COMPANY RECORD · NASHVILLE, TN
Mitchell Mechanical LLC — permit history in Nashville, TN
Mitchell Mechanical LLC appears on 752 Nashville permit records from 2023 through 2026, most often mechanical / hvac (72.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 546 | 72.6% |
| Plumbing | 206 | 27.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2023 | 166 |
| 2024 | 210 |
| 2025 | 135 |
| 2026 | 241 |
Busiest year on record: 2026, with 241 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1221 GRUNDY ST | 2026-09-03 |
| 1740 DIVISION ST | 2026-07-20 |
| 1717 HAYES ST | 2026-07-07 |
| 605 EWING AVE | 2026-04-09 |
| 923 DIVISION ST | 2026-03-10 |
| 1401 CHURCH ST | 2025-07-24 |
| 1815 CHURCH ST | 2025-06-19 |
| 1319 ADAMS ST | 2024-09-05 |
| 4100 HILLSBORO PIKE | 2024-06-25 |
| 960 COMMERCE ST | 2024-04-29 |
| 930 COMMERCE ST 308 | 2024-04-29 |
| 1214 DEMONBREUN ST | 2024-03-04 |
| 4100 HILLSBORO PIKE 2101-2106 | 2024-02-29 |
| 4100 HILLSBORO PIKE 2201-2206 | 2024-02-29 |
39 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $98,984,000, median $675,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Power Design Inc | 31 | 2023–2026 |
| Huxtable Electric, Inc. | 2 | 2023–2026 |
| Nashville Fireplace Distributors Inc | 1 | 2025–2026 |
| Titan Electric | 1 | 2024–2026 |
| Heavenly Air | 1 | 2026 |
| Heatmasters Mechanical, LLC | 1 | 2025–2026 |
| Empower Electric LLC | 1 | 2024 |
| Jarrett Builders Inc | 1 | 2023 |
Companies that also appear in Nashville permit records at addresses where Mitchell Mechanical LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
752 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 2026084852 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084849 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084860 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084861 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084862 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084863 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084864 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084827 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084828 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084858 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084851 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084850 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084853 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084848 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084834 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084829 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084831 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084856 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084833 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084847 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $234,199 | |
| 2026084854 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084845 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084846 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $15,200 | |
| 2026084844 | 2026-10-11 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $21,291 | |
| 2026084791 | 2026-10-09 | Mechanical / HVAC | to construct podium level of parking garage for belle meade plaza. not to be over any easements.---------------- Podium - Lower Level 3 | $339,740 | |
| 2026083042 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083011 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083025 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083029 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083039 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083051 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083045 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083049 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083055 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083057 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083005 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083007 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083000 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082957 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083060 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083068 | 2026-10-08 | Mechanical / HVAC | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082995 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026083018 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082986 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082993 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082951 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082964 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082954 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082948 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 | |
| 2026082949 | 2026-10-08 | Plumbing | ******CHECK IN SAFE #283 $148,611.72 LEFT BY RYAN SAUNDERS****** This multi-family project consists of a 26-Story 325 apartment unit tower with a 5-story podium. The podium cont | $9,894,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 752 permits above are a static record through 2026. Select a year above to open that year’s records, or search Mitchell Mechanical LLC in Nashville, TN by address, trade or date range.
Source and limits
Public Nashville permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
