COMPANY RECORD · AUSTIN, TX

Total Home Electrical Contractors, LLC — permit history in Austin, TX

Total Home Electrical Contractors, LLC appears on 36 Austin permit records from 2024 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical36100%

Activity by year

YearPermits issued
20242
202521
202613

Busiest year on record: 2025, with 21 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Burnish & Plumb Construction *Main92026-02-04
Mg Construction Works LLC22026-08-19
Nelson Rockwood Homes, LLC12025-03-19
North Loop Builders12026-08-10
Southwest Exteriors Inc12025-12-03

5 companies are named alongside Total Home Electrical Contractors, LLC on the same Austin permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
2802 STRATFORD DR2026-08-19
1911 PEOPLES ST2026-08-10
1306 ROCKCLIFF RD2026-08-05
2604 WOOLDRIDGE DR2026-06-26
2602 WOOLDRIDGE DR2026-06-26
2509 TARRYHILL PL2026-06-01
903 W 18TH ST UNIT B2026-05-05
3006 WEST TERRACE DR2026-04-28
2707 WOOLDRIDGE DR2026-03-30
4220 DAUPHINE DR2026-02-23
5664 RAIN CREEK PKWY2025-12-03
7007 DANWOOD DR2025-08-06
3703 CEDAR ST2025-08-06
903 W 18TH ST2025-07-23

24 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

36 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
2025-160010 EP2026-08-19Electrical2802 STRATFORD DR
2025-126122 EP2026-08-10Electrical1911 PEOPLES ST
2026-048494 EP2026-08-05Electrical1306 ROCKCLIFF RD
2026-080017 EP2026-06-26Electrical2604 WOOLDRIDGE DR
2026-080022 EP2026-06-26Electrical2602 WOOLDRIDGE DR
2026-033563 EP2026-06-01Electrical2509 TARRYHILL PL
2026-054264 EP2026-05-05Electrical903 W 18TH ST UNIT B
2025-160007 EP2026-05-05Electrical2802 STRATFORD DR
2026-047620 EP2026-04-28Electrical3006 WEST TERRACE DR
2026-015612 EP2026-03-30Electrical2707 WOOLDRIDGE DR
2026-021274 EP2026-02-23Electrical4220 DAUPHINE DR
2026-002888 EP2026-02-05Electrical2707 WOOLDRIDGE DR
2026-008714 EP2026-02-04Electrical2707 WOOLDRIDGE DR
2025-103623 EP2025-12-03Electrical5664 RAIN CREEK PKWY
2024-087033 EP2025-12-02Electrical2707 WOOLDRIDGE DR
2025-142747 EP2025-11-07Electrical2509 TARRYHILL PL
2025-106938 EP2025-10-16Electrical1306 ROCKCLIFF RD
2025-097797 EP2025-08-06Electrical7007 DANWOOD DR
2025-097998 EP2025-08-06Electrical3703 CEDAR ST
2025-097999 EP2025-08-06Electrical3703 CEDAR ST
2025-093697 EP2025-07-31Electrical1306 ROCKCLIFF RD
2024-072929 EP2025-07-23Electrical903 W 18TH ST
2023-143202 EP2025-07-17Electrical3405 RIVERCREST DR
2025-076986 EP2025-06-24Electrical311 WESTHAVEN DR
2025-075195 EP2025-06-19Electrical311 WESTHAVEN DR
2025-073150 EP2025-06-19Electrical1409 KENT LN
2025-073146 EP2025-06-19Electrical1405 KENT LN
2025-053689 EP2025-05-06Electrical7813 TEXAS PLUME RD
2025-038145 EP2025-05-05Electrical4712 LITTLE HILL CIR
2024-034155 EP2025-04-02Electrical906 EBONY ST
2025-034865 EP2025-03-28Electrical2707 WOOLDRIDGE DR
2025-033321 EP2025-03-21Electrical2707 WOOLDRIDGE DR
2024-087028 EP2025-03-21Electrical2707 WOOLDRIDGE DR
2024-043900 EP2025-03-19Electrical100 PASCAL LN BLDG BD
2024-158778 EP2024-12-12Electrical11702 KNOLLPARK DR
2024-156056 EP2024-12-02Electrical906 MAUFRAIS ST

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Austin permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →