COMPANY RECORD · SEATTLE, WA
Bosch Electric Inc — permit history in Seattle, WA
Bosch Electric Inc appears on 59 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 59 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 9 |
| 2016 | 7 |
| 2017 | 4 |
| 2018 | 12 |
| 2019 | 1 |
| 2021 | 2 |
| 2022 | 7 |
| 2023 | 9 |
| 2024 | 2 |
| 2025 | 5 |
| 2026 | 1 |
Busiest year on record: 2018, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1314 E UNION ST | 2026-01-05 |
| 118 N 35TH ST | 2025-06-30 |
| 1111 38TH AVE | 2025-06-18 |
| 8107 8TH AVE S | 2025-06-13 |
| 8709 15TH AVE NW | 2025-02-11 |
| 8713 15TH AVE NW | 2025-02-11 |
| 7204 FREMONT AVE N | 2024-03-12 |
| 906 NW 87TH ST | 2024-02-05 |
| 8715 15TH AVE NW | 2023-12-14 |
| 8711 15TH AVE NW | 2023-12-14 |
| 7008 9TH AVE NW | 2023-09-18 |
| 7738 DIBBLE AVE NW | 2023-07-10 |
| 7740 DIBBLE AVE NW | 2023-02-20 |
| 6821 25TH AVE NE | 2022-09-13 |
32 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $67,000, median $6,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
59 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7123506-EL | 2026-01-05 | Electrical | 1314 E UNION ST | ||
| 7093808-EL | 2025-06-30 | Electrical | 118 N 35TH ST | Install heat pump circuit | $2,000 |
| 7091804-EL | 2025-06-18 | Electrical | 1111 38TH AVE | Overhead service swap | $20,000 |
| 7091138-EL | 2025-06-13 | Electrical | 8107 8TH AVE S | heat pump circuit installation | $1,000 |
| 7066852-EL | 2025-02-11 | Electrical | 8709 15TH AVE NW | Installing 600 amp overhead strike transitioning underground to back of building where service is to be located [Construct new East live work building, occupy per plan. (Establish | $30,000 |
| 7066854-EL | 2025-02-11 | Electrical | 8713 15TH AVE NW | underground service jbox on north side of building with feeders to back where main service is located [ Construct new East live work building, occupy per plan. (Establish use as to | $30,000 |
| 7013935-EL | 2024-03-12 | Electrical | 7204 FREMONT AVE N | 950 SF remodel due to water damage | $15,000 |
| 7008009-EL | 2024-02-05 | Electrical | 906 NW 87TH ST | panel swap and 40 amp heat pump circuit | $6,000 |
| 7000721-EL | 2023-12-14 | Electrical | 8715 15TH AVE NW | Duplex [ 2-11-25 BZ See Plan Review Permit 7066854-EL ] 12/4/2025 jnl renewal | $63,000 |
| 7000719-EL | 2023-12-14 | Electrical | 8711 15TH AVE NW | Duplex [ 2-11-25 BZ see Plan Review Permit 7066852-EL ] 12/4/2025 jnl renewal | $63,000 |
| 7000684-EL | 2023-12-14 | Electrical | 8709 15TH AVE NW | Duplex [ 2-11-25 BZ See Plan Review Permit 7066852-EL] 12/4/2025 jnl renewal | $67,000 |
| 7000711-EL | 2023-12-14 | Electrical | 8713 15TH AVE NW | Duplex [ 2-11-25 BZ See Plan Review Permit 7066854-EL ]. 12/4/2025 jnl renewal | $67,000 |
| 6992234-EL | 2023-10-20 | Electrical | 8713 15TH AVE NW | UFER | $2,000 |
| 6992233-EL | 2023-10-20 | Electrical | 8709 15TH AVE NW | UFER | $2,000 |
| 6986346-EL | 2023-09-18 | Electrical | 7008 9TH AVE NW | 20 amp 240V heat pump, 120V service outlet | $2,000 |
| 6974370-EL | 2023-07-10 | Electrical | 7738 DIBBLE AVE NW | 200 amp service change | $6,900 |
| 6949053-EL | 2023-02-20 | Electrical | 7740 DIBBLE AVE NW | Rough in and trim of ADU | $25,000 |
| 6930876-EL | 2022-10-31 | Electrical | 7740 DIBBLE AVE NW | UFER ground | $1,000 |
| 6922065-EL | 2022-09-13 | Electrical | 6821 25TH AVE NE | 1348 SFR wiring | $25,000 |
| 6922079-EL | 2022-09-13 | Electrical | 6823 25TH AVE NE | 1142 SFR | $25,000 |
| 6915970-EL | 2022-08-09 | Electrical | 8709 15TH AVE NW | overhead temporary power | $500 |
| 6895389-EL | 2022-04-20 | Electrical | 6823 25TH AVE NE | Ufer for New Construction SFR | $500 |
| 6895394-EL | 2022-04-20 | Electrical | 6821 25TH AVE NE | Ufer Ground for SFR | $500 |
| 6877068-EL | 2022-01-12 | Electrical | 6823 25TH AVE NE | overhead temporary power pole | $500 |
| 6848605-EL | 2021-07-16 | Electrical | 7412 1ST AVE NW | Floor heat circuit installation, 7/23/21 RN - added 2-EF, 8 - light fixtures, rewired 2nd floor bathroom receptacle circuit. 1st & 2nd floor bathrooms remodeled. 9/1/2021 add (1) 6 | $500 |
| 6820634-EL | 2021-01-26 | Electrical | 1610 N 47TH ST | Add/alter 4 kitchen circuits (2 appliance, 1 disposal, 1 dishwasher) | $6,000 |
| 6712643-EL | 2019-02-14 | Electrical | 9510 23RD AVE NW | Rough in and trim of SFR 3699 SF | $22,194 |
| 6704009-EL | 2018-12-14 | Electrical | 9510 23RD AVE NW | SFR 2800 sf | $19,000 |
| 6697831-EL | 2018-11-07 | Electrical | 9510 23RD AVE NW | UFER | $500 |
| 6692045-EL | 2018-10-04 | Electrical | 9510 23RD AVE NW | underground temporary power | $850 |
| 6684016-EL | 2018-08-16 | Electrical | 4107 NE 45TH ST | Feeder repair | $750 |
| 6649585-EL | 2018-03-13 | Electrical | 6702 14TH AVE NW | 30 DAY GET STARTED FOR BRANCH CIRCUITS ONLY, PLAN REVIEW PERMIT UNDER 6646540 | |
| 6649404-EL | 2018-03-08 | Electrical | 14368 EDGEWATER LN NE | SINGLE FAMILY RESIDENCE REMODEL, PANEL CHANGE | |
| 6644662-EL | 2018-02-09 | Electrical | 6702 14TH AVE NW | [UFER GROUND. ] | |
| 6639774-EL | 2018-01-12 | Electrical | 531 S SULLIVAN ST | 1640 SF. 01/26/18 CEP; CONVERT TO PLAN REVIEW. SEE 6642039. | |
| 6639545-EL | 2018-01-11 | Electrical | 531 S SULLIVAN ST | 1354 SF. 01/26/18 CEP; CONVERT TO PLAN REVIEW. SEE 6642039. | |
| 6639548-EL | 2018-01-11 | Electrical | 531 S SULLIVAN ST | 1354 SF. 01/26/18 CEP; CONVERT TO PLAN REVIEW. SEE 6642039. | |
| 6639530-EL | 2018-01-11 | Electrical | 531 S SULLIVAN ST | 1354 SF. 01/26/18 CEP; CONVERT TO PLAN REVIEW. SEE 6642039. | |
| 6639379-EL | 2018-01-10 | Electrical | 531 S SULLIVAN ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6636099-EL | 2017-12-19 | Electrical | 531 S SULLIVAN ST | [UFER GROUND. ] TR 12/20/18 Ok to refund the renewal fee | |
| 6633810-EL | 2017-12-06 | Electrical | 6702 14TH AVE NW | [TEMPORARY POWER. ] | |
| 6633815-EL | 2017-12-06 | Electrical | 531 S SULLIVAN ST | [TEMPORARY POWER. ] | |
| 6579615-EL | 2017-02-03 | Electrical | 103 NW 103RD ST | ROUGH-IN AND TRIM, DUPLEX | |
| 6557358-EL | 2016-09-20 | Electrical | 103 NW 103RD ST | [UFER GROUND. ] | |
| 6557509-EL | 2016-09-20 | Electrical | 103 NW 103RD ST | [TEMPORARY POWER. ] OVERHEAD | |
| 6544764-EL | 2016-07-07 | Electrical | 4058 RAINIER AVE S | EXTEND 120V GATE CIRCUIT | |
| 6537147-EL | 2016-05-26 | Electrical | 10650 LAKESIDE AVE NE | 200 AMP PANEL CHANGE, HEAT PUMP CIRCUIT. 4/26/17 SK ADD (2) 20A CIRCUITS | |
| 6525891-EL | 2016-03-25 | Electrical | 104 N 84TH ST | WIRE SFR, NEW CONSTRUCTION | |
| 6516792-EL | 2016-02-02 | Electrical | 104 N 84TH ST | [UFER GROUND. ] | |
| 6512071-EL | 2016-01-05 | Electrical | 111 NW 103RD ST | 1900 SF SFR |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
