COMPANY RECORD · PHILADELPHIA, PA
Sean P Evans — permit history in Philadelphia, PA
Sean P Evans appears on 54 Philadelphia permit records from 2021 through 2026, all of them plumbing.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 54 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 8 |
| 2022 | 5 |
| 2023 | 19 |
| 2024 | 12 |
| 2025 | 7 |
| 2026 | 3 |
Busiest year on record: 2023, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| Jayme J Guokas And Anna-Alexandra Fodde-Reguer | 9 | 2025-10-27 |
| Kingbig Inc | 2 | 2021-11-16 |
| Peter Dobczynski | 2 | 2025-12-20 |
| Al Investors LLC | 1 | 2024-04-05 |
| International Building Management Group Inc | 1 | 2023-03-25 |
| Carrera Brothers LLC | 1 | 2023-11-28 |
| Jianyi Huang | 1 | 2025-02-03 |
| Qb 3 LLC | 1 | 2026-06-16 |
8 named participants share a resolved project timeline with Sean P Evans. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1811 DALY ST | 2026-09-24 |
| 241 S 6TH ST | 2026-06-16 |
| 2401 WASHINGTON AVE | 2026-06-15 |
| 2016 S 16TH ST | 2025-12-20 |
| 2108 E YORK ST | 2025-10-27 |
| 577 MARTIN ST | 2025-04-14 |
| 244 CATHARINE ST | 2025-03-13 |
| 1418 E SUSQUEHANNA AVE | 2025-02-26 |
| 2061 RED LION RD | 2025-02-03 |
| 1323-25 S 2ND ST | 2025-01-10 |
| 618 SOUTH ST | 2024-12-23 |
| 5649 CHRISTIAN ST | 2024-12-11 |
| 4708 CHESTNUT ST | 2024-12-05 |
| 233 W GEORGE ST | 2024-08-21 |
54 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| William Sommerville | 9 | 2021–2025 |
| Service One HVAC LLC | 8 | 2021–2025 |
| Best Choice Plumbing Inc.. | 2 | 2023–2026 |
| Omar Rivera | 2 | 2021–2026 |
| Radoslaw Zbikowski | 2 | 2023–2025 |
| B M Consulting Services Inc | 2 | 2022–2026 |
| Ambit Inc | 2 | 2021–2025 |
| Herman Goldner Co Inc | 2 | 2021–2026 |
Companies that also appear in Philadelphia permit records at addresses where Sean P Evans filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
54 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| PP-2026-013144 | 2026-09-24 | Plumbing | 1811 DALY ST | - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing. | |
| PP-2026-007354 | 2026-06-16 | Plumbing | 241 S 6TH ST | Replace existing shower with tub. Move existing kitchen sink | |
| PP-2026-002215 | 2026-06-15 | Plumbing | 2401 WASHINGTON AVE | Plumbing per plans | |
| PP-2025-016270 | 2025-12-20 | Plumbing | 2016 S 16TH ST | 3 full baths, powder room, laundry sink, kitchen sink, water heater, 2 hose bibs other equipment = pot filler | |
| PP-2025-012467 | 2025-10-27 | Plumbing | 2108 E YORK ST | Install new drain lines to existing powder room, add new second floor 4 piece bathroom group including new drains and water lines. Move existing KS slightly. | |
| PP-2025-004430 | 2025-04-14 | Plumbing | 577 MARTIN ST | move laundry, direct replace KS, new water heater, 4 pc bathroom group (wc,lav,tub, and shower). new branch lines to bathroom fixtures. | |
| PP-2025-003166 | 2025-03-13 | Plumbing | 244 CATHARINE ST | 2 LAVS 2 TUB/SHOWER 2 WC 1 KITCHEN SINK 1 DW RELOCATE LAUNDRY PLUMBING IN BASEMENT( to rear) and add plumbing for laundry sink (repurposing existing kitchen sink and counter for ba | |
| PP-2025-002420 | 2025-02-26 | Plumbing | 1418 E SUSQUEHANNA AVE | move kitchen sink 5' | |
| PP-2025-000955 | 2025-02-03 | Plumbing | 2061 RED LION RD | Remodel kitchen and bathrooms, replace three toilets, one bathtub, a standing shower, a kitchen sink, and three vanities. The owner is doing the work, no master plumber is needed. | |
| PP-2025-000333 | 2025-01-10 | Plumbing | 1323-25 S 2ND ST | Install RP backflow device ONLY | |
| PP-2024-017221 | 2024-12-23 | Plumbing | 618 SOUTH ST | Install RP backflow device ONLY | |
| PP-2024-016836 | 2024-12-11 | Plumbing | 5649 CHRISTIAN ST | Install RP backflow device ONLY | |
| PP-2024-015927 | 2024-12-05 | Plumbing | 4708 CHESTNUT ST | Install RP backflow device ONLY | |
| PP-2024-011080 | 2024-08-21 | Plumbing | 233 W GEORGE ST | direct replacement of double bowl vanity and shower pan | |
| PP-2024-007620 | 2024-06-17 | Plumbing | 1728-30 W MONTGOMERY AVE | install RP backflow device ONLY | |
| PP-2024-005622 | 2024-04-17 | Plumbing | 2226 FRANKFORD AVE | REPLACE 1" BACKFLOW DEVICE. | |
| PP-2024-005120 | 2024-04-05 | Plumbing | 834 WINTON ST | REPLACE INTERIOR DRAIN, STACK & YARD DRAIN. Sewage ejection pit with bathroom group, SUMP pit and pump, washing machine box (LAUNDRY SINK), half bath 1st floor, KS, bathroom grou | |
| PP-2024-001086 | 2024-03-18 | Plumbing | 4147-49 MAIN ST | REPLACE 3/4" BACKFLOW DEVICE. | |
| PP-2024-001087 | 2024-03-18 | Plumbing | 17 W ALLENS LN | REPLACE 1-1/2" BACKFLOW DEVICE. | |
| PP-2024-003349 | 2024-03-11 | Plumbing | 2623 W GIRARD AVE | RP Backflow device ONLY | |
| PP-2024-002006 | 2024-02-12 | Plumbing | 1822 SPRING GARDEN ST | REPLACE 3/4" BBACKFLOW DEVICE. | |
| PP-2024-000631 | 2024-01-23 | Plumbing | 3580 INDIAN QUEEN LN | BackFlow | |
| PP-2023-016452 | 2023-12-12 | Plumbing | 4626 FRANKFORD AVE | REPLACE 3/4" BACKFLOW DEVICE. | |
| PP-2023-016519 | 2023-12-12 | Plumbing | 3428 N 11TH ST | REPLACE 3/4" BACKFLOW DEVICE. | |
| PP-2023-015220 | 2023-11-28 | Plumbing | 1007 CARPENTER ST | Piping and fixtures for new bathroom group (WC, LAV & SHOWER). Extend existing stack up through new addition 3rd floor roof | |
| PP-2023-013647 | 2023-11-06 | Plumbing | 2401 FRANKFORD AVE | Setting fixtures only. | |
| PP-2023-012059 | 2023-09-12 | Plumbing | 3401 POWELTON AVE | INSTALL 2" BACKFLOW DEVICE. | |
| PP-2023-011304 | 2023-08-16 | Plumbing | 2800 GRANT AVE | INSTALL 1" BACKFLOW DEVICE. | |
| PP-2023-007377 | 2023-06-06 | Plumbing | 7606 OGONTZ AVE | INSTALL 3/4" BACKFLOW DEVICE | |
| PP-2023-006730 | 2023-05-23 | Plumbing | 133 N 11TH ST | INSTALL 3/4' BACKFLOW DEVICE | |
| PP-2023-006872 | 2023-05-23 | Plumbing | 2819 W GIRARD AVE | INSTALL 3/4" BACKFLOW DEVICE | |
| PP-2023-007029 | 2023-05-23 | Plumbing | 2633 W GIRARD AVE | Install RP backflow only | |
| PP-2023-005408 | 2023-04-27 | Plumbing | 4208-16 GERMANTOWN AVE | INSTALL 3/4" BACKFLOW DEVICE | |
| PP-2023-005510 | 2023-04-26 | Plumbing | 2406 GERMANTOWN AVE | For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ S | |
| PP-2023-004669 | 2023-04-11 | Plumbing | 1530 S CHRISTOPHER COLUMBUS BLVD | INSTALL 1" BACKFLOW DEVICE | |
| PP-2023-004320 | 2023-04-04 | Plumbing | 337 SOUTH ST | INSTALL 3/4" BACKFLOW DEVICE | |
| PP-2023-004328 | 2023-04-04 | Plumbing | 629-31 SOUTH ST | INSTALL 3/4" BACKFLOW DEVICE | |
| PP-2023-004011 | 2023-03-28 | Plumbing | 8711 RIDGE AVE | Install 3/4" backflow preventer only. | |
| PP-2023-003665 | 2023-03-25 | Plumbing | 1808 SPRUCE ST | Replace/Repair 6 existing plumbing fixtures as well as move existing rough-in locations to accommodate for new fixtures. | |
| PP-2023-002143 | 2023-03-10 | Plumbing | 2327 EMERALD ST | New stack for roof drain, and new stack for plumbing to include powder room, full bath, KS, garbage disposal, icemaker, DW, Washing machine and 2 hosebib and water heater 11 FIXTUR | |
| PP-2023-002855 | 2023-03-07 | Plumbing | 2732 GERMANTOWN AVE | INSTALL BACKFLOW DEVICE | |
| PP-2022-016923 | 2022-11-23 | Plumbing | 5843 GERMANTOWN AVE | Install mandated 3/4" backflow preventer | |
| PP-2022-016032 | 2022-11-08 | Plumbing | 5910 GERMANTOWN AVE | INSTALL BACKFLOW PREVENTION DEVICE | |
| PP-2022-016033 | 2022-11-08 | Plumbing | 5914 GERMANTOWN AVE | INSTALL BACKFLOW PREVENTION DEVICE | |
| PP-2022-015964 | 2022-11-03 | Plumbing | 6355 GERMANTOWN AVE | Install new backflow preventer RP | |
| PP-2022-015532 | 2022-11-02 | Plumbing | 5837 GERMANTOWN AVE | Install 3/4" backflow preventer RP | |
| PP-2021-021674 | 2021-11-16 | Plumbing | 1909 BRANDYWINE ST | Relocate kitchen sink, connect to existing stack to pick up laundry and new bathroom group on 3rd floor. | |
| PP-2021-018900 | 2021-10-15 | Plumbing | 245 E WILDEY ST | Connect fixtures to existing stack. shower, WC, 2 lavs | |
| PP-2021-018243 | 2021-10-14 | Plumbing | 1538 RODMAN ST | New stack to pick up laundry box (other fixture) in basement, full bath on second floor, and half bath on 3rd floor. Connect KS in basement to existing line. | |
| PP-2021-009452 | 2021-06-16 | Plumbing | 1127 ANNIN ST | Re-configure existing 3rd floor bathroom, toilet, tub, 2 lavatory PPC 2018 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 54 permits above are a static record through 2026. Select a year above to open that year’s records, or search Sean P Evans in Philadelphia, PA by address, trade or date range.
Source and limits
Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
