COMPANY RECORD · SEATTLE, WA

Circuit Electric LLC — permit history in Seattle, WA

Circuit Electric LLC appears on 138 Seattle permit records from 2016 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical138100%

Activity by year

YearPermits issued
20162
20173
201811
20195
202011
20216
20226
202323
202431
202524
202616

Busiest year on record: 2024, with 31 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
3829 45TH AVE SW2026-07-13
13737A 23RD AVE NE2026-07-06
13737B 23RD AVE NE2026-07-06
13739 23RD AVE NE2026-07-06
111 N ARGYLE PL2026-06-30
526 N 65TH ST2026-06-22
2211 FEDERAL AVE E2026-05-15
116 N 55TH ST2026-05-06
2208 SW THISTLE ST2026-04-05
1915 NW 65TH ST2026-03-30
2447 5TH AVE W2026-02-25
7912 3RD AVE NW2026-02-20
1104 41ST AVE E2025-12-04
4436 BAKER AVE NW2025-12-02

115 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $40,000, median $4,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

138 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7152542-EL2026-07-13Electrical3829 45TH AVE SWKnob and Tube Rewire. Three circuits are being rewired/ added to the home.
7151351-EL2026-07-06Electrical13737A 23RD AVE NENew Service and Wiring[7/20/2026 JBC Added UFER Test to Permit]
7151353-EL2026-07-06Electrical13737B 23RD AVE NENew Service and Wiring[7/20/2026 JBC Added UFER Test to Permit]
7151348-EL2026-07-06Electrical13739 23RD AVE NENew Service / Wiring[7/20/2026 JBC Added UFER Test to Permit]
7150811-EL2026-06-30Electrical111 N ARGYLE PLService is Being Replaced on this building. New Strike is going to be on the back building 116 n 55th St.
7149289-EL2026-06-22Electrical526 N 65TH STPartial Upstairs Knob and Tube Rewire: (Three Circuits Added) 2 lighting, and one kitchen/ dining recep circuit Living Room: -2 sconces, 3 switches, all outlets Dining Room: -
7143400-EL2026-05-15Electrical2211 FEDERAL AVE EInstall of a 50amp circuit for an EV Charger.
7141932-EL2026-05-06Electrical13739 23RD AVE NEWe are doing 3 SFRs on this property this permit is for the underground electrical conduit work for all three units.
7141926-EL2026-05-06Electrical116 N 55TH STWe already pulled one permit for this and closed it. The temp pole has to change location on the property and SCL needs it reinspected.
7140801-EL2026-04-29Electrical116 N 55TH STNew SFR Wiring. (confirm address- this new structure is east of 108 N 55th) GOITJ 5-4-2026
7136864-EL2026-04-05Electrical2208 SW THISTLE STReplace and move the existing service. Install a new 125amp service and feeder. Electrical panel remained as existing.
7135804-EL2026-03-30Electrical1915 NW 65TH STNew wiring of a new basement unit. All new wiring, lighting, panel etc.
7133914-EL2026-03-18Electrical116 N 55TH STAddition of a temp power pole at the north end of the property.
7132227-EL2026-03-13Electrical1915 NW 65TH STReplacing the existing service in the laundry/common area and moving to the exterior of the building as shown in the plan set. Also converting the exiting car port into a new build$17,000
7131047-EL2026-02-25Electrical2447 5TH AVE WA/C Circuit Install. We tapped into an existing circuit that was previously installed and just wired up the new unit.
7130328-EL2026-02-20Electrical7912 3RD AVE NWBathroom and Laundry Room Remodel. Addition and modification of 3 circuits under 30 amps.
7119619-EL2025-12-04Electrical1104 41ST AVE EUFER TEST + PERMIT$100
7119289-EL2025-12-02Electrical4436 BAKER AVE NWHouse house wiring + 125amp feeder$20,000
7115962-EL2025-11-10Electrical951 N 45TH STNew rough in wiring of the new basement Unit 11.$8,000
7114387-EL2025-10-30Electrical1315 SW TRENTON STBathroom Addition and Adding Recessed lighting in the living room and bedroom.$3,500
7114025-EL2025-10-28Electrical4742 W ROBERTS WAY30amp heatpump circuit$1,300
7112922-EL2025-10-21Electrical951 N 45TH STLaundry/ Common Area Permit. Moving Laundry Circuits, adding lights and exhaust fan in the laundry/ common area.$2,000
7110430-EL2025-10-06Electrical2144 7TH AVE WKitchen Remodel adding receptacles. Bathroom Remodel.$6,500
7105222-EL2025-09-05Electrical6507 1ST AVE NWBathroom Remodel$3,000
7105200-EL2025-09-05Electrical9235 EVANSTON AVE NKitchen Remodel, and addition of recessed lighting in the living room, and light boxes in the bedrooms.$6,000
7101826-EL2025-08-15Electrical314 N 117TH STReplace the existing service . Electrical panel is remaining original.$3,000
7095469-EL2025-07-10Electrical316 N 117TH STNew DADU Wiring and Service.$12,500
7091356-EL2025-06-16Electrical1801 12TH AVE SFull House Knob and Tube Rewire, and new electrical pane.$15,000
7090226-EL2025-06-09Electrical193 34TH AVE EUFER TEST$100
7088492-EL2025-05-29Electrical193 34TH AVE EFull house rewire.$40,000
7080725-EL2025-04-15Electrical5514 25TH AVE NEPermit for Overhead Temp Power Pole Installation$500
7079086-EL2025-04-04Electrical2302 N 120TH STN120th St Remodel Project$15,000
7079092-EL2025-04-04Electrical12582 RIVIERA PL NEFull House Remodel$25,000
7076884-EL2025-03-23Electrical5117 46TH AVE SWiring of a Remodeled Detached Heated Storage$3,500
7075461-EL2025-03-14Electrical9047 PHINNEY AVE NLaundry Room and Bathroom Remodel. [5/21/2025 PGF Added (3) 15-25A dedicated appliance circuits to permit for kitchen work.]$2,500
7066177-EL2025-01-20Electrical5615 43RD AVE NEUFER TEST$100
7066178-EL2025-01-20Electrical5613 43RD AVE NEUFER TEST$100
7066183-EL2025-01-20Electrical4055 NE 57TH STService Replacement$1,500
7065079-EL2025-01-14Electrical5613 43RD AVE NEDADU New Construction Wiring$14,000
7065082-EL2025-01-14Electrical5615 43RD AVE NEADU New Construction Wiring$14,000
7062604-EL2024-12-27Electrical101 N 51ST STFull House Wiring + Service/ Panel$25,000
7062480-EL2024-12-25Electrical5012 1ST AVE NWUFER TEST for 5012 DADU$100
7060621-EL2024-12-11Electrical9810 8TH AVE NEUfer Test for the 9810 8th Ave ADU.$100
7060620-EL2024-12-11Electrical9808 8TH AVE NEUfer Test for 9808 DADU$100
7060618-EL2024-12-11Electrical9812 8TH AVE NEUfer Test for the 9812 8th Ave NE SFR$100
7059500-EL2024-12-05Electrical8902 17TH AVE NEReplacing Service/ Panel$4,000
7058259-EL2024-11-26Electrical5012 1ST AVE NWDADU New Construction Wiring$11,000
7056865-EL2024-11-18Electrical9812 8TH AVE NENew Construction Wiring$25,000
7056868-EL2024-11-18Electrical9808 8TH AVE NEDADU New Construction Wiring$15,000
7056874-EL2024-11-18Electrical9810 8TH AVE NEADU New Construction Wiring$15,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →