COMPANY RECORD · PHILADELPHIA, PA
Nhan T Le — permit history in Philadelphia, PA
Nhan T Le appears on 149 Philadelphia permit records from 2021 through 2026, most often plumbing (78.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 117 | 78.5% |
| Building | 16 | 10.7% |
| Mechanical | 13 | 8.7% |
| Residential Building | 2 | 1.3% |
| Zoning | 1 | 0.67% |
5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 19 |
| 2022 | 19 |
| 2023 | 29 |
| 2024 | 25 |
| 2025 | 35 |
| 2026 | 22 |
Busiest year on record: 2025, with 35 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Philadelphia permit, not only this company's
This page is a snapshot of Nhan T Le. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Nhan T Le files, or any new plumbing permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| All Liberty One Construction LLC | 13 | 2026-08-24 |
| Nick Van Tran Diana Tran | 6 | 2026-07-12 |
| P&P Construction LLC | 5 | 2023-07-13 |
| Adcar Construction Inc | 5 | 2025-10-02 |
| Tam Bui | 4 | 2025-08-26 |
| Wuwenxue | 3 | 2023-10-31 |
| New Era Construction & Management LLC | 3 | 2024-04-30 |
| T-B Contractor Co. | 3 | 2024-12-12 |
| Phu Duong | 2 | 2023-10-02 |
| Kien Phung General Contractor Inc | 2 | 2023-09-19 |
| R&Dd Builders Inc | 2 | 2025-05-30 |
| Ding Zeng Yang | 2 | 2026-10-01 |
33 named participants share a resolved project timeline with Nhan T Le. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 6313 RISING SUN AVE | 2026-10-16 |
| 1830 S 68TH ST | 2026-10-08 |
| 1327 N FRAZIER ST | 2026-10-01 |
| 1327 SAINT VINCENT ST | 2026-08-24 |
| 701 CATHEDRAL RD | 2026-08-17 |
| 7708 DELPHI PL | 2026-08-10 |
| 106 W NEDRO AVE | 2026-08-10 |
| 1730 S 28TH ST | 2026-08-10 |
| 2517 ISLAND AVE | 2026-08-10 |
| 778 S 18TH ST | 2026-07-12 |
| 1412 FRANKFORD AVE | 2026-07-06 |
| 7238 MONTOUR ST | 2026-06-23 |
| 7729 CASTOR AVE | 2026-06-05 |
| 2037 CHELTEN AVE | 2026-05-11 |
116 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| All Liberty One Construction LLC | 14 | 2024–2026 |
| Anthony Franklin | 14 | 2021–2025 |
| Fontenelle Philogene | 7 | 2021–2026 |
| Beng Ding | 7 | 2023–2026 |
| Colin Johnson | 7 | 2022–2025 |
| Anthony L Davis Jr | 6 | 2023–2026 |
| Philly Telecom | 6 | 2021–2026 |
| Sanhuai Lu | 6 | 2024–2025 |
Companies that also appear in Philadelphia permit records at addresses where Nhan T Le filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
149 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| CP-2026-004718 | 2026-10-16 | Building | 6313 RISING SUN AVE | MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION #644764 TO INCLUDE LEGALIZATION OF STRUCTURAL REPAIRS TO EXTERIOR WALLS AND ROOF FRAMING PER APPROVED PLANS, ENGINEER’S REPORT AND | |
| PP-2026-014098 | 2026-10-08 | Plumbing | 1830 S 68TH ST | Replacing defective curb stop and fresh in inlet - Approved plumbing repair work per EZ Permit Standard for Plumbing | |
| MP-2026-005421 | 2026-10-01 | Mechanical | 1327 N FRAZIER ST | EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from the | |
| PP-2026-011776 | 2026-08-25 | Plumbing | 1327 N FRAZIER ST | - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing. | |
| PP-2026-011392 | 2026-08-24 | Plumbing | 1327 SAINT VINCENT ST | - Approved plumbing work associated with an Alteration per EZ Permit Standard for Plumbing | |
| MP-2026-004036 | 2026-08-17 | Mechanical | 701 CATHEDRAL RD | FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIO | |
| PP-2026-009348 | 2026-08-17 | Plumbing | 701 CATHEDRAL RD | Plumbing Permit (Interior) for combo CP-2026-003293 | |
| PP-2026-007789 | 2026-08-10 | Plumbing | 7708 DELPHI PL | Plumbing installed to the 2018 Philadelphia Plumbing Code section 919(Philadelphia Single Stack/venting System) and be listed on plan | |
| PP-2026-011038 | 2026-08-10 | Plumbing | 106 W NEDRO AVE | Installing 1 water closet, 1 lavatory & 1 shower/tub. | |
| PP-2026-011039 | 2026-08-10 | Plumbing | 1730 S 28TH ST | Installing 4 water closets, 4 lavatories, 3 shower/tubs, 1 kitchen sink, 1 laundry outlet & 1 hot water heater. | |
| PP-2026-008098 | 2026-08-10 | Plumbing | 2517 ISLAND AVE | Plumbing Permit (Interior) for combo CP-2026-000899: ALTERATIONS TO CREATE A TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING | |
| PP-2026-006431 | 2026-07-12 | Plumbing | 778 S 18TH ST | New sanitary lines and water supply lines installation for the new bathrooms and kitchen as per plumbing plan. | |
| PP-2026-007451 | 2026-07-06 | Plumbing | 1412 FRANKFORD AVE | ALTERATIONS TO EXISTING RESTAURANT. . INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTI | |
| PP-2025-015460 | 2026-06-23 | Plumbing | 7238 MONTOUR ST | Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012142 | |
| MP-2026-002966 | 2026-06-05 | Mechanical | 7729 CASTOR AVE | FOR INSTALLATION OF VENTILATION APPLIANCES, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. | |
| PP-2026-005341 | 2026-06-05 | Plumbing | 7729 CASTOR AVE | Running new plumbing for 1 ADA restroom, 1 employee restroom, 1 double hand sink, 1 utility sink, 6 pedicures chairs. Hot and cold to fixtures. | |
| PP-2026-006227 | 2026-05-11 | Plumbing | 2037 CHELTEN AVE | Running new plumbing for one full bathroom and one laundry sink. | |
| CP-2026-002319 | 2026-05-04 | Building | 7729 CASTOR AVE | FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIB | |
| PP-2026-005342 | 2026-04-23 | Plumbing | 2012 S 27TH ST | Correcting other people works without out permit. 1 full bathroom and 1 kitchen sink | |
| PP-2026-004377 | 2026-04-14 | Plumbing | 1229 TYSON AVE | Running new plumbing for 2.5 bathrooms, 1 kitchen sink and 1 water heater. | |
| PP-2026-000999 | 2026-03-06 | Plumbing | 6501-95 E ROOSEVELT BLVD | Plumbing Permit (Interior) for combo CP-2026-000090: plumbing per plans. | |
| PP-2026-001116 | 2026-01-28 | Plumbing | 8259 FORREST AVE | Running new plumbing for 3 full bathrooms, 1 kitchen sink, 1 laundry and hot and cold water to 11 fixtures. | |
| CP-2025-004870 | 2025-12-29 | Building | 6313 RISING SUN AVE | MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION #644764 TO INCLUDE LEGALIZATION OF STRUCTURAL REPAIRS TO EXTERIOR WALLS AND ROOF FRAMING PER APPROVED PLANS, ENGINEER’S REPORT AND | |
| PP-2025-012630 | 2025-12-25 | Plumbing | 40 W CHELTEN AVE | INTERIOR ALTERATIONS TO EXISTING BUILDING. INSTALLATION OF DRAINAGE WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING AND MATERIA | |
| RP-2025-012068 | 2025-12-21 | Residential Building | 8259 FORREST AVE | Level I interior alterations to an existing two family dwelling including, Remodel 2 existing bathrooms, add 1 new bathroom in basement and remodel the existing kitchen. | |
| PP-2025-016133 | 2025-12-15 | Plumbing | 1355 E SEDGLEY AVE | Correcting other people plumbing work without permit 3 1/2 bathrooms, 1 kitchen sink, 1 washer, 1 hot water heater 14 FIXTURES | |
| PP-2025-015461 | 2025-12-09 | Plumbing | 7238 MONTOUR ST | Plumbing Permit (Interior) for combo RP-2025-012142 | |
| PP-2025-015796 | 2025-12-08 | Plumbing | 2021 N 32ND ST | REPLACE 11 FIXTURES TO 2.5 bathrooms, 1 kitchen sink, 1 laundry sink, and 1 hot water heater. Hot and cold water to fixtures. | |
| PP-2025-014649 | 2025-12-04 | Plumbing | 2712 JUDSON ST | Replace tub, lav, water closet, kitchen sink and new utility sink and laundry stand pipe. Install new water heater. 7 FIXTURES | |
| PP-2025-015540 | 2025-12-03 | Plumbing | 5514 PEMBERTON ST | Remodel of 1 full bathroom, 1 kitchen sink & 1 hot water heater. | |
| PP-2025-013679 | 2025-10-21 | Plumbing | 1311 SAINT VINCENT ST | Replace 1 kitchen sink, 1 W,C., 1 Shower, 1 Lav | |
| PP-2025-011921 | 2025-10-02 | Plumbing | 1934 GREEN ST | ALTERATION TO FIRST FLOOR AND BASEMENT. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND | |
| MP-2025-004901 | 2025-09-29 | Mechanical | 7242 RISING SUN AVE | Mechanical / Fuel Gas Permit for combo CP-2025-001851 FOR THE INSTALLATION OF NAIL AND PEDICURE STATIONS SOURCE CAPTURE EXHAUST SYSTEM WITH MAKEUP AIR AS PER APPROVED PLANS AND IN | |
| PP-2025-012347 | 2025-09-29 | Plumbing | 7242 RISING SUN AVE | Plumbing Permit (Interior) for combo CP-2025-001851 plumbing per plans | |
| CP-2025-001851 | 2025-09-29 | Building | 7242 RISING SUN AVE | FOR EXTERIOR ALTERATIONS TO THE STOREFRONT FACADE AND FOR LEVEL II INTERIOR ALTERATIONS WITH A COMPLETE CHANGE IN OCCUPANCY TO GROUP B PERSONAL SERVICES (NAIL SALON). EXISTING BUIL | |
| PP-2025-010356 | 2025-09-14 | Plumbing | 2005 GREEN ST | Add new plumbing for 1 full bathroom and washer in basement. 1st floor remodel 1 full bathroom and kitchen sink. | |
| PP-2025-011574 | 2025-09-12 | Plumbing | 2834 NEWBERRY RD | Remodel 2 full bathroom, 1 kitchen sink, 1 washer, new water heater | |
| PP-2025-010515 | 2025-09-11 | Plumbing | 1322 S 21ST ST | 3/4 WATER SERVICE | |
| MP-2025-004455 | 2025-08-30 | Mechanical | 40 W CHELTEN AVE | Mechanical / Fuel Gas Permit for combo CP-2025-004193 | |
| PP-2025-010355 | 2025-08-27 | Plumbing | 2247 S 15TH ST | INSTALL/REPLACE PLUMBING TO 11 FIXTURES for 2 1/2 bathrooms, 1 kitchen sink, 1 washer and 1 new water heater. | |
| PP-2025-009330 | 2025-08-26 | Plumbing | 1714 WASHINGTON AVE | Rough in plumbing for a commercial kitchen fixtures and 2 ADA restrooms. Hot and cold water to fixtures. | |
| CP-2025-004193 | 2025-08-25 | Building | 40 W CHELTEN AVE | FOR THE INSTALLATION OF TWO (2) HVAC ROOF TOP APPLIANCES AND DUCT WORK FOR USE AS PERSONAL SERVICES- NAIL SOLON. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFI | |
| MP-2025-003845 | 2025-07-23 | Mechanical | 2338 MOORE ST | EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from the | |
| PP-2025-008571 | 2025-07-16 | Plumbing | 1322 S 21ST ST | Running new plumbing for 1 full bathroom, 1 kitchen sink, 1 ada restroom and 2 water heater | |
| ZP-2024-011295 | 2025-07-02 | Zoning | 4255 MALTA ST | Erection of a sunroom (one story addition) to an existing single family attached structure, size and location as shown on the plan. changes include elimination of existing interior | |
| PP-2025-007139 | 2025-06-02 | Plumbing | 1343 LONGSHORE AVE | Replacing old plumbing pipes with PVC for 2 full bathroom and 1 kitchen sink. | |
| PP-2025-005773 | 2025-05-30 | Plumbing | 2815 GRAYS FERRY AVE | INTERIOR ALTERATIONS TO RETAIL SPACE. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 6 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. | |
| PP-2025-002818 | 2025-04-02 | Plumbing | 1003-15 RACE ST | INTERIOR ALTERATIONS/FIT-OUT TO BUBBLE TEA STORE. INSTALLATIOJN OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 10 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPRO | |
| PP-2025-003941 | 2025-03-28 | Plumbing | 7274 HANFORD ST | Running new plumbing for ice cream shop. 1 w.c, 1 lav, 1 hub drain, 1 hand sink, 1 prep sink, 1 3-comp sink, 1 grease trap. Hot and cold water to fixtures. | |
| PP-2025-002638 | 2025-03-25 | Plumbing | 7124-62 RIDGE AVE | INTERIOR ALTERATIONS TO RETAIL SPACE. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 6 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
