COMPANY RECORD · SEATTLE, WA

Active Engineering — permit history in Seattle, WA

Active Engineering appears on 974 Seattle permit records from 2015 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical974100%

Activity by year

YearPermits issued
2015130
201689
2017166
201893
201997
202091
202179
202242
202348
202463
202550
202626

Busiest year on record: 2017, with 166 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1118 41ST AVE E2026-08-05
4411 23RD AVE W2026-08-04
5601 22ND AVE NW2026-08-03
403 ROY ST2026-07-16
620 TERRY AVE2026-07-09
1911 4TH AVE W2026-06-30
400 39TH AVE E2026-06-16
8608 26TH AVE NW2026-04-28
5036 25TH AVE NE2026-04-28
1212 39TH AVE E2026-04-27
1048 SUMMIT AVE E2026-04-15
901 NW 63RD ST2026-04-14
3141 E MADISON ST2026-04-14
7348 26TH AVE NW2026-04-01

592 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $5,741,000, median $2,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

974 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7156685-EL2026-08-05Electrical1118 41ST AVE E(1) 100amp 240v feeder single phase (2) 50amp dock circuits 240v (1) 20amp dock circuit 120v
7153198-EL2026-08-04Electrical4411 23RD AVE WProvide all electrical for a video, music, and recording studio.$241,560
7152289-EL2026-08-03Electrical5601 22ND AVE NWInstall of fire alarm for turning levels 2 and 3 TI spaces into 23 living units$45,000
7150686-EL2026-07-16Electrical403 ROY STReplace 400A 1-phase overhead service and utility meters. [7/16/26 KEF - Plan set approved.]$45,000
7152113-EL2026-07-09Electrical620 TERRY AVEChanging out the following: 28 lights 30 plugs 16 switches
7150794-EL2026-06-30Electrical1911 4TH AVE WKitchen and Bath Remodel Add (5) 120v 15-20amp circuits in kitchen and bathroom and for future. Add (1) 240v 20amp circuit for heater in kitchen. Add (1) 240v 50amp circuit fo
7123785-EL2026-06-24Electrical5601 22ND AVE NWOffice to apartment conversion. Not for the whole building, but only for two levels of existing office. The majority of the existing building is multi-family and remains as is. $616,000
7148328-EL2026-06-16Electrical400 39TH AVE E30amp 240v single phase dock feeder.
7140503-EL2026-04-28Electrical8608 26TH AVE NW1) 320amp service with (2) 200amp panels and (1) 100amp sub panel. All 120/240v single phase. (150) lights (2) 50amp hot tub (3) 50 amp car charger (2) 50amp range (2) 30amp drye
7140444-EL2026-04-28Electrical5036 25TH AVE NEExtend (18) existing 20amp circuits in units 406, 306, 309, 314, 328 and 343. The hotel is remodeling a handful of rooms.
7140256-EL2026-04-27Electrical1212 39TH AVE E- 22 switches - 26 lights 2 20 amp circuits for a hydro bath tub 1 15 amp circuit for a hydro bath tub 1 20 Amp circuit for bathroom counter top outlet Floor heat is an add
7138510-EL2026-04-15Electrical1048 SUMMIT AVE EIt is for a Single-Family Home Remodel Altering up to 5 circuits. 120v 15-20amp
7138322-EL2026-04-14Electrical901 NW 63RD STAll electrical for a new DADU plus Ufer
7138178-EL2026-04-14Electrical3141 E MADISON ST1- 200amp panel 120/240v single phase 75- light fixtures 3- exit lights 15- switches 20- receptacles 23- 1-pole 15-20amp circuits (this is for the plugs and lights etc.) 3- 2-pole
7136231-EL2026-04-01Electrical7348 26TH AVE NW(4) added 120v 15-20amp circuits and (5) switches and (4) plugs and (8) lights for a couple bathroom being remodeled
7134575-EL2026-03-23Electrical1521 NW 65TH STReplace (9) unit panels (100A, 240V, single phase feeders)
7131886-EL2026-03-04Electrical1206 16TH AVE EInstalling: 20- lighting fixtures 15- receptacles 8- switches 1- 70 amp feeder and subpanel
7130523-EL2026-02-23Electrical6027 PRINCETON AVE NEAdding the following: (6) new 15-20amp circuits 120v (25) lights (50) plugs (15) switches
7126161-EL2026-02-09Electrical201 NE 103RD STINSTALLATION OF NEW ADDRESSABLE FIRE ALARM COMPONENTS IN A FULLY OPERATIONAL EXISTING FIRE ALARM SYSTEM WITH VOICE EVACUATION IN A 7-STORY RESIDENTIAL MIXED USE BUILDING. THIS TEN$10,538
7124188-EL2026-02-03Electrical201 NE 103RD STProvide all electrical systems for an early learning center tenant improvement of 7,056 sf and 3000 sf exterior play area [1-28-26 D Rankin - Corrected address to comply with DV si$480,025
7127754-EL2026-02-03Electrical9226 ROOSEVELT WAY NEadd (1) 15-20amp dedicated 120v circuit
7126840-EL2026-01-28Electrical1212 39TH AVE EBasement
7126049-EL2026-01-22Electrical4422 54TH AVE SWAdding the following: 10 lights 10 plugs 4 20amp circuits 120/240v 30amp circuit 240v 40amp circuit 240v
7125852-EL2026-01-21Electrical5959 CORSON AVE SAdding the following: 6 20 amp, 120 volt dedicated circuit 10 Receptacles 6 Switches
7125710-EL2026-01-20Electrical3141 E MADISON ST
7124548-EL2026-01-12Electrical1744 DEXTER AVE N
7120586-EL2025-12-10Electrical14343 15TH AVE NEInstalling AES Radio$500
7119979-EL2025-12-05Electrical1715 E OLIVE WAYScope: (1) 40A, 208V, 1phase circuit for outdoor heat pump (1) 20A, 208V, 1 phase circuit for indoor heat pump (1) 20A, 120V circuit for ERV$2,200
7113562-EL2025-11-19Electrical715 2ND AVE WUpgrade Electrical Service and meters [3-10-26 D Rankin - Revision with Tap out of disconnect is not allowed, house has to be served from Terminal Can, which may require a larger t$40,000
7116574-EL2025-11-13Electrical700 W LEE STAdd (4) 20amp 120v circuits for a living room bar (dishwasher, appliance circuits, and microwave/speed oven)$3,000
7116257-EL2025-11-11Electrical2301 FAIRVIEW AVE ERemodel of unit 315$20,000
7114127-EL2025-10-29Electrical8608 26TH AVE NWInstall UFER Ground$100
7113399-EL2025-10-23Electrical710 BELMONT PL EReplace unit feeders in condo building, (26) 100A Feeders.$55,000
7112554-EL2025-10-20Electrical107 DORFFEL DR Eextending a circuit for new receptacle$500
7110450-EL2025-10-07Electrical3025 MAGNOLIA BLVD W(1) dedicated 30-amp circuit to heat pump$2,500
7110387-EL2025-10-06Electrical1661 HARBOR AVE SWInstall 1 new 40A 208V single phase EV Charger$3,000
7108850-EL2025-09-26Electrical3401 FREMONT AVE NExtend (6) existing 120-volt, 20 amp circuits$6,000
7108893-EL2025-09-26Electrical1212 39TH AVE EInstalling (34) light and (4) plugs and (15) switches$12,000
7108414-EL2025-09-24Electrical8619 JONES AVE NW(2) Bathrooms and & laundry room remodel: adding (8) new 15-20A circuits [10/10/2025 PGF Added (1) 30-50A dedicated appliance circuit and (1) 30-50A dedicated appliance circuit to $10,000
7108250-EL2025-09-23Electrical1231 5TH AVE NInstall new 40A 208V single phase EV Charger$2,500
7107776-EL2025-09-19Electrical5044 WILSON AVE STenant improvement for 2,640 SF wood working shop. All electrical except fire alarm.$32,000
7103763-EL2025-08-26Electrical2125 1ST AVEInstall five (5) new speakers to provide proper coverage.$2,000
7101154-EL2025-08-12Electrical8608 26TH AVE NWInstall a 200 amp overhead temp service.$1,000
7100701-EL2025-08-08Electrical104 12TH AVEadding Qty (2) Horn/Strobe devices$240
7098952-EL2025-08-07Electrical104 12TH AVE(1) 800A 3 phase feeder (3) 400A 3 phase feeders Lights and exhaust fans in (2) retail bathrooms Connections for a 6-ton heat pump system Lights, cameras, and card access in (2$56,000
7099327-EL2025-07-31Electrical8036 12TH AVE NWExtend (8) existing circuits and add new devices. [3.19.2026 PGF Voided all connection fees and added (8) 15-30A branch circuits and 100A feeder fee. Post-issuance change fee inclu$9,300
7099148-EL2025-07-30Electrical840 N 153RD PLAdd (2) circuits and devices [C.Kenefick 8/5/2025 - not within City of Seattle. Emailed customer.]$3,900
7098842-EL2025-07-29Electrical6033 5TH AVE NEAdd (5) new circuits and devices[11/13/2025 JBC Added Circuit to Permit for Floor Heat].$14,600
7098828-EL2025-07-29Electrical2733 33RD AVE SAdd (10) new circuits; 9/16/25 RN Basement not permitted as Legal ADU see building permit$20,000
7095052-EL2025-07-08Electrical1121 22ND AVE ERewire Kitchen and bathroom using existing circuits and add new lighting, switches, outlets and exhaust fan$20,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →