COMPANY RECORD · SEATTLE, WA
Brady Electric — permit history in Seattle, WA
Brady Electric appears on 48 Seattle permit records from 2018 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 48 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2018 | 1 |
| 2019 | 9 |
| 2020 | 3 |
| 2021 | 7 |
| 2022 | 5 |
| 2023 | 5 |
| 2024 | 9 |
| 2025 | 7 |
| 2026 | 2 |
Busiest year on record: 2019, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5428 BARNES AVE NW | 2026-08-07 |
| 9351 CALIFORNIA DR SW | 2026-03-15 |
| 5041 35TH AVE SW | 2025-12-22 |
| 8334 RAINIER AVE S | 2025-11-05 |
| 705 E REPUBLICAN ST | 2025-10-06 |
| 3717 BEACH DR SW | 2025-06-09 |
| 7898 24TH AVE SW | 2025-05-12 |
| 4021 23RD AVE SW | 2025-02-10 |
| 3820 NE 89TH ST | 2025-01-19 |
| 837 NE 56TH ST | 2024-12-19 |
| 1039 NE 104TH ST | 2024-12-04 |
| 4710 SW WILDWOOD PL | 2024-09-05 |
| 6413 MARSHALL AVE SW | 2024-07-03 |
| 1301 HARBOR AVE SW | 2024-06-10 |
40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,000,000,000,000, median $2,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
48 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7157227-EL | 2026-08-07 | Electrical | 5428 BARNES AVE NW | Adding (5) 20 amp circuits to existing tenant improvement project completed by others. Brady electric to show up and review the existing wiring, receptacles, light switches and ma | |
| 7133484-EL | 2026-03-15 | Electrical | 9351 CALIFORNIA DR SW | Tie into 15 amp existing circuit (that was not on the kitchen appliance circuit) receptacle. Existing single gang box removed. New metal clad cable 12 to wiring installed for rece | |
| 7122258-EL | 2025-12-22 | Electrical | 5041 35TH AVE SW | Service mast repair. Customer was concerned about water entering panel. Existing panel was kept in place. New wiring was installed from service drop to line side and from load side | $5 |
| 7115342-EL | 2025-11-05 | Electrical | 8334 RAINIER AVE S | Suite 102. Install (4) amp circuits for appliances (refrigerator, freezer, meat slicer, meat saw, meat fridge) | $3 |
| 7110433-EL | 2025-10-06 | Electrical | 705 E REPUBLICAN ST | Replace existing 125 amp panel with new. No new circuits added. | $0 |
| 7090230-EL | 2025-06-09 | Electrical | 3717 BEACH DR SW | Pool room Circuits demoed months ago to facilitate install of structural repairs, (re) install; - Existing 100 amp 120/208 phase heater circuit - New 125 amp rated panel fed from | $1 |
| 7085230-EL | 2025-05-12 | Electrical | 7898 24TH AVE SW | Install wiring for (4) art sculptures. Utilize existing raceway installed by Ashford Electric. Install 8x8 pvc junction boxes within hand holes to house LED driver, 120v wiring a | $3 |
| 7069606-EL | 2025-02-10 | Electrical | 4021 23RD AVE SW | Install ChargePoint hardwired car charger. Install new 50 amp Eaton BR breaker. Utilize existing conduit and wiring from old HVAC. | $0 |
| 7065997-EL | 2025-01-19 | Electrical | 3820 NE 89TH ST | -Install subpanel Ecoflow Smart Home Panel 2. Re-feed 15 amp and 20 amp 120 V loads from existing 200 amp Siemens panel to newsubpanel. -Install 20 amp gfi breaker for 250 volt 20 | $1 |
| 7062004-EL | 2024-12-19 | Electrical | 837 NE 56TH ST | Emergency meter repair. I was contacted after Homeowner had Seattle City Light come out and was given a photo of the meter which was an old circle AW with one of the load side lug | $0 |
| 7059412-EL | 2024-12-04 | Electrical | 1039 NE 104TH ST | EV Charger | $1 |
| 7058666-EL | 2024-11-28 | Electrical | 1039 NE 104TH ST | 200 A panel replacement [12/18/2024 PGF Changed address from 1309 NE 104th St. to 1039 NE 104th St. Address change fee applied.] | $1 |
| 7044284-EL | 2024-09-05 | Electrical | 4710 SW WILDWOOD PL | Small bathroom addition. Two dual function 20 amp circuits. -Small water heater (12.5 amps) -Toilet, GFCI, Lts, Fan 2 switches, 2 lights, 4 receptacles. | $2,000 |
| 7034215-EL | 2024-07-06 | Electrical | 705 E REPUBLICAN ST | Panel upgrade. 125 amp 24 space panel. [C.Kenefick 7/15/24 - fee for 125a feeder added to permit.] | $1,000,000,000,000 |
| 7033888-EL | 2024-07-03 | Electrical | 6413 MARSHALL AVE SW | Ev charger install. 50 amp (max per manufacturer) breaker. 6/2 romex, bell box, 8 AWG THHN, 1/2" emt, R.T. fittings, blah blah blah. ? ???? | $1,000,000,000 |
| 7029801-EL | 2024-06-10 | Electrical | 1301 HARBOR AVE SW | LED upgrade to existing fluorescent 8 foot fixtures. Scope of work included removing the ballast and installing new tombstones, wiring and LED 120 V lamps. Total fixtures of 44, wh | $0 |
| 7029574-EL | 2024-06-08 | Electrical | 3450 38TH AVE SW | 200 amp service upgrade from existing 125 amp. -New 200 amp rated surface mounted emergency disconnect -New 200 app main breaker panel. -New 1 1/2" RMC feeder -(2) new ground | $0 |
| 7012871-EL | 2024-03-05 | Electrical | 705 E REPUBLICAN ST | Panel change | $5 |
| 6996135-EL | 2023-11-13 | Electrical | 416 BROADWAY E | Addition/Extension of existing adjacent restaurant. Wall will be removed. Scope of work: Demo MC cable. Install 8 chandeliers to match existing layout. Install boxes, conduit and | $2,000 |
| 6981832-EL | 2023-08-19 | Electrical | 705 E REPUBLICAN ST | Panel change | $4,000 |
| 6974321-EL | 2023-07-08 | Electrical | 1301 HARBOR AVE SW | Replace lighting fixtures with LED Replace exit signs | $15,000 |
| 6969196-EL | 2023-06-07 | Electrical | 7716 30TH AVE SW | Mast repair; Raising mast higher so wires comply with NEC clearances. Install car charger with lockout at panel. ***Per discussion with supervisor Jeff Krieg no emergency discon | $4,000 |
| 6965456-EL | 2023-05-18 | Electrical | 3733 34TH AVE SW | Add 100 amp subpanel | $2,000 |
| 6932188-EL | 2022-11-04 | Electrical | 6109 SW HINDS ST | Wiring for mini split 30 amp disconnect 50 amp disconnect | $5,000 |
| 6918496-EL | 2022-08-22 | Electrical | 5706 SW ADMIRAL WAY | Service and panel upgrade to 200 amp | $9,000 |
| 6915689-EL | 2022-08-07 | Electrical | 2425 33RD AVE W | Install 12 x 12 J-Box above panel. Install (2) 60 amp rated four pole normally closed contactors Install half-inch EMT and wiring for connection to normally open contacts in Ansu | $3,000 |
| 6915280-EL | 2022-08-04 | Electrical | 316 N 36TH ST | ** please confirm all inspections requests are from Michael Brady with Brady Electric. 206-218-3724 before inspecting... per Brady Electric for Sign circuit | $1,000 |
| 6905686-EL | 2022-06-14 | Electrical | 6021 41ST AVE SW | Shop remodel Adding receptacles for shop, bathroom, panel upgrade, 16kw water heater, mini split.[7/3/2023 JBC Added 100amp Feeder Panel Fee to Permit, all other fees ok, No EV | $3,500 |
| 6862115-EL | 2021-10-05 | Electrical | 6030 41ST AVE SW | Top floor re wire. Customer cleared insulation and wanted upgraded wiring. No new outlets or receptacles. 6 new circuits ( 20 amp-Kitchen appliance 1, kitchen appliance 2, recepta | $15,000 |
| 6856231-EL | 2021-08-30 | Electrical | 3902 SW CHARLESTOWN ST | 40 amp hot tub install. Gfci 40 amp breaker, 3/4 EMT, FLEX, PVC to 60 amp rated disconnect. | $2,500 |
| 6852035-EL | 2021-08-05 | Electrical | 3272 37TH AVE SW | Add 2 outlet boxes, one for switch, one for another above pool table that switch controls. | $1,000 |
| 6840780-EL | 2021-05-27 | Electrical | 426 S MASSACHUSETTS ST | Dog food processing plant 5 appliances: 1) Butcher Boy Meat Flaker: 208 3phase 50 amp twist lock 10AWG, 20 amp for controls 2) (Future not onsite) Butcher Boy 250 Mixer Blen | $20,000 |
| 6838804-EL | 2021-05-15 | Electrical | 3017 SW HINDS ST | 8 can lights 2 3way switches 4 receptacles | $2,500 |
| 6837082-EL | 2021-05-06 | Electrical | 4457 38TH AVE SW | 50 amp sub panel | $2,300 |
| 6817125-EL | 2021-01-03 | Electrical | 2418 E UNION ST | Demo Existing 100 amp panel for 2418 E Union St. Unit B Add 200 amp meter and panel for 2418 E Union St. Unit B Connect Existing branch circuit wiring from old panel to new. | $8,000 |
| 6805202-EL | 2020-10-13 | Electrical | 6302 NE4thAVE | 50 amp circuit for sauna 20 amp circuit for 120v receptacle | $2,000 |
| 6774992-EL | 2020-03-04 | Electrical | 300 ELLIOTT AVE W | 4 basefeeds/altered circuits. 14 receptacles. level 2 | $500 |
| 6771205-EL | 2020-02-11 | Electrical | 7930 10TH AVE SW | Basement remodel | $3,000 |
| 6763614-EL | 2019-12-18 | Electrical | 11246 PHINNEY AVE N | Panel cleanup and NEC code update, securing wiring, etc. | $500 |
| 6759909-EL | 2019-11-22 | Electrical | 1306 33RD AVE S | Two story remodel. | $15,000 |
| 6757156-EL | 2019-11-06 | Electrical | 2211 ElliotAVE | Snapping together base feeds for modular office furniture | $1,500 |
| 6742520-EL | 2019-08-09 | Electrical | 300 ELLIOTT AVE W | 12 Furniture Connections | $1,000 |
| 6732830-EL | 2019-06-13 | Electrical | 1619 N 51ST ST | 225 meter 150 amp meter | $3,000 |
| 6719774-EL | 2019-03-29 | Electrical | 1721 8TH AVE N | Adding 50 sub panel for office furniture circuits. | $2,500 |
| 6715653-EL | 2019-03-05 | Electrical | 1721 8TH AVE N | Installing 22 circuits for office furniture | $19,000 |
| 6706341-EL | 2019-01-04 | Electrical | 5050 1ST AVE S | Snapping prefabricated receptacles into modular furniture | $1,200 |
| 6705902-EL | 2019-01-01 | Electrical | 1619 N 51ST ST | Two Story New Construction ** 7/5/19 No further inspections requested by Elec. Contractor Michael Brady (206) 218-3724 | $0 |
| 6689327-EL | 2018-09-19 | Electrical | 1619 N 51ST ST | Install Temporary Power Pole | $800 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →