COMPANY RECORD · SEATTLE, WA
Aes Electrical Contractors LLC. — permit history in Seattle, WA
Aes Electrical Contractors LLC. appears on 176 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 176 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 5 |
| 2016 | 12 |
| 2017 | 12 |
| 2018 | 17 |
| 2019 | 21 |
| 2020 | 8 |
| 2021 | 17 |
| 2022 | 12 |
| 2023 | 32 |
| 2024 | 17 |
| 2025 | 16 |
| 2026 | 7 |
Busiest year on record: 2023, with 32 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2012 43RD AVE E | 2026-08-13 |
| 4117 20TH AVE SW | 2026-08-11 |
| 4501 WEST MARGINAL WAY SW | 2026-02-25 |
| 1512 10TH AVE W | 2026-02-09 |
| 3300 YORK RD S | 2026-01-13 |
| 4331 2ND AVE NW | 2025-12-15 |
| 512 NW 70TH ST | 2025-12-08 |
| 3822 41ST AVE S | 2025-11-25 |
| 4248 S ORCAS ST | 2025-11-18 |
| 10 SMITH ST | 2025-11-18 |
| 3431 44TH AVE SW | 2025-11-11 |
| 3803 SW 107TH ST | 2025-11-06 |
| 2617 27TH AVE W | 2025-11-03 |
| 3855 26TH AVE W | 2025-10-19 |
143 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $125,000, median $7,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
176 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7158106-EL | 2026-08-13 | Electrical | 2012 43RD AVE E | Rewire apartment 101 | |
| 7157660-EL | 2026-08-11 | Electrical | 4117 20TH AVE SW | Upgrading service from 100 amp to 200 amp | |
| 7155718-EL | 2026-07-29 | Electrical | 2012 43RD AVE E | Rewire unit 201 | |
| 7152538-EL | 2026-07-13 | Electrical | 2012 43RD AVE E | Rewire apartment approx 700 sq ft unit 108 | |
| 7131045-EL | 2026-02-25 | Electrical | 4501 WEST MARGINAL WAY SW | Added a 45KVA 240 Delta to 480 Wye 3 phase transformer to a new 100 amp 480V panel to feed a new paint booth | |
| 7128459-EL | 2026-02-09 | Electrical | 1512 10TH AVE W | Upgrading service from 200 amp to 320 amp. Keeping existing 200 amp panel in basement to feed basement circuits. Adding a 2nd 200 amp panel to feed the main floor of house and upst | |
| 7124739-EL | 2026-01-13 | Electrical | 3300 YORK RD S | ||
| 7121347-EL | 2025-12-15 | Electrical | 4331 2ND AVE NW | Upgrade service from 125 amp to 200 amp | $7,000 |
| 7120065-EL | 2025-12-08 | Electrical | 512 NW 70TH ST | New 200 amp service upgrading from 100 amp. | $7,000 |
| 7118569-EL | 2025-11-25 | Electrical | 3822 41ST AVE S | Upgrade service from 125 amp to 200 amp. Install new heat pump 40 amp circuit and service outlet. | $7,000 |
| 7117143-EL | 2025-11-18 | Electrical | 4248 S ORCAS ST | Upgrade from 125 to 200 amp service. | $7,000 |
| 7117144-EL | 2025-11-18 | Electrical | 10 SMITH ST | Upgrade service from 125 to 200 amp. Install one dedicated range circuit. Install one heat pump and service outlet. | $7,000 |
| 7116174-EL | 2025-11-11 | Electrical | 3431 44TH AVE SW | Upgrade service from 100 amp to 200 amp. Add 60 amp car charger circuit for Rivian EV. | $7,000 |
| 7115683-EL | 2025-11-06 | Electrical | 3803 SW 107TH ST | Basement rewire into ADU. Add 2nd meter for ADU | $20,000 |
| 7114783-EL | 2025-11-03 | Electrical | 2617 27TH AVE W | Upgrade service from 100 amp to 200 amp | $7,000 |
| 7112493-EL | 2025-10-19 | Electrical | 3855 26TH AVE W | Upgrade service from 100 amp to 200 amp | $7,500 |
| 7103118-EL | 2025-08-27 | Electrical | 2601 EASTLAKE AVE E | Replace Service Like for Like 11 meters and one house meter with main fused switch. [8/27/2025 BGO - Approved Plan Set with Comments] | $20,000 |
| 7102830-EL | 2025-08-21 | Electrical | 5900 36TH AVE SW | New 200 amp service replacing 125 amp service | $6,500 |
| 7101554-EL | 2025-08-13 | Electrical | 2333 NE 55TH ST | Swap out 5 panels with new ones. Three tenant panels, One house panel and One hot water tank | $7,500 |
| 7083878-EL | 2025-05-05 | Electrical | 651 S INDUSTRIAL WAY | Refeed 4 rooftop units with new disconnects | $10,000 |
| 7082499-EL | 2025-04-24 | Electrical | 6732 40TH AVE SW | Partial re-wire of house. | $15,000 |
| 7073388-EL | 2025-03-03 | Electrical | 1922 35TH AVE W | 1200 Sq ft basement rewire | $7,500 |
| 7065543-EL | 2025-01-16 | Electrical | 2120 31ST AVE W | 125 amp to 200 amp service upgrade | $7,000 |
| 7062222-EL | 2024-12-23 | Electrical | 8008 CALIFORNIA AVE SW | Upgrading service from 125 amp to 200 amp | $7,000 |
| 7056793-EL | 2024-11-17 | Electrical | 8520 26TH AVE NW | New 200 amp service and rewire top floor of house | $16,700 |
| 7048695-EL | 2024-10-01 | Electrical | 2511 NE 57TH ST | Upgrade service from 100 amp to 200 amp | $7,000 |
| 7047300-EL | 2024-09-23 | Electrical | 6055 48TH AVE SW | New 200 amp service replacing 100 amp service | $7,000 |
| 7039392-EL | 2024-08-06 | Electrical | 5017 26TH AVE S | 200 amp panel replacement. Like for Like | $3,900 |
| 7030590-EL | 2024-06-13 | Electrical | 3630 50TH AVE SW | 100 to 200 amp service upgrade. Adding one instant hot water circuit | $6,500 |
| 7027433-EL | 2024-05-28 | Electrical | 220 S FINDLAY ST | Install new thermostat wire for 2 existing rooftop HVAC units | $1,250 |
| 7024084-EL | 2024-05-08 | Electrical | 11407 CRESTWOOD DR S | New 200 amp service | $6,500 |
| 7021623-EL | 2024-04-24 | Electrical | 8418 SEWARD PARK AVE S | New Dedicated circuit for Bidet | $1,500 |
| 7020231-EL | 2024-04-16 | Electrical | 3515 NE 60TH ST | Upgrade service 100 amp to 200 amp | $6,500 |
| 7019010-EL | 2024-04-09 | Electrical | 2442 8TH AVE N | Partial rewire 3 units. Rewire Kitchen, add washer and dryer circuits. Add new kitchen lighting. | $15,000 |
| 7014132-EL | 2024-03-12 | Electrical | 2442 8TH AVE N | Partial rewire of unit. New Kitchen circuits and new washer/dryer circuit. | $6,500 |
| 7010956-EL | 2024-02-22 | Electrical | 5045 35TH AVE SW | Upgrading from 100 amp service to 200 amp | $6,500 |
| 7006305-EL | 2024-01-24 | Electrical | 2442 8TH AVE N | New panels and kitchen rewire and new washer and dryer circuit in each unit | $15,000 |
| 7004207-EL | 2024-01-10 | Electrical | 1147 21ST AVE E | Repair broken mast and meter base from the storm that came through. | $2,500 |
| 7001173-EL | 2024-01-09 | Electrical | 1 W NICKERSON ST | New standalone deli building on same property as a gas station. New service and feeders. | $30,000 |
| 7003156-EL | 2024-01-03 | Electrical | 2442 8TH AVE N | Partial rewire of apartment, replace panel, | $4,500 |
| 7000173-EL | 2023-12-12 | Electrical | 2442 8TH AVE N | New panels and partial rewire of 3 apartments. New Washer, Dryers, New Kitchen wiring | $15,000 |
| 6998314-EL | 2023-11-29 | Electrical | 8717 25TH AVE NW | Re-wire top floor of house. New service. | $18,000 |
| 6994965-EL | 2023-11-06 | Electrical | 2442 8TH AVE N | New panels and partial rewire of 3 apartments. New Washer, Dryers, New Kitchen wiring, New panels | $15,000 |
| 6993763-EL | 2023-10-30 | Electrical | 2116 8TH AVE W | 2 bathroom remodels | $4,500 |
| 6989364-EL | 2023-10-04 | Electrical | 7548 29TH AVE SW | Replace 200 amp panel like in kind | $3,500 |
| 6987909-EL | 2023-09-26 | Electrical | 3521 NE 92ND ST | Taking over project from another electrical contractor that was fired. Finish trim out and new 20 amp 120V circuit to refeed garage. | $5,000 |
| 6984384-EL | 2023-09-06 | Electrical | 2442 8TH AVE N | New panel and rewire kitchen and new washer/dryer circuit | $6,500 |
| 6984375-EL | 2023-09-06 | Electrical | 2442 8TH AVE N | New panel and rewire kitchen and new washer and dryer circuits | $6,500 |
| 6983590-EL | 2023-08-30 | Electrical | 4211 11TH AVE NE | New Service due to fire in fuse panel. Repair job | $6,500 |
| 6983592-EL | 2023-08-30 | Electrical | 4209 11TH AVE NE | Had to redo service because of fire in duplex. City light require us to update both services. | $3,500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
