COMPANY RECORD · SEATTLE, WA
Bridge Electric Inc — permit history in Seattle, WA
Bridge Electric Inc appears on 696 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 696 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 28 |
| 2016 | 22 |
| 2017 | 68 |
| 2018 | 61 |
| 2019 | 62 |
| 2020 | 69 |
| 2021 | 74 |
| 2022 | 63 |
| 2023 | 54 |
| 2024 | 90 |
| 2025 | 71 |
| 2026 | 34 |
Busiest year on record: 2024, with 90 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 401 EASTLAKE AVE E | 2026-08-27 |
| 3513 SW 97TH ST | 2026-08-19 |
| 10026 34TH AVE SW | 2026-08-19 |
| 902 18TH AVE | 2026-08-12 |
| 1220 NW 121ST ST | 2026-07-28 |
| 1216 NW 121ST ST | 2026-07-28 |
| 1218 NW 121ST ST | 2026-07-28 |
| 1226B NW 121ST ST | 2026-07-28 |
| 1228 NW 121ST ST | 2026-07-28 |
| 1230 NW 121ST ST | 2026-07-28 |
| 1226 NW 121ST ST | 2026-07-28 |
| 110 NE 44TH ST | 2026-06-25 |
| 112 NE 44TH ST | 2026-06-25 |
| 1127 27TH AVE | 2026-06-15 |
391 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $325,000, median $2,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
696 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7160187-EL | 2026-08-27 | Electrical | 401 EASTLAKE AVE E | Underground Conduits for new Townhome Structure. | |
| 7158945-EL | 2026-08-19 | Electrical | 3513 SW 97TH ST | Updated electrical for remodel of a 2-bedroom home with a new electrical panel utilizing existing service. | |
| 7158846-EL | 2026-08-19 | Electrical | 10026 34TH AVE SW | Adding new Bathroom in Garage | |
| 7156770-EL | 2026-08-12 | Electrical | 902 18TH AVE | CONSTRUCT SIX (6) NEW ROWHOUSES WITH SURFACE PARKING [8/12/26 BGO - Approved Plan Set for (6) Row Houses] | $95,000 |
| 7156701-EL | 2026-08-05 | Electrical | 902 18TH AVE | Underground Conduits for new Townhomes | |
| 7155360-EL | 2026-07-28 | Electrical | 1220 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE CN PERMIT - #7043243 CN | |
| 7155353-EL | 2026-07-28 | Electrical | 1216 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE CN PERMIT - #7110991 CN | |
| 7155344-EL | 2026-07-28 | Electrical | 1218 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE CN PERMIT - #7110994 CN | |
| 7155340-EL | 2026-07-28 | Electrical | 1226B NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE CN PERMIT - #7060717 CN | |
| 7155337-EL | 2026-07-28 | Electrical | 1228 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE CN PERMIT - #7066999 CN | |
| 7155329-EL | 2026-07-28 | Electrical | 1230 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE | |
| 7155280-EL | 2026-07-28 | Electrical | 1226 NW 121ST ST | NEW CONSTRUCTION OF A SINGLE FAMILY RESIDENCE | |
| 7154636-EL | 2026-07-23 | Electrical | 902 18TH AVE | Temporary Construction Power for new Townhome Structure | |
| 7152168-EL | 2026-07-09 | Electrical | 401 EASTLAKE AVE E | Temporary Power for new Townhome Structure | |
| 7150135-EL | 2026-06-25 | Electrical | 110 NE 44TH ST | New Construction DADU | |
| 7150133-EL | 2026-06-25 | Electrical | 112 NE 44TH ST | New Construction SFR | |
| 7148085-EL | 2026-06-15 | Electrical | 1127 27TH AVE | RESIDENCE LIFTED ADU BASEMENT | |
| 7146061-EL | 2026-06-03 | Electrical | 1136A NW 57TH ST | Adding a 40A/240V EV Charger Circuit | |
| 7141563-EL | 2026-05-05 | Electrical | 1216 NW 121ST ST | Temp Power Pole for New Construction SFRs | |
| 7141562-EL | 2026-05-05 | Electrical | 1216 NW 121ST ST | Temp Power Pole for New Construction SFRs | |
| 7138009-EL | 2026-04-13 | Electrical | 4405 2ND AVE NE | New Construction SFR | |
| 7138011-EL | 2026-04-13 | Electrical | 4403 2ND AVE NE | New Construction DADU | |
| 7135903-EL | 2026-03-30 | Electrical | 808 LAKESIDE AVE S | Altering existing receptacle & lighting circuits to add Murphy Bed w/led accent lighting. Adding led tape & channel to office casework. Adding led tape & channel to Living Rm. case | |
| 7134472-EL | 2026-03-20 | Electrical | 4413 2ND AVE NE | New Construction SFR | |
| 7134470-EL | 2026-03-20 | Electrical | 4409 2ND AVE NE | New Construction DADU | |
| 7134473-EL | 2026-03-20 | Electrical | 4411 2ND AVE NE | New Construction DADU | |
| 7134471-EL | 2026-03-20 | Electrical | 4407 2ND AVE NE | New Construction SFR | |
| 7127669-EL | 2026-02-17 | Electrical | 4701 WALLINGFORD AVE N | NEW CONSTRUCTION OF (7) UNIT TOWNHOME STRUCTURE | $115,000 |
| 7125520-EL | 2026-02-04 | Electrical | 913 HIAWATHA PL S | NEW CONSTRUCTION OF 6 UNIT TOWNHOME BLDG. [2/4/26 BGO - Approved Plan Set] | $130,000 |
| 7125567-EL | 2026-01-19 | Electrical | 4701 WALLINGFORD AVE N | UG Feeder Conduits | |
| 7124753-EL | 2026-01-13 | Electrical | 3431 9TH AVE W | ||
| 7124752-EL | 2026-01-13 | Electrical | 3427 9TH AVE W | 125A Temporary Power Pole for New Construction Townhomes | |
| 7124754-EL | 2026-01-13 | Electrical | 3435 9TH AVE W | ||
| 7123607-EL | 2026-01-05 | Electrical | 7345 DELRIDGE WAY SW | ||
| 7122450-EL | 2025-12-23 | Electrical | 4701 WALLINGFORD AVE N | Ufer for new Construction Townhomes | $250 |
| 7119184-EL | 2025-12-09 | Electrical | 4417 2ND AVE NE | New construction of - SFR (4417) - AADU1 (4415A) - AADU2 (4415B) [12/9/25 KEF - Plan set approved.] | $55,000 |
| 7119037-EL | 2025-12-08 | Electrical | 4421 2ND AVE NE | New construction of SFR (4421) - AADU1 (4419A) - AADU2 (4419B) Construction Permit #7001531-CN [12/8/25 KEF - Plan set approved.] | $55,000 |
| 7118726-EL | 2025-11-26 | Electrical | 1127 27TH AVE | Ufer for SFR | $250 |
| 7118743-EL | 2025-11-26 | Electrical | 4421 2ND AVE NE | 2" PVC UNDERGROUND CONDUIT | $1,000 |
| 7118744-EL | 2025-11-26 | Electrical | 4417 2ND AVE NE | 2" PVC CONDUITS | $1,000 |
| 7118007-EL | 2025-11-21 | Electrical | 102 NE 44TH ST | NEW CONSTRUCTINO OF SFR & DADU ON SINGLE PARCEL, WITH 2 CONSTRUCTION PERMITS: DADU (104) - 7000519-CN SFR (102) - 7000358-CN | $15,000 |
| 7118008-EL | 2025-11-21 | Electrical | 104 NE 44TH ST | NEW CONSTRUCTINO OF SFR & DADU ON SINGLE PARCEL, WITH 2 CONSTRUCTION PERMITS: DADU (104) - 7000519-CN SFR (102) - 7000358-CN | $10,000 |
| 7116031-EL | 2025-11-10 | Electrical | 1722 N 47TH ST | Temporary Power Pole for New Construction Townhomes | $1,500 |
| 7115602-EL | 2025-11-06 | Electrical | 4411 1ST AVE NE | New Construction of a Single-Family Residence | $15,000 |
| 7112341-EL | 2025-10-17 | Electrical | 4413 2ND AVE NE | Temporary Power Pole for new Construction Residences | $1,500 |
| 7112337-EL | 2025-10-17 | Electrical | 6532 37TH AVE SW | SINGLE FAMILY RESIDENCE 2ND STORY ADDITION | $26,000 |
| 7112340-EL | 2025-10-17 | Electrical | 4407 2ND AVE NE | Temporary Power Pole for new Construction Residences. 10/17/2025 Address change from 4007 2nd Ave NE | $1,500 |
| 7112119-EL | 2025-10-16 | Electrical | 4404 1ST AVE NE | NEW CONSTRUCTION OF SFR & DADU ON SINGLE PARCEL, WITH 2 CONSTURCTION PERMITS DADU (4406) - 7028398-CN SFR (4404) - 7000348-CN | $25,000 |
| 7112120-EL | 2025-10-16 | Electrical | 4406 1ST AVE NE | NEW CONSTRUCTION OF SFR & DADU ON SINGLE PARCEL, WITH 2 CONSTURCTION PERMITS DADU (4406) - 7028398-CN SFR (4404) - 7000348-CN | $20,000 |
| 7110584-EL | 2025-10-15 | Electrical | 1531 19TH AVE | CONSTRUCT NINE (9) NEW ROWHOUSES WITH SURFACE PARKING TO THE REAR OF THE BUILDING. HOUSE SERVICE FOR STORM PUMP. | $165,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
