COMPANY RECORD · BELLEVUE, WA
16D LLC — permit history in Bellevue, WA
16D LLC appears on 68 Bellevue permit records from 2016 through 2026, most often electrical (98.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 67 | 98.5% |
| Mechanical / HVAC | 1 | 1.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 3 |
| 2017 | 1 |
| 2018 | 10 |
| 2019 | 13 |
| 2020 | 9 |
| 2021 | 12 |
| 2022 | 4 |
| 2023 | 7 |
| 2024 | 2 |
| 2025 | 6 |
| 2026 | 1 |
Busiest year on record: 2019, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Bellevue permit, not only this company's
This page is a snapshot of 16D LLC. The search behind it holds more than 131,466 Bellevue permits naming a contractor, since 2015: 61,207 electrical permits, 32,396 mechanical (HVAC) permits, 19,696 plumbing permits, 13,557 building permits, 4,610 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit 16D LLC files, or any new electrical permit in Bellevue. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 10000 Meydenbauer Way SE - Unit site | 2026-06-08 |
| 1220 116th Ave NE | 2025-07-31 |
| 3380 146th Pl SE | 2025-07-09 |
| 925 110th Ave NE | 2025-04-29 |
| 1515 116th Ave NE | 2025-04-22 |
| 10410 NE 2nd St | 2025-03-10 |
| 300 110th Ave NE - Unit site | 2024-05-20 |
| 16053 NE 8th St | 2023-12-22 |
| 1663 Killarney Way | 2023-11-13 |
| 13427 NE Spring Blvd | 2023-09-05 |
| 12700 NE 8th St - Bldg E | 2023-08-29 |
| 100 Bellevue Sq | 2022-12-02 |
| 3625 132nd Ave SE | 2022-03-22 |
| 1300 114th Ave SE | 2022-03-08 |
48 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Titan Electric Inc | 15 | 2016–2026 |
| Oeg Inc | 9 | 2016–2026 |
| Adt LLC | 9 | 2015–2025 |
| Cochran Inc | 5 | 2017–2025 |
| Macdonald-Miller Fac Solns LLC Mark Webster | 5 | 2016–2025 |
| Northwest Fire Systems LLC Clark III Potter | 5 | 2016–2025 |
| Guardian Security Systems Inc | 5 | 2016–2024 |
| Pacific Power Group LLC | 5 | 2016–2025 |
Companies that also appear in Bellevue permit records at addresses where 16D LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
68 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 26 113862 BF | 2026-06-08 | Electrical | 10000 Meydenbauer Way SE - Unit site | A Multifamily Residential Alteration to Existing Structure Electrical Project Involving (1 Pump, 1 Added or Altered Branch Circuits) | |
| 25 116677 BG | 2025-07-31 | Electrical | 1220 116th Ave NE | Replace elevator disconnect using existing feeders and upstream OCP. Relocate elevator utilization circuits to machine room panel. Upgrade mach room and pit lighting to LED. | |
| 25 116367 FA | 2025-07-14 | Electrical | 1220 116th Ave NE | For the purpose of elevator modernization: Install a dedicated function elevator control and supervision panel and landing and MR detection. No fire alarm or sprinklers existing. | |
| 25 111233 BG | 2025-07-09 | Electrical | 3380 146th Pl SE | REPLACE 100A ELEVATOR DISCONNECTS WITH 60A UNITS, USING THE EXISTING FEEDERS AND MAIN OCP. RELOCATE UTILIZATION CIRCUITS TO NEW MACH ROOM SUB PANEL. UPGRADE MACH ROOM AND PIT LIGHT | |
| 25 110309 BF | 2025-04-29 | Electrical | 925 110th Ave NE | A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 1-Feeder, 3-Light Fixtures, 2-Switches, 2-Receptacles, 6-Added or Altered Branch Circui | |
| 25 108806 BG | 2025-04-22 | Electrical | 1515 116th Ave NE | Replace elevator disconnect using existing feeders and upstream OCP. Elevator NOT on emergency power. - Relocate existing elevator utilization circuits (machine room lights, machi | |
| 25 106096 BF | 2025-03-10 | Electrical | 10410 NE 2nd St | A Multifamily Residential Repair or Replacement Project Installing {6-Elevator, 6-Feeder, 10-Added or Altered Branch Circuits} Upgrade elevator disconnects for modernization projec | |
| 24 107376 FA | 2024-05-20 | Electrical | 300 110th Ave NE - Unit site | For the purpose of elevator modernization: Install shunt power monitoring, shunt heat monitoring, pit heat and hat relay | |
| 24 106919 BF | 2024-04-17 | Electrical | 300 110th Ave NE - Unit site | A Nonresidential Repair or Replacement Project Installing {2-Elevator, 2-Feeder, 2-Light Fixtures, 2-Switches, 2-Receptacles, 6-Added or Altered Branch Circuits, 1-Subpanel} Replac | |
| 23 124103 FA | 2023-12-22 | Electrical | 16053 NE 8th St | For the purpose of elevator modernization: Add machine room smoke and relays for recall and hat light. 4 devcies | |
| 23 118409 FA | 2023-11-13 | Electrical | 1663 Killarney Way | For the purpose of elevator modernization: Install elevator landing detection, elevator machine room detection and sprinkled pit detection. Add relays for recall and hat light. Add | |
| 23 124025 BF | 2023-10-26 | Electrical | 16053 NE 8th St | A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 2-Light Fixtures, 2-Switches, 2-Receptacles, 7-Added or Altered Branch Circuits, 1-Subp | |
| 23 110189 FA | 2023-09-05 | Electrical | 13427 NE Spring Blvd | For the purpose of elevator modernization: Add pit detection, hat relay and shunt power monitoring | |
| 23 105972 FA | 2023-08-29 | Electrical | 12700 NE 8th St - Bldg E | For the purpose of elevator modernization, replace the fire alarm panel and all associated initiating devices. Remove existing notification appliances and install new notification | |
| 23 117228 BF | 2023-08-04 | Electrical | 1663 Killarney Way | A Nonresidential Repair or Replacement Project Installing {1-Elevator, 1-Feeder, 2-Light Fixtures, 2-Receptacles, 7-Added or Altered Branch Circuits, 1-HVAC Equipment - Inside, 1-S | |
| 23 109524 BF | 2023-06-02 | Electrical | 13427 NE Spring Blvd | A Nonresidential Repair or Replacement A Nonresidential Repair or Replacement ELECTRICAL FOR ELEVATOR MODERNIZATION @ HERITAGE BUILDING. Plan review waived by Chuck Murray. | |
| 22 129678 BF | 2022-12-02 | Electrical | 100 Bellevue Sq | A Single Family Residential Repair or Replacement Project Installing {4-Feeder, 4-Switches, 4-Receptacles} Re-feed new disconnects with exiting feeders. ** plan review waived by S | |
| 22 104187 BF | 2022-03-22 | Electrical | 3625 132nd Ave SE | A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 2 Added or Altered Branch Circuits) | |
| 22 102960 BF | 2022-03-08 | Electrical | 1300 114th Ave SE | A Nonresidential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 2-Feeder, 4-Light Fixtures, 2-Switches, 2-Receptacles, 7-Added or Altered Branch Circuits, 1-Sub | |
| 22 102948 BF | 2022-03-07 | Electrical | 11201 SE 8th St | *plans waived A Nonresidential Repair or Replacement Project Installing {1-Heat Pump, 2-Feeder, 7-Added or Altered Branch Circuits, 1-Subpanel} Replace elevator disconnects, upgrad | |
| 21 134673 BF | 2021-12-28 | Electrical | 11400 SE 8th St | ELECTRICAL FOR ELEVATOR MODERNIZATION **Plan review waived by S. Leighton | |
| 21 121159 FA | 2021-11-02 | Electrical | 15241 NE 20th St | For the purpose of elevator modernization, add detection and elevator controls per the submitted shop drawings. 14 devices. Not related to building construction/tenant improvements | |
| 21 129377 BF | 2021-11-01 | Electrical | 401 100th Ave NE | A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 2-Feeder, 4-Light Fixtures, 2-Switches, 2-Receptacles, 6-Added or Altered Branch Circui | |
| 21 116648 BF | 2021-08-06 | Electrical | 12920 SE 38th St | A Nonresidential Repair or Replacement Project Installing {25-Light Fixtures, 7-Switches, 7-Receptacles, 20-Added or Altered Branch Circuits, 2-Subpanel} Electrical for Elevator mo | |
| 21 108437 FA | 2021-06-15 | Electrical | 10819 NE 37th Pl - Unit site | For the purpose of elevator modernization, replace the fire alarm panel and all devices with addressable. Install new notification throughout. | |
| 21 110297 BF | 2021-06-15 | Electrical | 155 108th Ave NE | A Multifamily Residential Repair or Replacement Project Installing {1-Automatic Transfer Switch, 2-Heat Pump, 7-Feeder, 7-Switches, 7-Receptacles, 14-Added or Altered Branch Circui | |
| 21 109417 BF | 2021-05-28 | Electrical | 15241 NE 20th St | A Multifamily Residential Repair or Replacement Project Installing {4-Feeder, 4-Switches, 4-Receptacles, 12-Added or Altered Branch Circuits, 2-Subpanel} Electrical for Elevator Mo | |
| 21 107037 FA | 2021-04-28 | Electrical | 401 100th Ave NE | Replace the fire alarm panel to allow more devices. Add relays and detection for elevator control in machine rooms (x2) and pits.20 devices, panel and expansion slc | |
| 21 104651 BF | 2021-04-12 | Electrical | 3535 Factoria Blvd SE | A Nonresidential Repair or Replacement Project Installing {1-Other Equipment} Replace ATS at Sterling Plaza *Plan review waived by Steve Leighton | |
| 21 106202 BF | 2021-03-23 | Electrical | 401 100th Ave NE - Unit P-25 | Electrical for Elevator Modernization @ Windsor House. **Plans waived by S. Leighton | |
| 20 122696 FA | 2021-01-07 | Electrical | 11811 NE 1st St | Add dedicated purpose FA to building for elevator control. 5 smokes, 3 relays, 1 FACP | |
| 20 122693 FA | 2021-01-07 | Electrical | 11911 NE 1st St | Install new, dedicated purpose FA for elevator modernization. Install 8 devices for elevator control | |
| 20 119528 BF | 2020-10-15 | Electrical | 11911 NE 1st St | A Nonresidential Repair or Replacement Project Installing {2-Feeder, 4-Light Fixtures, 2-Switches, 2-Receptacles, 1-HVAC Equipment - Inside, 1-HVAC Equipment - Outside, 1-Subpanel} | |
| 20 119393 BF | 2020-10-13 | Electrical | 11811 NE 1st St | A Nonresidential Repair or Replacement Project Installing {2-Feeder, 7-Added or Altered Branch Circuits, 1-HVAC Equipment - Inside, 1-HVAC Equipment - Outside, 1-Subpanel} *Plans w | |
| 20 114061 BF | 2020-09-09 | Electrical | 411 108th Ave NE | A Nonresidential Repair or Replacement Electrical Project Involving (8 Light Fixtures, 4 Receptacles, 4 Switches, 6 Added or Altered Branch Circuits) | |
| 20 111799 BF | 2020-07-23 | Electrical | 3535 Factoria Blvd SE | A Nonresidential Repair or Replacement Project Installing {2-Elevator, 1-Heat Pump, 3-Feeder, 12-Light Fixtures, 3-Switches, 3-Receptacles, 6-Added or Altered Branch Circuits, 1-Su | |
| 20 109011 BF | 2020-05-19 | Electrical | 3009 112th Ave NE | Electrical for elevator modernization @ East Corp ***Plans Waived by Steve Leighton | |
| 20 105139 FA | 2020-04-14 | Electrical | 2821 Northup Way | Add dedicated fire alarm, four smoke detectors, three relays | |
| 20 104345 BF | 2020-03-09 | Electrical | 10819 NE 37th Pl - Unit site | A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 1-Feeder, 2-Switches, 2-Receptacles, 5-Added or Altered Branch Circuits} Electrical for | |
| 20 103848 BF | 2020-02-25 | Electrical | 2821 Northup Way | A Nonresidential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 1-Feeder, 4-Light Fixtures, 2-Switches, 2-Receptacles, 5-Added or Altered Branch Circuits, 1-Pan | |
| 20 102647 BF | 2020-01-30 | Electrical | 554 100th Ave SE | A Multifamily Residential Repair or Replacement Project Installing {3-Service Change 1-125 amps} Like for like replacement 125 amp meter base that is currently melting down. *Plans | |
| 19 131708 FA | 2019-12-31 | Electrical | 301 116th Ave SE | Install hat light relay for elevator modernization | |
| 19 130646 FA | 2019-12-16 | Electrical | 2950 Northup Way | Add notification appliances to building addition, 19-119391BW | |
| 19 131247 BF | 2019-12-12 | Electrical | 15400 SE 30th Pl | A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Light Fixtures, 4 Added or Altered Branch Circuits) | |
| 19 129075 BF | 2019-11-18 | Electrical | 3655 131st Ave SE | A Nonresidential Alteration to Existing Structure Project Installing {3-Elevator, 3-Light Fixtures, 6-Added or Altered Branch Circuits} Electrical for Elevator Modernization* Plans | |
| 19 128720 BF | 2019-11-12 | Electrical | 1035 116th Ave NE | A Nonresidential Repair or Replacement Project Installing {2-Light Fixtures, 2-Added or Altered Branch Circuits} Pit and machine room lighting and reconnecting cab lights. **Plan r | |
| 19 128148 BF | 2019-10-28 | Electrical | 301 116th Ave SE | A Nonresidential Alteration to Existing Structure Project Installing {6-Elevator, 3-Feeder, 6-Added or Altered Branch Circuits} Electrical for elevator modernization | |
| 19 124715 BF | 2019-10-02 | Electrical | 320 101st Ave SE - Unit Site | A Multifamily Residential Repair or Replacement Project Installing {1-Panel} Zinsco 100amp which we will be replacing with Square D of the same size **Plan review waived by Steve L | |
| 19 123919 BF | 2019-09-11 | Electrical | 15400 SE 30th Pl | A Nonresidential Alteration to Existing Structure Electrical Project Involving (30 Light Fixtures, 3 Added or Altered Branch Circuits) | |
| 19 118521 BF | 2019-07-05 | Electrical | 100 Bellevue Sq | A Nonresidential Alteration to Existing Structure Project Installing {4-Feeder, 4-Added or Altered Branch Circuits} Disconnect and re-connect 4 escalators and circuits in pit. **Pl |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Bellevue permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
