COMPANY RECORD · AUSTIN, TX

Triangle Electrical Contractors — permit history in Austin, TX

Triangle Electrical Contractors appears on 156 Austin permit records from 2019 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical156100%

Activity by year

YearPermits issued
201929
202075
202114
202211
20232
20256
202619

Busiest year on record: 2020, with 75 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Embrey Builders, LLC192020-10-29
Rampart Multifamily (Main)172021-09-07
Luminous Development Group LLC72022-09-07
Aspen Topco II Construction, LLC72020-11-12
Small House Solution32020-04-25
Maye's Quality Trim32020-03-06
Let Group LLC22020-02-11
Fun N Sun Pools Of Austin, Inc.22023-04-20
Corten Core Construction22026-08-27
Vanrossun Contracting12020-04-22
Tcc Builders LLC12020-10-30
Southern Pools Service & Spas12019-07-09

36 companies are named alongside Triangle Electrical Contractors on the same Austin permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
302 TILBURY LN BLDG 22026-08-27
1201 RIDGEHAVEN DR2026-08-27
4704 ARAPAHOE PASS2026-08-12
11309 BLAIRVIEW LN2026-08-12
302 TILBURY LN2026-08-12
2401 FOREST BEND DR2026-07-21
3606 WINFIELD CV2026-06-17
701 PROVINES DR BLDG D2026-06-16
11816 BITTERN HOLW2026-06-16
5108 PLUMAS LN2026-06-08
12400 CASCADE CAVERNS TRL2026-06-03
2142 E 7TH ST2026-06-01
8701 HONEYSUCKLE TRL2026-05-30
2909 STRATFORD DR2026-05-23

127 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

156 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
2026-082859 EP2026-08-27Electrical302 TILBURY LN BLDG 2
2026-110909 EP2026-08-27Electrical1201 RIDGEHAVEN DR
2026-098137 EP2026-08-12Electrical4704 ARAPAHOE PASS
2026-081299 EP2026-08-12Electrical11309 BLAIRVIEW LN
2026-082860 EP2026-08-12Electrical302 TILBURY LN
2026-091475 EP2026-07-22Electrical302 TILBURY LN
2026-092946 EP2026-07-21Electrical2401 FOREST BEND DR
2026-073759 EP2026-06-17Electrical3606 WINFIELD CV
2026-076010 EP2026-06-16Electrical701 PROVINES DR BLDG D
2026-076040 EP2026-06-16Electrical11816 BITTERN HOLW
2026-069446 EP2026-06-08Electrical5108 PLUMAS LN
2026-069434 EP2026-06-08Electrical4704 ARAPAHOE PASS
2026-062380 EP2026-06-03Electrical12400 CASCADE CAVERNS TRL
2026-060504 EP2026-06-01Electrical2142 E 7TH ST
2026-066774 EP2026-05-30Electrical8701 HONEYSUCKLE TRL
2026-043593 EP2026-05-23Electrical2909 STRATFORD DR
2026-052765 EP2026-05-18Electrical8101 PARKDALE DR
2026-054240 EP2026-05-03Electrical2101 BURTON DR UNIT 1042
2024-126344 EP2026-01-29Electrical10300 METROPOLITAN DR UNIT FIREP1
2025-128735 EP2025-12-02Electrical4301 W WILLIAM CANNON DR BLDG H UNIT 105
2024-139515 EP2025-08-12Electrical2414 S LAMAR BLVD BLDG A
2025-081289 EP2025-07-01Electrical5501 N IH 35 SVRD NB UNIT D
2024-137608 EP2025-06-29Electrical904 W JAMES ST
2024-062432 EP2025-06-23Electrical6605 GREENSBORO DR
2021-001465 EP2025-02-27Electrical10513 W PARMER LN
2022-167234 EP2023-05-17Electrical14115 N 183A HWY SVRD NB BLDG CP8
2022-074538 EP2023-04-20Electrical10300 METROPOLITAN DR
2022-134839 EP2022-09-20Electrical1417 KRAMER LN UNIT 5
2022-031617 EP2022-09-07Electrical1417 KRAMER LN UNIT 5
2022-031543 EP2022-09-07Electrical1417 KRAMER LN
2022-031619 EP2022-09-07Electrical1417 KRAMER LN UNIT 7
2022-031592 EP2022-09-07Electrical1417 KRAMER LN UNIT 3
2022-031618 EP2022-09-07Electrical1417 KRAMER LN UNIT 6
2022-028592 EP2022-09-07Electrical1417 KRAMER LN UNIT 19
2022-028585 EP2022-09-07Electrical1417 KRAMER LN UNIT 20
2022-117073 EP2022-08-26Electrical1807 THREE POINTS RD
2020-116966 EP2022-08-06Electrical1807 THREE POINTS RD
2022-081346 EP2022-06-09Electrical10300 1/2 METROPOLITAN DR
2021-195259 EP2021-12-13Electrical11413 1/2 N 183A HWY SVRD NB UNIT C
2021-195256 EP2021-12-13Electrical11413 1/2 N 183A HWY SVRD NB UNIT B
2021-195231 EP2021-12-13Electrical11413 1/2 N 183A HWY SVRD NB UNIT A
2021-142500 EP2021-09-14Electrical303 JOHN NANCE GARNER CIR
2021-044429 EP2021-09-07Electrical10300 METROPOLITAN DR
2021-044430 EP2021-09-07Electrical10300 METROPOLITAN DR
2021-044428 EP2021-09-07Electrical10300 METROPOLITAN DR
2021-044427 EP2021-09-07Electrical10300 METROPOLITAN DR
2020-018552 EP2021-04-20Electrical201 WESTBROOK DR
2021-046087 EP2021-04-06Electrical1702 1/2 WILLOW CREEK DR
2021-045814 EP2021-04-05Electrical3706 GOODWIN AVE UNIT 1
2021-043943 EP2021-03-29Electrical3706 1/2 GOODWIN AVE

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Austin permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →