLY ST | Overhead temp power pole | $250 |
| 7056336-EL | 2024-11-13 | Electrical | 4566 22ND AVE SW | 200A New construction SFR | $15,000 |
| 7054096-EL | 2024-10-31 | Electrical | 215 HIGHLAND DR | New Construction, with ADU - Electrical. (Permit extended out until November 11th 2025 by district inspector PJR on 10-14-2025 for in residence elevator inspection). | $20,000 |
| 7052423-EL | 2024-10-21 | Electrical | 4548 23RD AVE SW | ufer ground only | $150 |
| 7051104-EL | 2024-10-14 | Electrical | 4576 22ND AVE SW | 200A New construction SFR | $150 |
| 7049442-EL | 2024-10-04 | Electrical | 2727 50TH AVE SW | New Construction 3 Story -SFD | $18,500 |
| 7048245-EL | 2024-09-27 | Electrical | 4548 23RD AVE SW | Temporary power | $150 |
| 7045052-EL | 2024-09-09 | Electrical | 8828 38TH AVE SW | 200A New construction SFR | $15,000 |
| 7045053-EL | 2024-09-09 | Electrical | 8828B 38TH AVE SW | 125A New construction ADU | $12,000 |
| 7044428-EL | 2024-09-05 | Electrical | 4570 22ND AVE SW | ufer permit | $50 |
| 7044427-EL | 2024-09-05 | Electrical | 4572 22ND AVE SW | Ufer inspection | $50 |
| 7044429-EL | 2024-09-05 | Electrical | 4566 22ND AVE SW | ufer permit | $50 |
| 7038595-EL | 2024-07-31 | Electrical | 8826 38TH AVE SW | 125A New construction DADU | $7,500 |
| 7038594-EL | 2024-07-31 | Electrical | 8824B 38TH AVE SW | 125A new construction ADU | $7,500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
