COMPANY RECORD · AUSTIN, TX
Navejas Electric LLC — permit history in Austin, TX
Navejas Electric LLC appears on 227 Austin permit records from 2019 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 227 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 41 |
| 2020 | 23 |
| 2021 | 25 |
| 2022 | 37 |
| 2023 | 32 |
| 2024 | 29 |
| 2025 | 26 |
| 2026 | 14 |
Busiest year on record: 2019, with 41 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Austin permit, not only this company's
This page is a snapshot of Navejas Electric LLC. The search behind it holds more than 394,837 Austin permits naming a contractor, since 2019: 126,183 electrical permits, 101,396 building permits, 95,896 plumbing permits, 71,362 mechanical (HVAC) permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Navejas Electric LLC files, or any new electrical permit in Austin. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Trimbuilt Construction, Inc. | 56 | 2026-09-09 |
| Pravo Construction | 19 | 2024-02-28 |
| River Hills Construction Ltd | 19 | 2025-03-31 |
| Novo Construction **Main | 13 | 2026-03-03 |
| Rivendale Homes Texas Llc/ Pavillian Communities Texas, LLC ***Main | 11 | 2024-06-12 |
| Harvey-Cleary Builders ***Main | 9 | 2026-05-29 |
| Structura, Inc. | 9 | 2023-01-26 |
| The Burt Group**Main | 8 | 2025-09-24 |
| Rand Construction Corporation | 8 | 2024-01-09 |
| Hitt Contracting | 6 | 2022-10-03 |
| Swinerton Builders Inc. | 5 | 2025-08-27 |
| Muckleroy & Falls | 5 | 2026-09-21 |
31 companies are named alongside Navejas Electric LLC on the same Austin permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 12 | 2026-09-21 |
| 2404 COMBURG CASTLE WAY | 2026-09-16 |
| 624 N PLEASANT VALLEY RD | 2026-09-09 |
| 8222 JAMESTOWN DR BLDG E UNIT 6 | 2026-08-31 |
| 701 E PARMER LN BLDG 2 | 2026-08-07 |
| 4437 SUPPLY CT UNIT 101 | 2026-08-06 |
| 709 RIO GRANDE ST | 2026-08-05 |
| 1645 E 6TH ST UNIT 400 | 2026-05-29 |
| 1645 E 6TH ST UNIT 300 | 2026-05-29 |
| 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 10 | 2026-04-29 |
| 701 E PARMER LN BLDG PS4 | 2026-03-03 |
| 8001 1/2 CIRCUIT OF THE AMERICAS BLVD UNIT TEMP11 | 2026-02-18 |
| 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 11 | 2026-01-29 |
| 701 E PARMER LN BLDG 3 | 2026-01-14 |
178 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| P & P Plumbing | 32 | 2020–2024 |
| Airco Mechanical | 28 | 2019–2026 |
| Trimbuilt Construction, Inc. | 25 | 2019–2026 |
| River Hills Construction Ltd | 20 | 2020–2025 |
| Nuflo Plumbing | 14 | 2019–2025 |
| Cool Services Inc. | 14 | 2019–2026 |
| Elite Heating And Air Conditioning LLC | 14 | 2022–2024 |
| Rivendale Homes Texas Llc/ Pavillian Communities Texas, LLC ***Main | 12 | 2023–2024 |
Companies that also appear in Austin permit records at addresses where Navejas Electric LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
227 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 2023-084669 EP | 2026-09-21 | Electrical | 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 12 | ||
| 2026-109944 EP | 2026-09-16 | Electrical | 2404 COMBURG CASTLE WAY | ||
| 2026-096803 EP | 2026-09-09 | Electrical | 624 N PLEASANT VALLEY RD | ||
| 2026-112552 EP | 2026-08-31 | Electrical | 8222 JAMESTOWN DR BLDG E UNIT 6 | ||
| 2026-102789 EP | 2026-08-07 | Electrical | 701 E PARMER LN BLDG 2 | ||
| 2026-080181 EP | 2026-08-06 | Electrical | 4437 SUPPLY CT UNIT 101 | ||
| 2026-069771 EP | 2026-08-05 | Electrical | 709 RIO GRANDE ST | ||
| 2026-055947 EP | 2026-05-29 | Electrical | 1645 E 6TH ST UNIT 400 | ||
| 2026-055946 EP | 2026-05-29 | Electrical | 1645 E 6TH ST UNIT 300 | ||
| 2023-084672 EP | 2026-04-29 | Electrical | 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 10 | ||
| 2026-008281 EP | 2026-03-03 | Electrical | 701 E PARMER LN BLDG PS4 | ||
| 2026-015827 EP | 2026-02-18 | Electrical | 8001 1/2 CIRCUIT OF THE AMERICAS BLVD UNIT TEMP11 | ||
| 2023-084670 EP | 2026-01-29 | Electrical | 8001 CIRCUIT OF THE AMERICAS BLVD BLDG 11 | ||
| 2025-095430 EP | 2026-01-14 | Electrical | 701 E PARMER LN BLDG 3 | ||
| 2025-134884 EP | 2025-11-13 | Electrical | 12500 TECH RIDGE BLVD | ||
| 2021-196439 EP | 2025-10-27 | Electrical | 12500 TECH RIDGE BLVD | ||
| 2025-055168 EP | 2025-09-24 | Electrical | 205 E 3RD ST | ||
| 2025-117175 EP | 2025-09-19 | Electrical | 701 E PARMER LN BLDG PS2 | ||
| 2025-093851 EP | 2025-08-27 | Electrical | 701 E PARMER LN BLDG 2 | ||
| 2025-091282 EP | 2025-08-04 | Electrical | 3100 E 5TH ST UNIT 200 | ||
| 2025-091280 EP | 2025-08-04 | Electrical | 3100 E 5TH ST UNIT 100 | ||
| 2025-091281 EP | 2025-08-04 | Electrical | 3100 E 5TH ST UNIT 120 | ||
| 2025-072698 EP | 2025-07-08 | Electrical | 3100 E 5TH ST UNIT 180 | ||
| 2025-078757 EP | 2025-07-07 | Electrical | 1303 SAN ANTONIO ST UNIT 600 | ||
| 2025-070307 EP | 2025-07-07 | Electrical | 1303 SAN ANTONIO ST UNIT 500 | ||
| 2025-055349 EP | 2025-06-20 | Electrical | 1901 CAPITAL PKWY UNIT 100 | ||
| 2025-076005 EP | 2025-06-20 | Electrical | 11605 OAK HAVEN CV | ||
| 2025-055350 EP | 2025-06-20 | Electrical | 1901 CAPITAL PKWY UNIT 101 | ||
| 2025-055157 EP | 2025-06-02 | Electrical | 14028 N US 183 HWY SVRD SB BLDG G UNIT 330 | ||
| 2025-055351 EP | 2025-05-27 | Electrical | 1901 CAPITAL PKWY UNIT 200 | ||
| 2025-055352 EP | 2025-05-27 | Electrical | 1901 CAPITAL PKWY UNIT 201 | ||
| 2025-058183 EP | 2025-05-14 | Electrical | 11920 ALTERRA PKWY UNIT FL9 | ||
| 2025-026310 EP | 2025-05-07 | Electrical | 12500 TECH RIDGE BLVD | ||
| 2025-038922 EP | 2025-04-23 | Electrical | 1111 W 6TH ST BLDG A UNIT 120 | ||
| 2024-155462 EP | 2025-04-09 | Electrical | 1213 KAREN AVE BLDG 2 | ||
| 2024-155461 EP | 2025-04-09 | Electrical | 1213 KAREN AVE BLDG 1 | ||
| 2025-034467 EP | 2025-03-31 | Electrical | 721 BARTON SPRINGS RD | ||
| 2024-122492 EP | 2025-03-31 | Electrical | 13903 PANORAMA DR | ||
| 2024-131057 EP | 2025-02-26 | Electrical | 1404 GARDEN ST | ||
| 2025-005035 EP | 2025-02-10 | Electrical | 701 E PARMER LN BLDG 2 | ||
| 2024-151189 EP | 2024-12-16 | Electrical | 12500 TECH RIDGE BLVD | ||
| 2024-011062 EP | 2024-10-07 | Electrical | 12500 TECH RIDGE BLVD | ||
| 2024-084092 EP | 2024-09-09 | Electrical | 11800 ALTERRA PKWY UNIT FLR8 | ||
| 2024-087880 EP | 2024-08-20 | Electrical | 7901 N IH 35 SVRD NB BLDG 1 | ||
| 2023-101196 EP | 2024-06-24 | Electrical | 701 E PARMER LN BLDG 2 | ||
| 2024-022780 EP | 2024-06-12 | Electrical | 6805 GLEN RIDGE DR | ||
| 2024-025846 EP | 2024-06-12 | Electrical | 2706 PARK VIEW DR | ||
| 2024-039924 EP | 2024-06-12 | Electrical | 2606 CAVILEER AVE | ||
| 2021-199672 EP | 2024-06-07 | Electrical | 701 E PARMER LN BLDG PS2 | ||
| 2024-054333 EP | 2024-06-05 | Electrical | 701 E PARMER LN BLDG 3 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Austin permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
