Comprehensive Electrical Services — permit history in Seattle, WA
Comprehensive Electrical Services appears on 57 Seattle permit records from 2018 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 57 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2018 | 5 |
| 2019 | 5 |
| 2020 | 3 |
| 2021 | 6 |
| 2022 | 16 |
| 2023 | 3 |
| 2024 | 3 |
| 2025 | 9 |
| 2026 | 7 |
Busiest year on record: 2022, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5019 46TH AVE NE | 2026-08-18 |
| 4233 7TH AVE NE | 2026-06-09 |
| 6002 51ST AVE NE | 2026-05-11 |
| 7737 19TH AVE NE | 2026-05-06 |
| 1418 33RD AVE | 2026-03-09 |
| 8416 DUNCAN AVE S | 2026-02-18 |
| 615 WESTLAKE AVE N | 2026-02-03 |
| 11720 16TH AVE NE | 2025-09-25 |
| 5450 LEARY AVE NW | 2025-07-26 |
| 1633 BELLEVUE AVE | 2025-05-09 |
| 7540 19TH AVE NW | 2025-04-22 |
| 938 22ND AVE E | 2025-03-31 |
| 5219 56TH AVE S | 2025-01-22 |
| 8123 49TH AVE S | 2024-05-15 |
51 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $650 to $28,000, median $3,600. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
57 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7158745-EL | 2026-08-18 | Electrical | 5019 46TH AVE NE | replace remaining knob and tube wiring that was present in home with new 3 wire system, also replaced circuit for dryer new wiring was routed to outlets , some lights and switches | |
| 7147093-EL | 2026-06-09 | Electrical | 4233 7TH AVE NE | Remodel of unit #107. Panel swap, kitchen alteration, bathroom alteration, in wall heater update. | |
| 7142473-EL | 2026-05-11 | Electrical | 6002 51ST AVE NE | Remodel of bathroom in basement | |
| 7141916-EL | 2026-05-06 | Electrical | 7737 19TH AVE NE | Rewire knob and tube circuits in home, add elc heater, add 60A sub panel for altered circuits. | |
| 7132604-EL | 2026-03-09 | Electrical | 1418 33RD AVE | Remove and replace meter base with exterior disconnect 200A rating. Install new panel with additional circuit space 200A. Update grounding and bonding. | |
| 7129934-EL | 2026-02-18 | Electrical | 8416 DUNCAN AVE S | Note from property owner: I got this notice from the city, see below. (8416 Duncan AVE S, Seattle). Everything is done, would just need a permit pulled and passed. Is this someth | |
| 7127793-EL | 2026-02-03 | Electrical | 615 WESTLAKE AVE N | ||
| 7111503-EL | 2025-10-13 | Electrical | 8416 DUNCAN AVE S | Associated EL permit 7090768-EL. Previous electrical contractor would not return to fix failed inspection at residence. Customer hired CES to fix issues on load side of meter base. | $2,500 |
| 7108691-EL | 2025-09-25 | Electrical | 11720 16TH AVE NE | Meter base replacement, like for like 200A. Old meter base failed and lost a phase. emergency repair to restore service power to residence. | $4,000 |
| 7098509-EL | 2025-07-26 | Electrical | 5450 LEARY AVE NW | Convert base board heat circuit into disconnect for mini-split/ heat pump system. | $1,200 |
| 7085035-EL | 2025-05-09 | Electrical | 1633 BELLEVUE AVE | Add Dryer and microwave circuit | $1,500 |
| 7082072-EL | 2025-04-22 | Electrical | 7540 19TH AVE NW | Service change with external disconnect on outside of home. New panel in garage. | $5,500 |
| 7078283-EL | 2025-04-01 | Electrical | 1633 BELLEVUE AVE | 20AMP microwave circuit dedicated | $1,100 |
| 7078187-EL | 2025-03-31 | Electrical | 938 22ND AVE E | Place Sub -panel in garage and power EV charger. | $2,500 |
| 7069835-EL | 2025-02-11 | Electrical | 1633 BELLEVUE AVE | Wire dedicated 20AMP/ 120v circuit for microwave/hood fan in unit 304 | $1,200 |
| 7066438-EL | 2025-01-22 | Electrical | 5219 56TH AVE S | Swap 200AMP main panel, like for like. 50AMP EV outlet on exterior of garage. | $3,500 |
| 7025127-EL | 2024-05-15 | Electrical | 8123 49TH AVE S | Knob and Tube rewire upstairs and some areas in the lower living area. | $4,500 |
| 7018068-EL | 2024-04-04 | Electrical | 5504 BROOKLYN AVE NE | Removing old split bus panel and replacing with new. Will have main breaker in new panel. Same amperage as before. 125AMP Update grounding and bonding systems. | $4,000 |
| 7013050-EL | 2024-03-06 | Electrical | 1633 BELLEVUE AVE | install dedicated circuit in Unit 310 and unit 603 | $2,000 |
| 6999288-EL | 2023-12-05 | Electrical | 2421 SW MYRTLE ST | remove old panel and install new panel like for like | $2,800 |
| 6984403-EL | 2023-09-06 | Electrical | 4201 SW JUNEAU ST | Fire restoration on multiple floor and areas of church. [9/12/2024 PGF Renewed permit. Extended for 1-year. Renewal fee included.] | $14,000 |
| 6971470-EL | 2023-06-20 | Electrical | 115 W SMITH ST | replace remaining knob and tube circuits in home, also replace old 200 amp panel with new 200 amp panel | $15,000 |
| 6937365-EL | 2022-12-07 | Electrical | 8054 28TH AVE NW | install two dedicated circuits for two hardwired appliances in kitchen they are not cord connected | $850 |
| 6935543-EL | 2022-11-28 | Electrical | 8718 19TH AVE NW | this is completing work for existing permit # 6891264-EL this permit is for TRIM OUT ONLY | $2,000 |
| 6935534-EL | 2022-11-28 | Electrical | 1120 8TH AVE | reconfigure electrical in kitchen, hallway and living room area per GC design existing circuits to be relocated per new supplied lay out | $8,500 |
| 6933110-EL | 2022-11-10 | Electrical | 5417 30TH AVE SW | remove old zinsco panel install new panel like for like | $2,500 |
| 6928789-EL | 2022-10-19 | Electrical | 6756 13TH AVE SW | remove old failing panel and install new panel like for like. | $1,800 |
| 6925953-EL | 2022-10-04 | Electrical | 4414B LINDEN AVE N | install nema 14-50 outlet for ev charger | $2,000 |
| 6925361-EL | 2022-09-29 | Electrical | 14045 PALATINE AVE N | install new 200 amp services on detached building and install power for hot tub and outlets in building | $6,000 |
| 6917020-EL | 2022-08-14 | Electrical | 11750 5TH AVE NE | rewire remaining knob and tube in home and install power and heaters in basement, replace old panel and install new 200 amp meter base with emergency disconnect | $15,000 |
| 6912713-EL | 2022-07-21 | Electrical | 5318 46TH AVE S | replace old broken meter base and mast | $1,500 |
| 6905461-EL | 2022-06-14 | Electrical | 1220 BOREN AVE | replace section 1 of existing meter pack stacks 11 stacks total 52 meter sockets on existing 1200 amp disconnect this is like for like swap from existing siemens equipment no added | $28,000 |
| 6903337-EL | 2022-06-02 | Electrical | 1120 8TH AVE | remodel kitchen and bathroom install new outlet locations and move lighting and switches per customer locations in unit 1402 | $6,000 |
| 6898818-EL | 2022-05-09 | Electrical | 11306 ALTON AVE NE | install outdoor panel and 200 amp meter base | $4,500 |
| 6895408-EL | 2022-04-20 | Electrical | 10242 32ND AVE SW | replace old FPE outdoor panel install new outdoor panel and add gas bond and inter system bond | $3,600 |
| 6891085-EL | 2022-03-29 | Electrical | 1122 18TH AVE E | replace outdoor panel and replace old panel with new outdoor panel install new 320 amp meter base | $5,000 |
| 6887217-EL | 2022-03-09 | Electrical | 1613 4TH AVE N | Replace old 200 amp panel with new panel with main breaker also install Tesla wall connector | $4,000 |
| 6885681-EL | 2022-03-02 | Electrical | 400 WALL ST | adding some outlets and lights for a gym remodel | $10,000 |
| 6866587-EL | 2021-11-01 | Electrical | 541 N 67TH ST | replace panel like for like | $4,000 |
| 6854380-EL | 2021-08-19 | Electrical | 3716 41ST AVE NE | install new 200 amp meter base with emergency disconect and new panel feeder from meter base | $3,200 |
| 6843605-EL | 2021-06-14 | Electrical | 9328 23RD AVE NW | install new 200 amp meter base and new 200 amp panel with tesla car charger | $4,000 |
| 6839964-EL | 2021-05-21 | Electrical | 2566 5TH AVE N | replace old knob and tube circuits for lights and certain outlets , also replace old panel with new 200 amp panel install new EF fan in bathroom new KA circuit in kitchen New SD | $11,000 |
| 6839961-EL | 2021-05-21 | Electrical | 10012 65TH AVE S | install new outdoor panel with Tesla Charger and outdoor outlet , refeed power to circuits in house fed via knob and tube 3 circuits | $18,500 |
| 6820996-EL | 2021-01-28 | Electrical | 3018 E OLIVE ST | install new 200 amp service and 200 amp panel update bonding and grounding to code | $4,500 |
| 6810875-EL | 2020-11-16 | Electrical | 1140 16TH AVE | add two outlets circuits from panel | $650 |
| 6801472-EL | 2020-09-18 | Electrical | 2410 WEST VIEWMONT WAY W | remove old panel and install new panel like for like add one circuit on side of home 20 amp 120 volt | $2,300 |
| 6768419-EL | 2020-01-24 | Electrical | 2445 NW 62ND ST | move a few wires to allow a window to be installed | $800 |
| 6760859-EL | 2019-12-02 | Electrical | 4201 SW JUNEAU ST | Replace old zinsco panels in Church at 3 locations. panels are sized like for like . EC to also install hardwired circuits in kitchen area and for additional outlet locations. new | $20,000 |
| 6750459-EL | 2019-09-26 | Electrical | 708 S DIRECTOR ST | upgrade panel and meter base to 200 amp service panel will be installed outside below meter base service is overhead | $3,600 |
| 6745696-EL | 2019-08-29 | Electrical | 2219 EASTLAKE AVE E | remove old zinsco panel and install new Like for like | $1,800 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →